File No. 70-9785

                       SECURITIES AND EXCHANGE COMMISSION
                             Washington, D.C. 20549
                        ---------------------------------

                                 AMENDMENT NO. 2
                                       TO
                                    FORM U-1
                       ----------------------------------

                           APPLICATION OR DECLARATION

                                    under the

                   PUBLIC UTILITY HOLDING COMPANY ACT OF 1935
                                      * * *

                      AMERICAN ELECTRIC POWER COMPANY, INC.
                     1 Riverside Plaza, Columbus, Ohio 43215
                     ---------------------------------------

                   AMERICAN ELECTRIC POWER SERVICE CORPORATION
                     1 Riverside Plaza, Columbus, Ohio 43215
                     ---------------------------------------

                       CENTRAL AND SOUTH WEST CORPORATION
                     1 Riverside Plaza, Columbus, Ohio 43215
                     ---------------------------------------

                         CENTRAL POWER AND LIGHT COMPANY
          539 North Carancahua Street, Corpus Christi, Texas 78401-2802
          -------------------------------------------------------------

                         COLUMBUS SOUTHERN POWER COMPANY
                     1 Riverside Plaza, Columbus, Ohio 43215
                     ---------------------------------------

                               OHIO POWER COMPANY
                 301 Cleveland Avenue, S.W., Canton, Ohio 44702
                 ----------------------------------------------

                       SOUTHWESTERN ELECTRIC POWER COMPANY
               428 Travis Street, Shreveport, Louisiana 71156-0001
               ---------------------------------------------------

                          WEST TEXAS UTILITIES COMPANY
                  301 Cypress Street, Abilene, Texas 78601-5820
                  ---------------------------------------------
               (Name of company or companies filing this statement
                  and addresses of principal executive offices)
                                      * * *

                      AMERICAN ELECTRIC POWER COMPANY, INC.
                     1 Riverside Plaza, Columbus, Ohio 43215
                     ---------------------------------------
                     (Name of top registered holding company
                     parent of each applicant or declarant)
                                      * * *

                         Susan Tomasky, General Counsel
                   AMERICAN ELECTRIC POWER SERVICE CORPORATION
                     1 Riverside Plaza, Columbus, Ohio 43215
                     ---------------------------------------
                     (Name and address of agent for service)




                                TABLE OF CONTENTS

                                                                            PAGE
                                                                          NUMBER
Glossary of Terms ............................................................ I
Item 1.   Description of the Proposed Transaction ...........................  1
          A.  Introduction ..................................................  1
          B.  Description of the Applicants .................................  3
          C.  Overview of the Proposed Restructuring ........................  5
              1.  Reorganization of the Texas Operating Companies ...........  7
              2.  Reorganization of the Ohio Operating Companies ............  9
          D.  Overview of Requested Authorizations ..........................  9
              1. The Transaction ............................................  9
                 a.  Formation and Capitalization of Enterprises,
                     Wholesale Holdco and Domestic Holdco ................... 10
                 b.  Formation of Texas PGCs and Tax Beneficial Entities .... 10
                 c.  Formation of EDC Subsidiaries .......................... 11
                 d.  Capitalization of Subsidiaries ......................... 11
                 e.  Transfers .............................................. 12
             2.  Agreements ................................................. 15
             3.  Services, Goods and Assets Involving the
                 Utility Operating Companies ................................ 16
         E.  Financing Plan ................................................. 17
             1.  Overview of the Financing Request .......................... 17
             2.  Parameters for Financing and Hedging
                 Transaction Authorization .................................. 18
                 a.  Effective Cost of Money ................................ 18
                 b.  Maturity of Debt and Final Redemption
                     on Preferred Securities ................................ 19
                 c.  Insurance Expenses ..................................... 19
                 d.  Use of Proceeds ........................................ 19
                 e.  Financial Condition .................................... 20
                 f.  Hedging Transactions ................................... 22
             3.  AEP Guarantees, Intra-system Advances and
                 EWG Investment ............................................. 23
                 a.  Guarantees ............................................. 23
                 b.  Intra-system Advances .................................. 25
                 c.  EWG Investment ......................................... 25
             4.  Unregulated Holding Companies Authority .................... 26
                 a.  Financing Authority .................................... 26
                 b.  Guarantee Authority .................................... 27
                 c.  Hedging Transaction Authority .......................... 27
                 d.  Intra-system Advances .................................. 27
             5.  Unregulated Subsidiaries Authority ......................... 27
                 a.  Financing Authority .................................... 27
                 b.  Guarantee Authority .................................... 28
                 c.  Hedging Transaction Authority .......................... 28




                                                                            PAGE
                                                                          NUMBER
             6.  Reg Holdco Authority ....................................... 28
                 a.  Financing Authority .................................... 28
                 b.  Guarantee Authority .................................... 29
                 c.  Hedging Transaction Authority .......................... 29
                 d.  Intra-system Advances .................................. 29
             7.  Regulated Subsidiaries Authority ........................... 29
                 a.  Financing Authority .................................... 29
                 b.  Guarantee Authority .................................... 30
                 c.  Money Pool Authority ................................... 30
                 d.  Hedging Transaction Authority .......................... 30
             8.  Finance Subsidiary Authority ............................... 30
         F.  AEP's Non-utility Holdings ..................................... 31
         G.  Request for Authority to Pay Dividends Out of Capital or
             Unearned Surplus by the Utility Subsidiaries ................... 31
         H.  Other Regulatory Approvals ..................................... 32
Item 2.  Fees, Commissions and Expenses ..................................... 33
Item 3.  Applicable Statutory Provisions .................................... 33
         A.  Sections 9 and 10 .............................................. 34
             1.  The Transaction Complies With State Law .................... 35
             2.  The Capital Structure is not Unduly Complicated ............ 35
             3.  The Consideration is Fair and Reasonable ................... 37
         B.  Section 12 and Rule 46 ......................................... 37
         C.  Section 13(b) Compliance ....................................... 38
         D.  Rule 54 Compliance ............................................. 39
Item 4.  Regulatory Approval ................................................ 40
Item 5.  Procedure .......................................................... 40
Item 6.  Exhibits and Financial Statements .................................. 41
                  a.  Exhibits .............................................. 41
                  b.  Financial Statements .................................. 41
Item 7.  Information as to Environmental Effects ............................ 42
Signature ................................................................... 42




                                GLOSSARY OF TERMS

     When the following terms and abbreviations appear in the text of this
Application, they have the meanings indicated below:


                TERM                                  MEANING

1935 Act.............................  Public Utility Holding Company Act of
                                       1935

AEP..................................  American Electric Power Company, Inc.

AEPSC................................  American Electric Power Service
                                       Corporation

Applicants...........................  AEP, AEPSC, CPL, CSP, CSW, OPCo, SWEPCO
                                       and WTU

Commission...........................  Securities and Exchange Commission

CPL..................................  Central Power and Light Company


CPL EDC..............................  CPL following the transfer of its
                                       generating assets and related liabilities

CPL PGC..............................  A to-be-formed PGC organized to hold the
                                       generating assets and related liabilities
                                       of CPL

CPL PGC LLC..........................  A to-be-formed limited liability company
                                       organized by CPL PGC to act as the
                                       general partner of CPL PGC LP

CPL PGC LP...........................  a to-be-formed limited partnership
                                       organized by CPL PGC to hold its
                                       generation assets and related liabilities

CSP..................................  Columbus Southern Power Company

CSP EDC..............................  a to-be-formed EDC organized to hold the
                                       transmission and distribution assets and
                                       related liabilities of CSP

CSP PGC..............................  CSP following the transfer of its
                                       transmission and distribution assets and
                                       related liabilities

CSW..................................  Central and South West Corporation

Domestic Holdco......................  Domestic Generating Holding Company, a
                                       to-be-formed wholly owned subsidiary
                                       corporation or limited liability company
                                       of Wholesale Holdco

EDC..................................  Energy Delivery Company


Enterprises..........................  AEP Enterprises, a to-be-formed wholly
                                       owned subsidiary corporation or limited
                                       liability company of AEP



                TERM                                  MEANING

ETCs.................................  exempt telecommunications companies
                                       within the meaning of Section 34 of the
                                       1935 Act and related rules thereunder

EWGs.................................  exempt wholesale generators within the
                                       meaning of Section 32 of the 1935 Act and
                                       related rules thereunder

FERC.................................  Federal Energy Regulatory Commission

Finance Applicants...................  CPL EDC, CPL PGC, CPL PGC LLC, CPL PGC
                                       LP, CSP EDC, CSP PGC, Domestic Holdco,
                                       Enterprises, OPCo EDC, OPCo PGC, Reg
                                       Holdco, SWEPCO EDC, Wholesale Holdco, WTU
                                       EDC, WTU PGC, WTU PGC LLC and WTU PGC LP


FUCOs................................  Foreign Utility Companies within the
                                       meaning of Section 33 of the 1935 Act and
                                       related rules thereunder


Holding Companies....................  collectively, Enterprises, Wholesale
                                       Holdco, Domestic Holdco and Reg Holdco

LPSC.................................  Louisiana Public Service Commission

OPCo ................................  Ohio Power Company

OPCo EDC.............................  a to-be-formed EDC organized to hold the
                                       transmission and distribution assets and
                                       related liabilities of OPCo

OPCo PGC.............................  OPCo following the transfer of its
                                       transmission and distribution assets and
                                       related liabilities

Operating Companies..................  collectively, CPL, CSP, OPCo, SWEPCO and
                                       WTU

PGC..................................  Power Generating Company

PUCO.................................  Public Utilities Commission of Ohio

PUCT.................................  Public Utility Commission of Texas

Reg Holdco...........................  Central and South West Corporation

Regulated Subsidiaries...............  CPL EDC, CSP EDC, OPCo EDC, SWEPCO EDC
                                       and WTU EDC

REP..................................  Retail Electric Provider

Restructured Generation Assets ......  The generation assets of CPL, CSP, OPC
                                       and WTU immediately prior to the
                                       Transaction

Rule 58 Subsidiaries.................  energy related companies within the
                                       meaning of Rule 58



                TERM                                  MEANING

STP..................................  South Texas Project 2,630 MW nuclear
                                       generating station

Subsidiaries.........................  the to-be-formed wholly-owned direct and
                                       indirect subsidiaries of each Operating
                                       Company

SWEPCO...............................  Southwestern Electric Power Company


SWEPCO EDC...........................  a to-be-formed EDC organized to hold the
                                       transmission and distribution assets and
                                       related liabilities of SWEPCO situated in
                                       Texas

Unregulated Holding Companies........  Enterprises, Wholesale Holdco and
                                       Domestic Holdco

Unregulated Subsidiaries.............  CPL PGC, CPL PGC LLC, CPL PGC LP, CSP,
                                       OPCo, WTU PGC, WTU PGC LLC and WTU PGC LP

Unregulated Unit.....................  the direct and indirect subsidiaries of
                                       Enterprises

Utility Subsidiaries.................  CPL EDC, CPL PGC, CPL PGC LLC, CPL PGC
                                       LP, CSP EDC, CSP PGC, OPCo EDC, OPCo PGC,
                                       SWEPCO, SWEPCO EDC, WTU EDC, WTU PGC, WTU
                                       PGC LLC and WTU PGC LP

Vertically-Integrated Companies .....  AEP Generating Company, Appalachian Power
                                       Company, Indiana Michigan Power Company,
                                       Kentucky Power Company, Kingsport Power
                                       Company and Wheeling Power Company (each
                                       of which is currently directly owned by
                                       AEP and (except for AEP Generating
                                       Company) remains subject to regulation by
                                       at least one state utility commission)

Wholesale Holdco.....................  Wholesale Holding Company, a to-be-formed
                                       wholly owned subsidiary corporation or
                                       limited liability company of Enterprises

WTU..................................  West Texas Utilities Company

WTU EDC..............................  WTU following the transfer of its
                                       generation assets and related liabilities

WTU PGC..............................  a to-be-formed PGC organized to hold the
                                       generation assets and related liabilities
                                       of WTU

WTU PGC LLC..........................  a to-be-formed limited liability company
                                       organized by WTU PGC to act as the
                                       general partner of WTU PGC LP

WTU PGC LP ..........................  a to-be-formed limited partnership
                                       organized by WTU PGC to hold its
                                       generation assets and related liabilities




     This amendment restates in its entirety Amendment No. 1 to the
Application-Declaration filed on August 22, 2001.

ITEM 1.   DESCRIPTION OF THE PROPOSED TRANSACTIONS

     A.   INTRODUCTION

     AEP and CSW, holding companies registered under the 1935 Act, CPL, CSP,
OPCo, SWEPCO, WTU, each a direct or indirect wholly owned public utility
electric subsidiary of AEP, and AEPSC, hereby file this Application-Declaration
with the Commission under Sections 6(a), 7, 9(a), 10, 12 and 13(b) of the 1935
Act, and Rules 43(a), 44, 45, 46, 54, 90 and 91 thereunder, for authority to
engage in certain transactions in connection with state mandated restructuring
in Ohio and Texas.

     AEP holds vertically-integrated electric utility companies with retail
utility operations in eleven states - Arkansas, Indiana, Kentucky, Louisiana,
Michigan, Ohio, Oklahoma, Tennessee, Texas, Virginia and West Virginia. These
states have reached different decisions as to whether, when and how to
restructure their electric industries. Texas and Ohio have opted to deregulate
generation, require separation of the generation and energy delivery functions,
and eliminate the concept of native load retail service, all in favor of free
and open competition at retail and have approved restructuring plans that are to
be implemented by January 1, 2002.

     Under these approved plans, the Operating Companies will legally separate
their assets between:

          o    PGC affiliates that will sell power and energy at wholesale, and

          o    EDC affiliates that will own transmission and local distribution
               facilities and transport the energy and perform metering
               functions.

In connection with this restructuring, AEP proposes to realign certain of its
utility and non-utility businesses under three first-tier subsidiaries in a
manner similar to that approved in Exelon Corporation, HCAR No. 27259 (Oct. 20,
2000). Of interest here:



          o    CSW, as the Reg Holdco(1), will serve as an intermediate holding
               company for the EDC affiliates and certain other AEP
               public-utility subsidiary companies that are not required to
               restructure, including, subject to any necessary state approval,
               the Vertically-Integrated Companies.

          o    Enterprises will serve as an intermediate holding company for
               AEP's non-utility businesses and, through Wholesale Holdco and
               Domestic Holdco, for the PGC affiliates and the system's other
               "unregulated" generation.

          o    AEPSC will continue to provide services to the AEP system
               companies. Among other things, AEPSC will provide centralized and
               regionalized management and support for both regulated and
               unregulated generation.

Charts setting forth the AEP system and the Operating Companies
post-restructuring are attached hereto as Exhibit B-1. The mechanics of the
proposed restructuring are described more fully herein.

     AEP respectfully requests authority to form and capitalize Enterprises,
Wholesale Holdco, Domestic Holdco and Subsidiaries to be formed for the purpose
of acquiring and holding certain utility and other assets of each Operating
Company and for each Operating Company to transfer to the applicable Subsidiary
certain utility and other assets (the "Transfers") and for certain of the
Operating Companies and Subsidiaries to be dividended to AEP and for AEP to
contribute certain of the Operating Companies and Subsidiaries to Enterprises,
Wholesale Holdco, Domestic Holdco and/or Reg Holdco to implement their
respective plans to separate their generation and power marketing businesses
from their transmission and distribution businesses in the states of Texas and
Ohio as more fully described herein (the "Transaction").

     Certain financing authority will be required in connection with the
restructuring. These financing requests, which are

----------

(1)  Throughout this Application-Declaration names are used for affiliates of
the Applicants that are intended to be descriptive of the functions such
affiliates will serve after the reorganization of the AEP system to comply with
the state restructuring laws of Ohio and Texas is completed. Such names are
fictitious and used as a matter of descriptive convenience. The actual legal
names of such affiliates will be determined as part of the implementation of
such reorganization.

                                       2



described more fully herein at Item 1.E., are consistent with the ongoing needs
of the restructured entities and similar to the "housekeeping" authority that
the Commission has granted to other companies.

     B.   DESCRIPTION OF THE APPLICANTS

     AEP is a corporation organized and existing under the laws of New York,
with its principal offices in Columbus, Ohio. AEP is one of the largest investor
owned electric public utility holding companies in the United States serving
over 4.8 million retail customers in eleven states and selling bulk power at
wholesale both within and beyond its domestic retail service area. AEP and CSW
completed their merger on June 15, 2000 and as a result AEP now has 38,000
megawatts of generation, over 38,000 miles of transmission lines and 186,000
miles of distribution lines in the United States. Subsidiaries own 544 megawatts
as independent power producers in Colorado, Florida and Texas. In recent years
AEP has expanded its domestic operations to include gas marketing, processing,
storage and transportation operations, electric, gas and coal trading operations
and telecommunication services. Subsidiaries also provide power engineering,
generation and transmission plant maintenance and construction, and energy
management services worldwide. AEP is one of the largest traders of electricity
and gas in the United States.

     AEP intends to continue to expand its competitive energy business by
growing the trading and marketing business through expanding operations to be a
leading trader in all energy commodities; optimizing the operations of its
assets to yield maximum value in competitive markets; and acquiring generation
and natural gas assets that complement this strategy.

     As of July 24, 2001, Standard & Poor's rating of AEP's senior unsecured
indebtedness was BBB+ while Moody's was Baa1.

     CPL is a corporation organized and existing under the laws of the state of
Texas, and has its principal office in Corpus Christi, Texas. CPL is a wholly
owned subsidiary of CSW, and an indirect subsidiary of AEP and is a public
utility under the 1935 Act. CPL is engaged in generating, transmitting and
distributing electric energy to the public in south Texas. CPL also owns an
undivided 25.2% interest in STP Nuclear Operating Company, which operates and
maintains the STP, of which CPL owns an 25.2% undivided interest. CPL serves
approximately 661,000 retail customers. In addition to its undivided interest in
STP,

                                       3



CPL owns 3,861 MW of coal- and gas-fired generating capacity. As of July 24,
2001, Standard & Poor's rating of CPL's senior unsecured indebtedness was BBB+
while Moody's was Baa1.

     CSP is a corporation organized and existing under the laws of the state of
Ohio, and has its principal office in Columbus, Ohio. CSP is a wholly owned
subsidiary of AEP and is a public utility under the 1935 Act. CSP is engaged in
generating, transmitting and distributing electric energy to the public in
central and southern Ohio. CSP owns 2,595 MW of coal-fired generating capacity
which includes 1,330 MW in generating facilities jointly owned with two
unaffiliated utilities. CSP serves approximately 658,000 retail customers in
Ohio. CSP also sells electricity to wholesale customers. As of July 24, 2001,
Standard & Poor's rating of CSP's senior unsecured indebtedness was BBB+ while
Moody's was A3.

     OPCo is a corporation organized and existing under the laws of the state of
Ohio, and has its principal office in Canton, Ohio. OPCo is a wholly owned
subsidiary of AEP and is a public utility under the 1935 Act. OPCo is engaged in
generating, transmitting and distributing electric energy to the public in
northwestern, east central, eastern and southern Ohio. OPCo owns 8,464 MW of
coal-fired generating capacity and 48 MW of hydroelectric generating capacity.
OPCo serves approximately 679,000 retail customers in Ohio. OPCo also sells
electricity to wholesale customers. As of July 24, 2001, Standard & Poor's
rating of OPCo's senior unsecured indebtedness was BBB+ while Moody's was A3.

     SWEPCO is a corporation organized and existing under the laws of the state
of Delaware, and has its principal office in Shreveport, Louisiana. SWEPCO is a
wholly owned subsidiary of CSW, and an indirect subsidiary of AEP and is a
public utility under the 1935 Act. SWEPCO is engaged in generating, transmitting
and distributing electric energy to the public in east Texas, northwestern
Louisiana and southwestern Arkansas. SWEPCO owns 4,487 MW of coal- and gas-fired
generating capacity. SWEPCO serves approximately 422,000 retail customers.
SWEPCO also sells electricity to wholesale customers. As of July 24, 2001,
Standard & Poor's rating of SWEPCO's senior unsecured indebtedness was BBB+
while Moody's was A2.

     WTU is a corporation organized and existing under the laws of the state of
Texas, and has its principal office in Abilene, Texas. WTU is a wholly owned
subsidiary of CSW, and an indirect subsidiary of AEP and is a public utility
under the 1935 Act.


                                       4



WTU is engaged in generating, transmitting and distributing electric energy to
the public in western and northern parts of Texas. WTU owns 1,376 MW of coal and
gas-fired generating capacity. WTU serves approximately 189,000 retail
customers. WTU also sells electricity to wholesale customers. As of July 24,
2001, Standard & Poor's rating of WTU's senior unsecured indebtedness was BBB+
with no corresponding Moody's rating of senior unsecured indebtedness.

     ENTERPRISES, WHOLESALE HOLDCO AND DOMESTIC HOLDCO. For a variety of tax,
regulatory and business reasons, AEP has determined that the best way to
organize its non-utility subsidiaries is through the creation of Enterprises.
Enterprises will be a first tier subsidiary of AEP. It will own all of Wholesale
Holdco. Wholesale Holdco, in turn, will own Domestic Holdco, which will hold,
directly or indirectly, the PGCs. Enterprises, Wholesale Holdco and Domestic
Holdco will be formed to hold utility and non-utility subsidiaries of AEP whose
revenues derive from competitive, usually market-based, activity. This structure
allows AEP to align its non-utility enterprises and its non-State regulated
electric generating business in an efficient and simple manner. AEP is seeking
EWG status for CPL PGC, WTU PGC, their respective subsidiaries, CSP PGC and OPCo
PGC. If EWG status is not obtained within twelve months of the date of the
anticipated order in this file, Enterprises, Wholesale Holdco and Domestic
Holdco will register as holding companies under the 1935 Act.

     REG HOLDCO. Likewise, for a variety of tax, regulatory and business
reasons, AEP has determined that it wishes to retain another intermediate
holding company - Reg Holdco - in its corporate organization. This company would
hold the EDCs and, in some instances subject to any necessary state approval,
other operating utility subsidiaries that are not required to restructure,
including the Vertically-Integrated Companies. Reg Holdco is a holding company
and will remain a registered company following the Transaction.

     C.   OVERVIEW OF THE PROPOSED RESTRUCTURING

     The assets involved in the Transfers are generating facilities, the step-up
transformers, circuit breakers, interconnection facilities, related facilities
and other assets associated with generating units and their operations that CPL
and WTU will transfer to CPL PGC and WTU PGC, respectively, and transmission
lines and other transmission facilities and distribution lines and other
distribution facilities and other

                                       5



assets that CSP, OPCo and SWEPCO will transfer to CSP EDC, OPCo EDC and SWEPCO
EDC, respectively, that will be chartered to own, maintain and operate
transmission and distribution facilities located in the states of Ohio and
Texas, respectively.

     Exhibit B-1 to this Application contains diagrams of the pre-Transfer and
post-Transfer organizations of Applicants and their relevant affiliates. Exhibit
D-7 to this Application contains a list of the generating stations that CPL and
WTU will transfer to CPL PGC and WTU PGC, respectively, and a description of the
transmission and distribution facilities that CSP, OPCo and SWEPCO will transfer
to CSP EDC, OPCo EDC and SWEPCO EDC, respectively.

     CPL, SWEPCO and WTU will make their Transfers to comply with the provisions
of a Texas statute commonly referred to as S.B. 7.(2) S.B. 7 requires vertically
integrated electric utilities to separate ownership of their generating and
other power supply assets from ownership of their transmission and distribution
assets no later than January 1, 2002. Under S.B. 7, vertically integrated
utilities are generally obligated to disaggregate into at least three separate
corporate units: (1) a PGC that will sell power and energy at wholesale; (2) an
EDC that will own transmission and local distribution facilities and perform
metering functions, but is prohibited from owning power supply facilities or
selling electricity; and (3) a REP that will sell electricity to retail
customers. By order issued July 7, 2000, the PUCT approved corporate separation
plans CPL, WTU and SWEPCO filed to explain how they will comply with S.B. 7 (see
Exhibit D-2 to this Application). Per PUCT Substantive Rule 25.342(d)(4), all
transfers made in compliance with S.B. 7 must be recorded at book value.

     CSP and OPCo will make their Transfers to comply with the provisions of an
Ohio statute that provides for Competitive Retail Electric Service, commonly
referred to as S.B. 3.3 The statute directs vertically integrated electric
utilities that offer retail electric service in Ohio to separate their
generating and other competitive operations (such as aggregation, marketing, and
brokering) and related assets from their transmission and distribution
operations and assets. On September 28, 2000, the PUCO approved corporate
separation plans CSP and OPCo filed to explain how they will comply with S.B.(3)


----------


(2)  Tex. Util. Code Ann.ss.39.001-909 (Vernon Supp. 2000).

(3)  Ohio Rev. Code Ann.ss.ss.4928.01-67 (Anderson 2000).

                                       6



(see Exhibit D-4 to this Application). Under their approved corporate separation
plans (which plans assume that all transfers will be made at book value), CSP
and OPCo proposed, subject to receipt of federal regulatory approvals, to
transfer their transmission and distribution assets and operations to EDC
affiliates.

          1.   REORGANIZATION OF THE TEXAS OPERATING COMPANIES

          To comply with S.B. 7, each of CPL and WTU will contribute their
generating assets to newly formed PGC affiliates, WTU PGC and CPL PGC.(4)
Subsequently, CPL EDC and WTU EDC will dividend the common stock of, or limited
liability interest in, CPL PGC and WTU PGC to Reg Holdco, which, in turn, will
dividend the stock or limited liability interest to AEP.(5) In turn, AEP will
contribute such common stock or limited liability interest to Enterprises, which
will contribute such common stock or limited liability interest to Wholesale
Holdco, which will contribute such common stock or limited liability interest to
Domestic Holdco. AEP is seeking state consent for EWG status for CPL PGC and WTU
PGC including their respective subsidiaries as more fully described below.(6)

----------

(4)  CPL has committed to divest by June 2002 its Lon Hill Units 1-4, which have
an aggregate generating capability of 546 MW, its Nueces Bay plant, which has a
generating capability of 559 MW, and its Joslin Unit 1, which has a generating
capability of 249 MW, subject to certain recall rights with respect to CPL's
obligation to serve retail customers in ERCOT. CPL made this commitment in
connection with the PUCT proceedings brought to consider the merger of CSW and
AEP. AEP is seeking EWG status for the entity owning these units. In the event
EWG status is not obtained in time, divestiture of such generating capability to
third parties is sought from the Commission pursuant to Section 12(d) of the
1935 Act.

(5)  CPL and WTU may delay the transfer of their stock in CPL PGC and WTU PGC
until sometime after June 15, 2002, in order to avoid adverse tax consequences
relating to intra-corporate transfers after a merger.

(6)  In addition to the foregoing affiliate transfers, CPL, SWEPCO and WTU seek
authority to sell certain utility assets to non-affiliates as required by
Section 39.051 of S.B. 7 which states "On or before September 1, 2000, each
electric utility shall separate from its regulated utility activities its
customer energy services business activities that are otherwise also already
widely available in the competitive market". In accordance with this Section,
PUCT developed and adopted PUCT Substantive Rule 25.341(6) which prohibits
regulated utilities from providing certain facilities and/or services that the
PUCT believes to be generally available in the open market. The prohibited
facilities and/or services identified in the Rule are classified as "competitive
energy services" and consist of nonroadway lights, distribution facilities
including distribution transformers, conductors, and associated distribution
equipment beyond the customer's primary metering point and substation facilities
dedicated to serving individual customers.

                                       7



          SWEPCO will retain title to its generating assets because it provides
bundled retail electric service in Louisiana, which to date has not adopted
retail competition legislation, and in Arkansas, where SWEPCO is not obligated
to separate ownership of its generating assets from its transmission and
distribution assets.(7) In order to comply with S.B. 7, however, on or before
January 1, 2002 (or such later date as determined by the PUCT), SWEPCO will
contribute its transmission and distribution assets located in Texas and related
business operations to a wholly owned EDC subsidiary, SWEPCO EDC. CPL EDC and
WTU EDC will retain their respective transmission and distribution assets and
after transfer of their generating assets to CPL PGC and WTU PGC, CPL EDC and
WTU EDC will operate as EDCs.

          On September 25, 2001, AEP announced that it had filed a request with
the PUCT to delay implementation of competition from January 1, 2002 until March
31, 2003 in those portions of the state that lie in the Southwest Power Pool.
The request was made to allow adequate time for infrastructure, processes and
procedures to be in place for fair competition. If granted, the delay would
effect all of SWEPCO's service territory in Texas and a small portion of WTU's
service territory.

          As illustrated by the post-Transfer organization chart in Exhibit B-1,
Reg Holdco will also hold the common stock of certain other regulated utility
subsidiaries of AEP, subject to any required state approval.

----------

CPL, SWEPCO and WTU have offered their customers the option to (i) purchase such
facilities from the utility; (ii) provide their own facilities; or (iii) convert
their service to secondary metering. Should the customer elect to purchase the
affected facilities, CPL, SWEPCO and WTU request authority to sell the affected
assets, the proceeds of which could total up to $30 million. By order of the
PUCT, the price for purchased facilities agreed to prior to October 1, 2001 will
be based on the original market cost at the time the facility was placed in
service adjusted for depreciation and undepreciated contributions in aid to
construction ("CIAC") multiplied times 1.10; provided that the total cost of the
facility will not exceed original market cost adjusted for depreciation and
undepreciated CIAC plus $15,000. After October 1, the price for purchased
facilities will be based on reproduction cost less depreciation. The actual
purchase does not have to be completed until January 1, 2004. The purchase price
for nonroadway lighting facilities must be 50% of their replacement cost as
mandated by the PUCT.

(7)  The Arkansas legislature recently postponed the start of retail electric
competition in Arkansas to a date no earlier than October 1, 2003 and no later
than October 1, 2005.

                                       8



          As a part of the Texas retail access program, the Texas retail rates
of CPL, WTU and SWEPCO are frozen until December 31, 2001. On and after January
1, 2002, bundled Texas retail residential and small commercial customers
formerly served by CPL, WTU and SWEPCO will be served by REPs at the "price to
beat" established for their respective Texas service areas.

          2.   REORGANIZATION OF THE OHIO OPERATING COMPANIES

          To comply with S.B. 3, CSP and OPCo will contribute their transmission
and distribution assets to CSP EDC and OPCo EDC, respectively. The common stock
of, or limited liability interest in, OPCo EDC and CSP EDC will be dividended to
AEP. AEP, in turn, will contribute such common stock or limited liability
interest to Reg Holdco. Surviving CSP PGC and OPCo PGC will be PGCs whose common
stock AEP will contribute to Enterprises, which will contribute such common
stock to Wholesale Holdco, which will contribute such common stock to Domestic
Holdco. AEP is seeking state consent for EWG status for CSP PGC and OPCo PGC.

          Under S.B. 3, CSP EDC and OPCo EDC must serve as default suppliers to
residential customers that do not choose an alternative power supplier. The
retail rates for power supply that OPCo EDC and CSP EDC will charge Ohio retail
residential customers that do not choose an alternative supplier will be frozen
for the first five years of retail competition, unless the PUCO finds that
effective competition with respect to particular customer classes is occurring
before the end of a five-year market development period.

     D.   OVERVIEW OF REQUESTED AUTHORIZATIONS

          1.   THE TRANSACTION

          AEP's corporate separation is designed to align the company's legal
structure and business activities with the realities of a restructuring electric
industry. Corporate separation responds to the changing laws, regulations and
business requirements of the electric industry. AEP's realigned corporate legal
structure complies with restructuring statutory and regulatory requirements and
provides greater flexibility to conduct business. This realignment consists of
actual legal corporate separation of certain subsidiaries and companies of AEP
and is not a functional reorganization of those entities. See Exhibit B-1 (the
post-Transfer corporate structure chart)


                                       9



for a complete diagram of the final corporate structure sought by Applicants.

               (a)  Formation and Capitalization of Enterprises, Wholesale
          Holdco and Domestic Holdco

               AEP seeks authorization to form and capitalize Enterprises, a
     first tier wholly owned corporation or limited liability company, Wholesale
     Holdco (a wholly-owned subsidiary corporation or limited liability company
     of Enterprises) and Domestic Holdco (a wholly-owned subsidiary corporation
     or limited liability company of Wholesale Holdco). AEP, Enterprises and
     Wholesale Holdco, respectively, propose to make an initial capital
     contribution to Enterprises, Wholesale Holdco and Domestic Holdco,
     respectively, in an amount to be determined, in exchange for all of the
     common stock of, or limited liability interest in, Enterprises, Wholesale
     Holdco and Domestic Holdco, respectively. AEP, Enterprises and Wholesale
     Holdco, respectively, seek authorization for Enterprises, Wholesale Holdco
     and Domestic Holdco to issue, and for AEP, Enterprises and Wholesale
     Holdco, respectively, to acquire, all of the common stock of, or limited
     liability interest in, Enterprises, Wholesale Holdco and Domestic Holdco,
     respectively.

               (b) Formation of Texas PGCs and Tax Beneficial Entities

               AEP seeks approval for: (1) CPL to form and capitalize CPL PGC
     for the purpose of holding the generation assets and related liabilities of
     CPL; (2) WTU to form and capitalize WTU PGC for the purpose of holding the
     generation assets and related liabilities of WTU; (3) CPL PGC to form and
     capitalize CPL PGC LLC, which would serve as the general partner of CPL PGC
     LP; (4) CPL PGC and CPL PGC LLC to form and capitalize CPL PGC LP for the
     purpose of holding the generation assets and related liabilities of CPL
     PGC; (5) WTU PGC to form and capitalize WTU PGC LLC, which would serve as
     the general partner of WTU PGC LP; and (6) WTU PGC and WTU PGC LLC to form
     and capitalize WTU PGC LP for the purpose of holding the generation assets
     and related liabilities of WTU PGC.

                                       10



               (c)  Formation of EDC Subsidiaries

               AEP seeks approval for: (1) OPCo to form and capitalize OPCo EDC
     for the purpose of holding the transmission and distribution assets and
     related liabilities of OPCo; (2) CSP to form and capitalize CSP EDC for the
     purpose of holding the transmission and distribution assets and related
     liabilities of CSP; and (3) SWEPCO to form and capitalize SWEPCO EDC for
     the purpose of holding the Texas-based transmission and distribution assets
     and related liabilities of SWEPCO.

               (d)  Capitalization of Subsidiaries

                    (i)     AEP seeks approval for CPL to acquire all of the
          common stock of, or limited liability interest in, CPL PGC in exchange
          for transferring its generation assets (including its interest in STP)
          and related liabilities to CPL PGC and for CPL PGC to issue, and for
          CPL to acquire, all of the common stock of, or limited liability
          interest in, CPL PGC.

                    (ii)    AEP seeks approval for CPL PGC to acquire all of the
          membership interests of CPL PGC LLC in exchange for sufficient
          capitalization for CPL PGC LLC to act as general partner of CPL PGC LP
          and for CPL PGC LLC to issue, and for CPL PGC to acquire, all of the
          membership interests of CPL PGC LLC.

                    (iii)   AEP seeks approval for CPL PGC to acquire all of the
          limited partnership interest of CPL PGC LP in exchange for
          transferring its generation assets and related liabilities to CPL PGC
          LP, for CPL PGC LLC to acquire the general partnership interest of CPL
          PGC LP, for CPL PGC LP to issue, and for CPL PGC to acquire, all of
          the limited partnership interest of CPL PGC LP and for CPL PGC LP to
          issue, and for CPL PGC LLC to acquire, the general partnership
          interest of CPL PGC LP.

                    (iv)    AEP seeks approval for WTU to acquire all of the
          common stock of, or limited liability interest in, WTU PGC in exchange
          for transferring its generation assets and related liabilities to WTU
          PGC and for WTU PGC to issue, and for WTU to acquire, all

                                       11



          of the common stock of, or limited liability interest in, WTU PGC.

                    (v)     AEP seeks approval for WTU PGC to acquire all of the
          membership interests of WTU PGC LLC in exchange for sufficient
          capitalization for WTU PGC LLC to act as general partner of WTU PGC LP
          and for WTU PGC LLC to issue, and for WTU PGC to acquire, all of the
          membership interests of WTU PGC LLC.

                    (vi)    AEP seeks approval for WTU PGC to acquire all of the
          limited partnership interest of WTU PGC LP in exchange for
          transferring its generation assets and related liabilities to WTU PGC
          LP, for WTU PGC LLC to acquire the general partnership interest of WTU
          PGC LP, for WTU PGC LP to issue, and for WTU PGC to acquire, all of
          the limited partnership interest of WTU PGC LP and for WTU PGC LP to
          issue, and for WTU PGC LLC to acquire, the general partnership
          interest of WTU PGC LP.

                    (vii)   AEP seeks approval for OPCo to acquire all of the
          common stock of, or limited liability interest in, OPCo EDC in
          exchange for transferring its transmission and distribution assets and
          related liabilities to OPCo EDC and for OPCo EDC to issue, and for
          OPCo to acquire, all of the common stock of, or limited liability
          interest in, OPCo EDC.

                    (viii)  AEP seeks approval for CSP to acquire all of the
          common stock of, or limited liability interest in, CSP EDC in exchange
          for transferring its transmission and distribution assets and related
          liabilities to CSP EDC and for CSP EDC to issue, and for CSP to
          acquire, all of the common stock of, or limited liability interest in,
          CSP EDC.

               (e)  Transfers

                    (i)     AEP seeks approval for CPL to transfer or contribute
          a total of 100% of its ownership interests in its generation assets
          (estimated net book value at December 31, 2000, $2,366.3 million) and
          related liabilities (estimated book value at December 31, 2000,
          $1,980.1 million) to CPL PGC at their net book value at the transfer
          date and for CPL PGC to transfer or contribute a total of 100% of its

                                       12



          ownership interests in such generation assets and related liabilities
          to CPL PGC LP at the same book value.

                    (ii)    AEP seeks approval for WTU to transfer or contribute
          a total of 100% of its ownership interests in its generation assets
          (estimated net book value at December 31, 2000, $484.1 million) and
          related liabilities (estimated book value at December 31, 2000, $333.4
          million) to WTU PGC at their net book value at the transfer date and
          for WTU PGC to transfer or contribute a total of 100% of its ownership
          interests in such generation assets and related liabilities to WTU PGC
          LP at the same book value.

                    (iii)   AEP seeks approval for OPCo to transfer or
          contribute a total of 100% of its ownership interests in its
          transmission and distribution assets (estimated net book value at
          December 31, 2000, $2,231.5 million) and related liabilities
          (estimated book value at December 31, 2000, $536.6 million) to OPCo
          EDC at their book value at the transfer date.

                    (iv)    AEP seeks approval for CSP to transfer or contribute
          a total of 100% of its ownership interests in its transmission and
          distribution assets (estimated net book value at December 31, 2000,
          $1,440.4 million) and related liabilities (estimated book value at
          December 31, 2000, $424.8 million) to CSP EDC at their book value at
          the transfer date.

                    (v)     AEP seeks approval for SWEPCO to transfer or
          contribute a total of 100% of its ownership interests in its Texas
          transmission and distribution assets (estimated net book value as of
          December 31, 2000, $631.6 million) and related liabilities (estimated
          book value at December 31, 2000, $174.0 million) to SWEPCO EDC at
          their book value at the transfer date.

                    (vi)    After the transfers are executed, AEP seeks approval
          for:

               o    CPL EDC to dividend CPL PGC's common stock or limited
                    liability interest to CSW, which will dividend the stock to
                    AEP, which will

                                       13



                    contribute the stock to Enterprises, which will contribute
                    the stock or limited liability interest to Wholesale Holdco,
                    which will contribute the stock or limited liability
                    interest to Domestic Holdco.

               o    WTU EDC to dividend WTU PGC's common stock or limited
                    liability interest to CSW, which will dividend the stock to
                    AEP, which will contribute the stock or limited liability
                    interest to Enterprises, which will contribute the stock or
                    limited liability interest to Wholesale Holdco, which will
                    contribute the stock to Domestic Holdco.

               o    OPCo PGC to dividend OPCo EDC's common stock or limited
                    liability interest to AEP, which will contribute the stock
                    or limited liability interest to Reg Holdco.

               o    CSP PGC to dividend CSP EDC's common stock or limited
                    liability interest to AEP, which will contribute the stock
                    or limited liability interest to Reg Holdco.

               o    SWEPCO to dividend the common stock or limited liability
                    interest of SWEPCO EDC to CSW.

                    (vii)   Upon completion of the Transaction, Reg Holdco will
          hold CPL EDC, WTU EDC, SWEPCO, SWEPCO EDC, OPCo EDC and CSP EDC, each
          of which will own transmission and distribution assets and related
          liabilities (other than SWEPCO which will continue to be a vertically
          integrated utility with respect to its assets located outside of
          Texas.) Domestic Holdco will hold, among other things, CPL PGC, WTU
          PGC, OPCo PGC and CSP PGC, each of which will own, directly or
          indirectly, generation assets and related liabilities and, upon all
          necessary state and federal regulatory approval, will be EWGs.

                    (viii)  Subject to any required state approval, AEP seeks
          authorization to contribute the stock of the Vertically-Integrated
          Companies to Reg Holdco and for Reg Holdco to acquire the stock of the
          Vertically-Integrated Companies.

                                       14



          AEP proposes to restructure its non-utility holdings (including
utility holdings that are no longer subject to state regulation) from time to
time as may be necessary or appropriate in the furtherance of its authorized
non-utility activities. The restructuring could involve the acquisition of one
or more new special-purpose subsidiaries to acquire and hold direct or indirect
interests in any or all of AEP's existing or future authorized non-utility
businesses. The restructuring could also involve the creation, capitalization
and acquisition of a subsidiary to hold the non-utility interests, the transfer
of existing subsidiaries, or portions of existing businesses, among AEP
associates and/or the reincorporation of existing subsidiaries in a different
state. This authority would enable AEP to consolidate similar businesses and to
participate effectively in authorized non-utility activities, without the need
to apply for or receive additional Commission approval.(8)

          2.   AGREEMENTS

               (a)  Authorization is requested for AEPSC to render
     services to any direct or indirect subsidiary of any Applicant to be formed
     as permitted in this file, pursuant to the existing AEP Service Agreement.
     All services will be performed in adherence with the 'at cost' provisions
     of Rules 90 and 91 under the 1935 Act.

               (b)  AEP may establish a specialized service company for
     dispatch, wholesale trading, and fuel procurement of the generation assets
     not subject to state regulation and/or other energy-related services
     ("GenServCo"). The GenServCo will pay the salaries of its employees and be
     responsible for the administration of all employee benefit plans. Affiliate
     companies will reimburse GenServCo for its expenses on a full cost basis in
     accordance with the requirements imposed by Section 13 of the 1935 Act and
     the Rules promulgated thereunder. AEP will provide information regarding
     such a service company by pre- or post-effective amendment hereto which
     will include a services agreement.

               (c)  In order to comply with S.B. 7, a division of AEPSC may be
     established to meet Texas code of conduct concerns which in general
     prohibit PGCs and EDCs in that state from sharing the services of a single
     service

----------

(8)  Similar authority was granted to Columbia and other registered holding
companies. SEE Columbia Energy Group, HCAR No. 27099 (Nov. 5, 1999).

                                       15



     provider with respect to engineering, purchasing of electric transmission,
     transmission and distribution system operations and marketing services. If
     created, this division would perform some but not all of the services
     contemplated in the existing AEP Service Agreement and would function
     pursuant to a service agreement substantially the same as the existing AEP
     Service Agreement and pursuant to the allocation methods approved for
     AEPSC.

               (d)  Authorization is requested for the time period following
     receipt of respective state regulatory approval of relevant portions of the
     Transaction but prior to the Transaction for the Operating Companies to
     enter into Operating Agreements with the respective Subsidiaries for the
     purpose of allowing the Operating Companies to operate the respective
     utility and related assets of the Subsidiaries. These agreements may be
     necessary to transfer control of such assets before assets can be
     transferred because of mortgage or financial restrictions or delays in
     obtaining assignments of environmental permits or other regulatory
     approvals.

          3.   SERVICES, GOODS AND ASSETS INVOLVING THE UTILITY OPERATING
COMPANIES

          The Utility Subsidiaries and Vertically-Integrated Companies may
provide to one another and other associate companies services incidental to
their utility businesses, including but not limited to, infrastructure services,
maintenance, storm outage emergency repairs, and services of personnel with
specialized expertise related to the operation of the utility. These services
will be provided in accordance with Rules 87, 90, and 91. Moreover, in
accordance with Rules 87, 90, and 91, certain goods may be provided through a
leasing arrangement or otherwise by one Utility Subsidiary to one or more
associate companies, and certain assets may be used by one Utility Subsidiary
for the benefit of one or more other associate companies. Because these services
will be provided and goods transferred in accordance with applicable rules, no
relief is sought from the Commission regarding these services.

          Although CPL PGC, CPL PGC LP, WTU PGC, WTU PGC LP, CSP PGC and OPCo
PGC each will be a "public-utility company" until AEP obtains EWG status for
such companies, none is subject to State rate regulation or will have "captive"
customers.

                                       16



          E.   FINANCING PLAN

               1.   OVERVIEW OF THE FINANCING REQUEST

          The Applicants hereby request authorization to engage in the financing
transactions set forth herein through June 30, 2005 (the "Authorization
Period"). The approval by the Commission of this Application will give the
Applicants the flexibility that will allow them to respond quickly and
efficiently to their financing needs and to changes in market conditions,
allowing them to efficiently and effectively carry on competitive business
activities designed to provide benefits to customers and shareholders.

          The financing authorizations requested herein relate to:

               (a)  issuances by AEP of guarantees of obligations of affiliated
     or unaffiliated persons in favor of other unaffiliated persons and the
     acquisition of the securities of the Holding Companies;

               (b)  issuances of securities and guarantees, the entering into of
     transactions to manage interest rate risk ("hedging transactions")(9) and
     the acquisition of the securities of the Unregulated Subsidiaries by the
     Unregulated Holding Companies;

               (c)  issuances of securities and guarantees and the entering into
     of hedging transactions by the Unregulated Subsidiaries to the extent not
     exempt pursuant to Rule 52 (although each Unregulated Subsidiary will be an
     "electric utility company" under the 1935 Act, none will be subject to the
     jurisdiction of any State commission in connection with the issuance of
     securities - therefore, all securities issuances for the Unregulated
     Subsidiaries will require approval of the Commission until EWG status is
     obtained);

----------

(9)  "Hedging Transactions" include only those transactions related to financing
activities. Engaging in futures and other commodity related risk management by
AEP and its subsidiaries constitute part of their normal business activities and
as such do not require Commission approval. SEE Southern Energy, Inc., HCAR No.
27020 (May 13, 1999); Entergy Corp., HCAR No. 26812 (Jan. 6, 1998); New
Century Energies, HCAR No. 26748 (Aug. 1, 1997); National Fuel Gas Co., HCAR No.
26667 (Feb. 12, 1997).

                                       17



               (d)  issuances of securities and guarantees, the entering into of
     hedging transactions and the acquisition of the securities of the Regulated
     Subsidiaries by Reg Holdco to the extent not exempt pursuant to Rules 52
     and 45;

               (e)  issuances of securities and guarantees and the participation
     in the AEP Money Pool and the entering into of hedging transactions by the
     Regulated Subsidiaries to the extent not exempt pursuant to Rule 52;

               (f)  the ability of AEP and its subsidiaries to pay dividends out
     of capital or unearned surplus;

               (g)  the formation of financing entities and the issuance by such
     entities of securities otherwise authorized to be issued and sold pursuant
     to this Application or pursuant to applicable exemptions under the 1935
     Act, including intra-system guarantees of such securities; and

               (h)  To the extent the conversion of the PGC affiliates from
     "public-utility companies" to EWGs counts as "aggregate investment" in EWGs
     for purposes of Rule 53, obtaining authorization to 'invest' (pursuant to
     the transactions described herein, including the financings and guarantees)
     in the PGC affiliate EWGs up to the aggregate estimated net book value of
     the Restructured Generation Assets (approximately $9,425 million as of
     December 31, 2000).

          2.   PARAMETERS FOR FINANCING AND HEDGING TRANSACTION AUTHORIZATION

          Authorization is requested herein to engage in certain financing
transactions during the Authorization Period for which the specific terms and
conditions are not at this time known, and which may not be covered by Rule 52,
without further prior approval by the Commission. The following general terms
will be applicable where appropriate to the financing transactions requested to
be authorized hereby:

          (a)  Effective Cost of Money

               The effective cost of money on long-term debt borrowings
     occurring pursuant to the authorizations granted under this Application
     will not exceed the greater of (i)


                                       18



     500 basis points over the comparable term U.S. Treasury securities or (ii)
     a gross spread over U.S. Treasuries that is consistent with similar
     securities of comparable credit quality and maturities issued by other
     companies.(10) The effective cost of money on short-term debt borrowings
     pursuant to authorizations granted under this Application will not exceed
     the greater of (i) 350 basis points over the comparable term London
     Interbank Offered Rate ("LIBOR") or (ii) a gross spread over LIBOR that is
     consistent with similar securities of comparable credit quality and
     maturities issued by other companies. The dividend rate on any series of
     preferred securities will not exceed the greater of (a) 700 basis points
     over the yield to maturity of a U.S. Treasury security having a remaining
     term equal to the term of such series of preferred securities or (b) a rate
     that is consistent with similar securities of comparable credit quality and
     maturities issued by other companies.

               (b)  Maturity of Debt and Final Redemption on Preferred
          Securities

               The maturity of indebtedness will not exceed 50 years. All
     preferred securities will be redeemed no later than 50 years after the
     issuance thereof.

               (c)  Issuance Expenses

               The underwriting fees, commissions or other similar remuneration
     paid in connection with the non-competitive issue, sale or distribution of
     a security pursuant to this Application (not including any original issue
     discount) will not exceed 5% of the principal or total amount of the
     security being issued.

               (d)  Use of Proceeds

               The proceeds from the sale of securities in external financing
     transactions will be used for general corporate purposes including:

          o    the financing, in part, of the capital expenditures of the AEP
               System;

----------

(10) SEE The Southern Company, HCAR No. 27134 (Feb. 9, 2000).

                                       19



          o    the financing of working capital requirements of the AEP System;

          o    the acquisition, retirement or redemption pursuant to Rule 42 of
               securities previously issued by AEP subsidiaries without the need
               for prior Commission approval; and

          o    other lawful purposes, and, for the Unregulated Holding
               Companies, the direct or indirect investment in companies
               authorized by prior Order of this Commission, Rule 58 companies,
               other subsidiaries approved by the Commission, EWGs, FUCOs and
               ETCs.(11) The Applicants represent that no such financing
               proceeds will be used to acquire or form a new subsidiary unless
               such financing is consummated in accordance with an order of the
               Commission or an available exemption under the 1935 Act.

               Direct or indirect investments by AEP in Rule 58 Subsidiaries
     would be subject to the limitations of Rule 58.

               (e)  Financial Condition

               The Operating Companies are financially sound and each have
     investment grade ratings from major national rating agencies as indicated
     in Item 1.B. The business of the Unregulated Unit will be conducted by
     companies that will also be financially sound.(12) Furthermore, AEP has an
     investment grade rating (a senior unsecured debt rating of BBB+ from
     Standard & Poor's and Baa1 from Moody's). The consolidated common equity of
     AEP was 33.5% of total Consolidated Capitalization (common equity,
     preferred stock

----------

(11) AEP will make additional investments in EWGs and FUCOs during the
Authorization Period. Accordingly, Rules 53 and 54 apply to this Application.
Compliance with these rules is addressed below.

(12) As a newly formed group, companies in the Unregulated Unit may not have a
rating from nationally recognized rating agencies immediately when it commences
operations. As noted herein, the absence of an investment grade rating will
likely increase the necessity for the Unregulated Unit to receive financial
support from AEP.

                                       20



     and long-term and short-term debt, including current maturities of
     long-term debt) as of June 30, 2001.(13)

               AEP commits that (a) its common equity (as reflected on the
     balance sheets contained in its most recent 10-K or 10-Q filed with the
     Commission pursuant to the 1934 Act) will be at least 30% of its
     Consolidated Capitalization and (b) it will maintain at least an investment
     grade corporate or senior unsecured debt rating by at least one nationally
     recognized rating agency. Further, the Utility Subsidiaries commit that
     each will maintain common equity of at least 30% of its capitalization
     (calculated in the same manner provided, however, that CPL may exclude
     securitization debt from the calculation of indebtedness and total
     capitalization)(14) and at least an investment grade rating by one
     nationally recognized rating agency. The consequences of failing to
     maintain an investment grade rating or common equity of at least 30% of
     Consolidated Capitalization when required is that such company would
     require additional Commission approval to issue securities except for
     securities which would result in an increase in such common equity
     percentage or restoration of such rating.

----------

(13) See footnote 14 below for the reasons it is appropriate to consider the
special status of securitization debt for purposes of consideration of the
financial condition of AEP and its Utility Subsidiaries.

(14) The Commission has recognized that it is appropriate to consider
securitization debt in the calculation of capitalization to determine compliance
with its traditional test of a minimum equity component of capitalization of
30%. SEE West Penn Power Co., HCAR No. 27091 (Oct. 19, 1999) (exemption from 30%
equity standard granted where utility's equity ratio was 15% because of
transition bonds and other factors; excluding transition bonds, utility would
satisfy 30% test). This approach is consistent with the rating agencies analysis
of the impact of securitization on a utility's capital structure. AEP
anticipates that the outstanding securitization bonds of any subsidiary will be
rated "AAA." The structure of these financings, the orders of the respective
State commissions and the statutory provisions of each State ensure that there
will be sufficient cash flow from a dedicated portion of payments made by
utility customers to at all times provide for principal and interest on the
securitization bonds. The rates paid by customers are subject to adjustment in
accordance with procedures of the respective states to ensure that amounts
collected are sufficient to meet debt service and other requirements under the
securitization financings. SEE Utility Stranded Costs: Rating the Securitization
of Transition Tariffs, Special Report, FitchIBCA (September 24, 1998) (available
at www.FitchIBCA.com).

                                       21



               (f)  Hedging Transactions

               Interest rate hedging transactions with respect to existing
     indebtedness ("Interest Rate Hedges"), subject to certain limitations and
     restrictions, would be entered into in order to reduce or manage interest
     rate cost or risk. Interest Rate Hedges would only be entered into with
     counterparties ("Approved Counterparties") whose senior debt ratings, or
     whose parent companies' senior debt ratings, as published by Standard and
     Poor's Ratings Group, are equal to or greater than BBB, or an equivalent
     rating from Moody's Investors' Service or Fitch Investor Service. Interest
     Rate Hedges will involve the use of financial instruments and derivatives
     commonly used in today's capital markets, such as interest rate swaps,
     options, caps, collars, floors, and structured notes (i.e., a debt
     instrument in which the principal and/or interest payments are indirectly
     linked to the value of an underlying asset or index), or transactions
     involving the purchase or sale, including short sales, of U.S. Treasury
     obligations. The transactions would be for fixed periods and stated
     notional amounts. In no case will the notional principal amount of any
     interest rate swap exceed that of the underlying debt instrument and
     related interest rate exposure. Applicants will not engage in speculative
     transactions. Fees, commissions and other amounts payable to the
     counterparty or exchange (excluding, however, the swap or option payments)
     in connection with an Interest Rate Hedge will not exceed those generally
     obtainable in competitive markets for parties of comparable credit quality.

               In addition, interest rate hedging transactions with respect to
     anticipated debt offerings (the "Anticipatory Hedges"), subject to certain
     limitations and restrictions would only be entered into with Approved
     Counterparties, and would be utilized to fix and/or limit the interest rate
     risk associated with any new issuance through (i) a forward sale of
     exchange-traded U.S. Treasury futures contracts, U.S. Treasury obligations
     and/or a forward swap (each a "Forward Sale"); (ii) the purchase of put
     options on U.S. Treasury obligations (a "Put Options Purchase"); (iii) a
     Put Options Purchase in combination with the sale of call options on U.S.
     Treasury obligations (a "Zero Cost Collar"); (iv) transactions involving
     the purchase or sale, including short sales, of U.S. Treasury obligations;
     or (v) some combination of a Forward Sale, Put

                                       22



     Options Purchase, Zero Cost Collar and/or other derivative or cash
     transactions, including, but not limited to structured notes, options, caps
     and collars, appropriate for the Anticipatory Hedges. Anticipatory Hedges
     may be executed on-exchange ("On-Exchange Trades") with brokers through the
     opening of futures and/or options positions traded on the Chicago Board of
     Trade or the Chicago Mercantile Exchange, the opening of over-the-counter
     positions with one or more counterparties ("Off-Exchange Trades"), or a
     combination of On-Exchange Trades and Off-Exchange Trades. Each Applicant
     will determine the optimal structure of each Anticipatory Hedge transaction
     at the time of execution. Applicants may decide to lock in interest rates
     and/or limit its exposure to interest rate increases. Applicants represent
     that each Interest Rate Hedge and Anticipatory Hedge will be treated for
     accounting purposes under generally accepted accounting principles.
     Applicants will comply with the then existing financial disclosure
     requirements of the Financial Accounting Standards Board associated with
     hedging transactions.(15)

          3.   AEP GUARANTEES, INTRA-SYSTEM ADVANCES AND EWG INVESTMENT

               (a)  Guarantees

               AEP requests authorization to enter into guarantees, obtain
     letters of credit, enter into support or expense agreements or otherwise
     provide credit support with respect to the obligations of the Finance
     Applicants as may be appropriate or necessary to enable such Finance
     Applicant to carry on in the ordinary course of its respective business in
     an aggregate principal amount, and to enter into guarantees of
     non-affiliated third parties obligations in the ordinary course of AEP's
     business ("AEP Guarantees") in an amount not to exceed $15.0 billion
     outstanding at any one time (not taking into account obligations exempt
     pursuant to Rule 45). Any such guarantees shall also be subject to the
     limitations of Rule 58(a)(1) or the Rule 53 limitation then in effect for
     AEP, as applicable. Each guarantor proposes to charge each

----------

(15) The proposed terms and conditions of the Interest Rate Hedges and
Anticipatory Hedges are substantially the same as the Commission has approved in
other cases. SEE Entergy Corporation, HCAR No. 27371 (April 3, 2001); New
Century Energies, Inc., et al., HCAR No. 27000 (April 7, 1999); and Ameren
Corp., et al., HCAR No. 27053 (July 23, 1999).

                                       23


     subsidiary a fee for each guarantee provided on its behalf that is
     comparable to those obtainable by the beneficiary of the guarantee from
     third parties.

               A substantial amount of the guarantees proposed to be issued by
     AEP will be in connection with the Unregulated Unit. As a result of the
     Transaction, the Unregulated Unit will be a newly formed business
     consisting of the generating assets of CPL, WTU, CSP and OPCo. The
     Unregulated Unit will also conduct the power marketing and trading
     operations previously conducted by CPL, WTU, CSP and OPCo. For various
     business reasons, AEP may wish to provide credit support in connection with
     the Unregulated Unit's obligations to independent power producers to
     purchase the output of generating units, in connection with the trading
     positions of the Unregulated Unit entered into in the ordinary course of
     the Unregulated Unit's energy marketing and trading business and for other
     purposes. AEP may wish to provide guarantees to the Unregulated Unit for
     reasons that are not unusual in today's increasingly competitive
     electricity markets.

               The second reason for the requested level of guarantee authority
     is that many of the counterparties with whom the Unregulated Unit will buy
     and sell power may demand that the Unregulated Unit provide credit support,
     as its credit rating may not be as strong as the present credit ratings of
     CPL, CSP, OPCo and WTU.

               The provision of parent guarantees by holding companies to
     affiliates in the generation and power marketing business is a standard
     industry practice. Given the substantial volume of the Unregulated Unit's
     business, AEP's $15.0 billion request for authority to issue guarantees,
     including the guarantees relating to the Unregulated Unit, is reasonable
     and appropriate under current industry practice. AEP expects the
     Unregulated Unit to grow quickly and obtain its own investment grade rating
     soon after the Restructuring. To the extent the Unregulated Unit has such a
     rating, the need for support from AEP will likely be reduced. However, in
     that situation, the Unregulated Unit will likely be required to offer its
     guarantee in connection with the business activities of its subsidiaries
     through which AEP's generation business will be developed.

                                       24



               Certain of the guarantees referred to above may be in support of
     the obligations of subsidiaries which are not capable of exact
     quantification. In such cases, AEP will determine the exposure under such
     guarantee for purposes of measuring compliance with the $15.0 billion
     limitation by appropriate means including estimation of exposure based on
     loss experience or projected potential payment amounts. If appropriate,
     such estimates will be made in accordance with generally accepted
     accounting principles. Such estimation will be reevaluated periodically.

               AEP requests that this guarantee authority include the ability to
     guarantee debt. The debt guaranteed will comply with the parameters set
     forth in this Section E. Any guarantees or other credit support
     arrangements outstanding at the end of the Authorization Period will
     continue until expiration or termination in accordance with their terms.

               The aggregate amount of the guarantees issued by AEP for the
     purpose of funding any direct or indirect investment in an EWG or FUCO
     would not, when added to AEP's "aggregate investment" (as defined in Rule
     53(a)(1)) in all such companies, exceed the Rule 53 limitation then in
     effect for AEP.

               Direct or indirect investments by AEP in Rule 58 Subsidiaries
     would be subject to the limitations of Rule 58.

               (b)  Intra-system Advances

               Authority is sought for AEP to acquire the debt or other
     securities of the Holding Companies for the purpose of lending to them. All
     such intra-company conduit financing transactions shall comply with the "at
     cost" requirements of Rules 45 and 52.

               (c)  EWG Investment

               As noted above, AEP is seeking EWG status for the PGC affiliates
     that will own the Restructured Generation Assets. Immediately following the
     Transaction, the PGC affiliates will be "public-utility companies" under
     the 1935 Act. Once EWG status is obtained, each PGC affiliate will be an
     EWG and the Restructured Generation Assets owned

                                       25



     by each will be "eligible facilities" under the 1935 Act. To the extent the
     conversion of the PGC affiliates from "public-utility companies" to EWGs
     counts as "aggregate investment" in EWGs for purposes of Rule 53, AEP seeks
     authorization to 'invest' (pursuant to the transactions described herein,
     including the financings and guarantees) in the PGC affiliate EWGs up to
     the aggregate estimated net book value of the Restructured Generation
     Assets (approximately $9,425 million as of December 31, 2000).

               No new financing is associated with the obtaining of EWG status
     for the PGC affiliates. AEP respectfully submits that the obtaining of EWG
     status by the PGC affiliates, when it occurs, is a purely legal distinction
     under the 1935 Act and is without economic effect on the capitalization or
     retained earnings of the AEP system or its financial condition. In point of
     fact, AEP respectfully suggests that the application of Rule 53 to an
     internal reorganization/restructuring transaction in which generation
     assets are simply being moved from one subsidiary to another was not the
     kind of transaction at which Rule 53 was targeted.

               To the extent, however, that staff deems the conversion of the
     PGC affiliates from "public-utility companies" to EWGs counts as "aggregate
     investment" in EWGs for purposes of Rule 53, AEP will require the authority
     to 'invest' (pursuant to the transactions described herein, including the
     financings and guarantees) in the PGC affiliate EWGs up to the aggregate
     estimated net book value of the Restructured Generation Assets. The
     authority requested herein is essential if AEP is to successfully adapt to
     the state-law mandated restructuring described in this file and which
     materially impacts significant portions of its regulated utility
     operations. AEP must obtain sufficient investment flexibility under the
     1935 Act to obtain EWG status for the PGCs owning the Restructured
     Generation Assets. For the foregoing reasons, AEP hereby requests the
     authorization to 'invest' in EWGs as described above.

          4.   UNREGULATED HOLDING COMPANIES AUTHORITY

               (a)  Financing Authority

               Authority is sought for each Unregulated Holding Company to
     engage in financings and to issue securities to

                                       26



     non-affiliated and affiliated entities subject to and in accordance with
     the parameters set forth in Item E.2, above, in an aggregate principal
     amount not to exceed $5.0 billion, other than the refunding of outstanding
     securities, which would not be limited.

               (b)  Guarantee Authority

               Authority is sought for each Unregulated Holding Company to issue
     guarantees and extend credit support to any Unregulated Subsidiary, Finance
     Subsidiary, as defined below, owned by it or any other Unregulated Holding
     Company subject to and in accordance with the parameters set forth in Item
     E.3.(a), above, in an aggregate amount not to exceed $10.0 billion,
     exclusive of any guarantees and other forms of credit support that are
     exempt pursuant to Rule 45 and Rule 52, provided however, that the amount
     of guarantees in respect of obligations of any Rule 58 Subsidiaries shall
     remain subject to the limitations of Rule 58(a)(1).

               (c)  Hedging Transaction Authority

               Authority is sought for each Unregulated Holding Company to enter
     into any hedging transaction subject to and in accordance with the
     parameters set forth in Item E.2, above.

               (d)  Intra-system Advances

               Authority is sought for each Unregulated Holding Company to
     acquire the debt or other securities of any Unregulated Subsidiary or other
     Unregulated Holding Company for the purpose of lending to such Unregulated
     Subsidiary or other Unregulated Holding Company. All such intra-company
     conduit financing transactions shall comply with the "at cost" requirements
     of Rules 45 and 52.

          5.   UNREGULATED SUBSIDIARIES AUTHORITY

               (a)  Financing Authority

               Authority is sought for each Unregulated Subsidiary, to the
     extent not exempt under Rule 52, to engage in financings(16) and to issue
     securities to non-

----------

(16) CPL PGC is expected to assume the obligations on certain pollution control
loan obligations of CPL issued in connection with facilities located at the

                                       27



     affiliated and affiliated entities subject to and in accordance with the
     parameters set forth in Item E.2, above, up to the following principal
     amounts, other than the refunding of outstanding securities, which would
     not be limited:

          CPL PGC, CPL PGC LP, CPL PGC LLC............  1,000,000,000
          CSP PGC.....................................    500,000,000
          OPCo PGC....................................  1,000,000,000
          WTU PGC, WTU PGC LP, WTU PGC LLC............    250,000,000

               (b) Guarantee Authority

               Authority is sought for each Unregulated Subsidiary to issue
     guarantees and extend credit support to any subsidiary owned by it
     (including any Finance Subsidiary, as defined below) or to any other
     Unregulated Subsidiary subject to and in accordance with the parameters set
     forth in Item E.3.(a), above, in amounts not to exceed the amounts set
     forth in Item E.5.(a), above, exclusive of any guarantees and other forms
     of credit support that are exempt pursuant to Rule 45 and Rule 52, provided
     however, that the amount of guarantees in respect of obligations of any
     Rule 58 Subsidiaries shall remain subject to the limitations of Rule
     58(a)(1).

               (c)  Hedging Transaction Authority

               Authority is sought for each Unregulated Subsidiary to enter into
     any hedging transaction subject to and in accordance with the parameters
     set forth in Item E.2, above.

          6.   REG HOLDCO AUTHORITY

               (a)  Financing Authority

               Authority is sought for Reg Holdco to engage in financings and to
     issue securities to non-affiliated and affiliated entities subject to and
     in accordance with the parameters set forth in Item E.2, above, in an
     aggregate principal amount not to exceed $10.0 billion, other than

----------

generating stations to be transferred to CPL PGC from CPL. WTU PGC is expected
to assume the obligations on certain pollution control loan obligations of WTU
issued in connection with facilities located at the generating stations to be
transferred to WTU PGC from WTU.


                                       28



     the refunding of outstanding securities, which would not be limited.

               (b)  Guarantee Authority

               Authority is sought for Reg Holdco to issue guarantees and extend
     credit support to any Regulated Subsidiary and any Finance Subsidiary, as
     defined below owned by it subject to and in accordance with the parameters
     set forth in Item E.3.(a), above, in an aggregate amount not to exceed
     $10.0 billion.

               (c)  Hedging Transaction Authority

               Authority is sought for Reg Holdco to enter into any hedging
     transaction subject to and in accordance with the parameters set forth in
     Item E.2, above.

               (d)  Intra-system Advances

               Authority is sought for Reg Holdco to acquire the debt or other
     securities of any affiliated public utility company (other than the
     Unregulated Subsidiaries) for the purpose of lending to such affiliate. All
     such intra-company conduit financing transactions shall comply with the "at
     cost" requirements of Rules 45 and 52.

          7.   REGULATED SUBSIDIARIES AUTHORITY

               (a)  Financing Authority

               Authority is sought for each Regulated Subsidiary, to the extent
     not exempt under Rule 52, to engage in financings and to issue securities
     to non-affiliated and affiliated entities subject to and in accordance with
     the parameters set forth in Item E.2, above, up to the following principal
     amounts, other than the refunding of outstanding securities, which would
     not be limited:

          CPL EDC.....................................  1,000,000,000
          CSP EDC.....................................  1,000,000,000
          OPCo EDC....................................  1,250,000,000
          SWEPCO EDC..................................    500,000,000
          WTU EDC.....................................    500,000,000

                                       29



               (b)  Guarantee Authority

               Authority is sought for each Regulated Subsidiary to issue
     guarantees and extend credit support to any subsidiary owned by it
     (including any Finance Subsidiary, as defined below) subject to and in
     accordance with the parameters set forth in Item E.3.(a), above, in amounts
     not to exceed the amounts set forth in Item E.7.(a), above.

               (c)  Money Pool Authority

               AEP currently administers the AEP Money Pool as authorized by
     AMERICAN ELECTRIC POWER COMPANY, INC. ET AL., HCAR No. 27186 (June 14,
     2000) subject to the general authority set forth therein and CENTRAL AND
     SOUTH WEST CORP., HCAR No. 26697 (March 28, 1997) and CENTRAL AND SOUTH
     WEST CORP., HCAR No. 26854 (April 3, 1998) and any subsequent orders which
     may be issued relating to the AEP Money Pool (collectively, the "Money Pool
     Orders"). Authority is sought for each Regulated Subsidiary to participate
     in the AEP Money Pool subject to and as set forth in the Money Pool Orders
     and to be permitted to issue, to the extent not exempt under Rule 52,
     short-term debt up to the amounts set forth below (which amounts shall be
     included in the limits set forth in Item E.7.(a), above):

          CPL EDC.....................................  200,000,000
          CSP EDC.....................................  175,000,000
          OPCo EDC....................................  250,000,000
          SWEPCO EDC..................................  100,000,000
          WTU EDC.....................................   75,000,000

               (d)  Hedging Transaction Authority

               Authority is sought for each Regulated Subsidiary to enter into
any hedging transaction subject to and in accordance with the parameters set
forth in Item E.2, above.

          8.   FINANCE SUBSIDIARY AUTHORITY

          Authority is sought for any Finance Applicant to organize and acquire
all of the common stock or other equity interests of one or more subsidiaries
(collectively, the "Financing Subsidiary") for the purpose of effecting any
financing as described herein. Authority is further sought for

                                       30



any Financing Subsidiary to effect any such transaction for which any Finance
Applicant has received authority herein to effect per this Section E.

     F.   AEP'S NON-UTILITY HOLDINGS

     Applicants propose to restructure AEP's non-utility holdings from time to
time as may be necessary or appropriate in the furtherance of its authorized
non-utility activities. The restructuring could involve the acquisition of one
or more new special-purpose subsidiaries to acquire and hold direct or indirect
interests in any or all of the AEP system's existing or future authorized
non-utility businesses. The restructuring could also involve the transfer of
existing subsidiaries, or portions of existing businesses, among AEP associates
and/or the reincorporation of existing subsidiaries in a different state. This
would enable the AEP system to consolidate similar businesses and to participate
effectively in authorized non-utility activities, without the need to apply for
or receive additional Commission approval.(17)

     These direct or indirect subsidiaries might be corporations, partnerships,
limited liability companies or other entities in which AEP, directly or
indirectly, might have a 100% interest, a majority equity or debt position, or a
minority debt or equity position. These subsidiaries would engage only in
businesses to the extent the AEP system is authorized, whether by statute, rule,
regulation or order, to engage in those businesses. AEP does not seek
authorization to acquire an interest in any non-associate Company as part of the
authority requested in this Application and states that the reorganization will
not result in the entry by the AEP system into a new, unauthorized line of
business.

     G.   REQUEST FOR AUTHORITY TO PAY DIVIDENDS OUT OF CAPITAL OR UNEARNED
SURPLUS BY THE UTILITY SUBSIDIARIES

     Section 12 of the 1935 Act, and Rule 46 thereunder, generally prohibit the
payment of dividends out of "capital or unearned surplus" except pursuant to an
order of the Commission. The legislative history explains that this provision
was intended to "prevent the milking of operating companies in the interest of
the controlling holding company groups." S. Rep. No.

----------

(17) PowerGen plc, HCAR No. 27291 (Dec. 6, 2000); Columbia Energy Group, HCAR
No. 27099 (Nov. 5, 1999).

                                       31



621, 74th Cong., 1st Sess. 34 (1935).(18) In determining whether to permit a
registered holding company to pay dividends out of capital surplus, as discussed
in the 1991 case involving Eastern Utilities Associates, the Commission
considers various factors, including: (i) the asset value of the company in
relation to its capitalization; (ii) the company's prior earnings; (iii) the
company's current earnings in relation to the proposed dividend; and (iv) the
company's projected cash position after payment of a dividend. In recent cases,
the Commission has determined that holding company systems may continue to pay
dividends although retained earnings have been reduced or eliminated because of
write-offs associated with State utility regulation restructuring legislation or
because of application of generally accepted accounting principles to a merger
involving two previously unaffiliated companies.

     For extraordinary reasons related to the adoption of utility restructuring
legislation in Texas and Ohio, CPL, CSP, OPCo, SWEPCO and WTU will each have on
a pro forma basis, unusual reductions in their respective retained earnings
which may make it difficult in some cases to continue to pay dividends at
historical levels without such dividends being paid from paid-in-capital.
Generally accepted accounting principles may result in an elimination of
retained earnings at CPL, CSP, OPCo, SWEPCO and WTU. Further, such elimination
may have the effect of limiting the amount available for dividends. Accordingly,
authority is requested for AEP and the Holding Companies to pay dividends out of
capital or unearned surplus.

     H.   OTHER REGULATORY APPROVALS

     The goals of the proposed restructuring are to comply with the requirements
of Texas and Ohio while maintaining the benefits of integrated operations for
system consumers and, in particular, continuing to provide customers with a
reliable power supply. To that end, all of AEP's energy regulators will be
involved in some aspect of the restructuring.

     The proposed transactions will require approvals from the Federal Energy
Regulatory Commission ("FERC") under Sections 203 and 205 of the Federal Power
Act in connection with the transfer of assets and the restructuring of
FERC-approved Operating and Interconnection agreements (to remove companies in
deregulated states). Applications were filed with the FERC on July 24, 2001 and
copies are attached hereto as Exhibit D-7.

----------

(18) Compare Section 305(a) of the Federal Power Act.

                                       32



     In addition, AEP is seeking orders from each of its state regulators,
pursuant to Section 32(c) of the 1935 Act, to establish EWG status for all Ohio
and Texas generation. EWG status is needed to enable AEP to divest certain
generation by July, 2002, in fulfillment of its merger commitments. AEP will
seek FERC certification once the state orders have been received.

ITEM 2.  FEES, COMMISSIONS AND EXPENSES

     Estimated fees and expenses expected to be incurred by Applicants in
connection with the Transaction will be filed by amendment.

ITEM 3.  APPLICABLE STATUTORY PROVISIONS


SECTIONS OF THE 1935 ACT            TRANSACTIONS TO WHICH SECTION OR RULE MAY BE
                                    APPLICABLE:


9, 10 and 11 and rules thereunder   Creation of Enterprises, Wholesale Holdco
                                    and Domestic Holdco

11(b)(2) and rules thereunder       Declaration that Enterprises, Wholesale
                                    Holdco, Domestic Holdco and Reg Holdco are
                                    not subsidiary companies or holding
                                    companies solely with respect to the
                                    "great-grandfather" provisions of Section
                                    11(b)(2)

9, 10 and 12 and rules thereunder   Transfers of utility assets and securities
                                    of public utility subsidiaries

13 and rules thereunder             Approval of services to be provided by AEPSC
                                    to the direct and indirect subsidiaries
                                    formed herein; approval of the performance
                                    of certain services between AEP system
                                    companies

6, 7, 9, 10 and 12 and rules        Transfers of utility assets and securities
thereunder                          of public utility subsidiaries

6 and 7 and rules thereunder        Issuance of securities

12 and rules thereunder             Dividends out of paid-in capital

     The relevant standards for Commission review of this Application under
Sections 6, 7, 9, 10, 11, 12 and 13 of the 1935 Act, and Rules 43(a), 44, 45,
46, 54, 90 and 91 thereunder.

                                       33



     A.   SECTIONS 9 & 10

     Section 9(a)(1) provides that unless the Commission under Section 10 has
approved the acquisition, it shall be unlawful for any registered holding
company or any subsidiary company thereof "to acquire, directly or indirectly,
any securities or utility assets or any other interest in any business." Section
10(f) provides that:

     The Commission shall not approve any acquisition as to which an
     application is made under this section unless it appears to the
     satisfaction of the Commission that such State laws as may apply in
     respect of such acquisition have been complied with, except where the
     Commission finds that compliance with such State laws would be
     detrimental to the carrying out of the provisions of Section 11.

     If the requirements of subsection (f) of this section are satisfied, the
Commission shall approve the acquisition unless the Commission finds that:

          (1)  such acquisition will tend towards interlocking relations or the
     concentration of control of public-utility companies, of a kind or to an
     extent detrimental to the public interest or the interest of investors or
     consumers;

          (2)  in case of the acquisition of securities or utility assets, the
     consideration, including all fees, commissions, and other remuneration, to
     whomsoever paid, to be given, directly or indirectly, in connection with
     such acquisition is not reasonable or does not bear fair relation to the
     sums invested in or the earning capacity of the utility assets to be
     acquired or the utility assets underlying the securities to be acquired; or

          (3)  such acquisition will unduly complicate the capital structure of
     the holding-company system of the applicant or will be detrimental to the
     public interest or the interest of investors or consumers or the proper
     functioning of such holding-company system.

          The Transaction, for the reasons set forth below, satisfy the
     standards of Section 10 of the 1935 Act.

                                       34



          1.   THE TRANSACTION COMPLIES WITH STATE LAW

          The Transaction complies with, or upon completion of the record shall
comply with, applicable state laws on the matter of restructuring and the
transfer of utility assets. Specifically, each Operating Company has structured
the Transaction in response to state law and legislative mandate. The
Transaction puts into effect the state regulatory and legislative determination
that restructuring is in the public interest.

          The Transaction is reasonably incidental, economically necessary and
appropriate to the operations of each Operating Company and the AEP system.
Specifically, the Transaction will (a) allow AEP to continue to serve the needs
of its regulated customers while positioning the AEP system for competition in
the deregulated generation market; (b) segregate the transmission and
distribution assets into rate-regulated subsidiaries; (c) allow each deregulated
Operating Company to manage and operate its respective generating assets with
due regard to market considerations; and, (d) increase the flexibility for
financing activities on cost-effective terms that reflect the costs of capital
for each area of business activity.

          2.   THE CAPITAL STRUCTURE IS NOT UNDULY COMPLICATED

          AEP seeks approval to form one first tier holding company,
Enterprises, to hold the interests in Wholesale Holdco; a second tier holding
company, Wholesale Holdco, to hold the interests in Domestic Holdco and a third
tier holding company, Domestic Holdco, to hold the PGCs. Each holding company is
necessary to achieve a simple corporate structure while minimizing the Federal
and State income tax impact of combining the unregulated businesses of AEP.
Alternative structures were considered but each had serious disadvantages
including potential tax liabilities.

          Alternative structures which would minimize tax liability were much
less desirable from a business organization viewpoint and involved much more
complicated corporate structures. With respect to Reg Holdco, AEP wishes to
emphasize the separation of its "wires" business - the transmission and
distribution functions of the EDCs - from its non-State regulated utilities -
the PGCs - and non-utility - Enterprises - businesses. Providing a corporate
organization that clearly and

                                       35



fully separates the distribution business from other businesses will better
insulate the distribution business, which will continue to be regulated, from
unregulated business. Further, providing a separate management structure for the
distribution business will provide for management focus on that business
enabling better integration and efficient development of that business.

          The Commission has recognized in recent cases that there are
organizational, regulatory and tax benefits to the creation of intermediate
holding companies that should be considered. The harms that the 1935 Act
envisioned would be prevented by the reduction or elimination of intermediate
holding companies are unlikely to occur given modern financial reporting and
affiliate transaction requirements. AEP's proposal will not result in harmful
pyramiding of holding company groups. There is no risk of unfair or inequitable
distribution of voting power from the proposal. No proposed holding company will
issue any voting securities to anyone other than AEP or a directly or indirectly
wholly owned subsidiary of AEP. Consequently, the Commission should approve the
formation of such entities, "look through" the intermediate holding companies or
treat them as a single company for purposes of analysis under Section 11(b)(2)
of the 1935 Act.(19)

          Enterprises and Reg Holdco will be wholly-owned, directly by AEP.
Other than to enhance the full integration of the regulated utilities, Reg
Holdco will not affect the operation of CPL EDC, WTU EDC, SWEPCO, SWEPCO EDC,
CSP EDC or OPCo EDC. Likewise, Enterprises will not affect the operation of CPL
PGC, WTU PGC, CSP PGC and OPCo PGC. Thus, there is no possibility that
implementation and continuance of the proposed transaction structure could
result in an undue or unnecessarily complex capital structure or inequitable
distribution of voting power to the detriment of the public interest or the
interest of consumers. This is not the type of situation that concerned the
drafters of the 1935 Act and AEP urges the Commission to exercise its discretion
to find that any apparent complexity of the proposed transaction structure is
neither undue nor unnecessary.

----------

(19) Exelon Corporation, HCAR No. 27256 (Oct. 19, 2000) (approving intermediate
holding company structure resulting from merger); National Grid Group plc, HCAR
No. 27154 (Mar. 15, 2000) (intermediate holding companies necessary for
cross-border tax considerations); Dominion Resources, HCAR No. 27113 (Dec. 15,
1999) (intermediate holding company "CNG Acquisitions" to hold CNG's utility
subsidiaries under alternative form of merger).

                                       36



          The Transaction does not unduly complicate the capital structure of
the AEP system. The capital structure of the AEP system on a consolidated basis
will be essentially unchanged. The Transaction will tend toward the proper
functioning of the AEP system in a partly deregulated, partly regulated
operating environment. The Transaction results in a more economical and
efficient system. The resulting increased efficiency of operations significantly
offsets any perceived added complexity caused by the Transaction.(20) Being done
in part because of state mandate and for all of the foregoing reasons, the
Transaction satisfies the requirements of, and is entirely consistent with the
1935 Act.

          3.   THE CONSIDERATION IS FAIR AND REASONABLE

          The consideration to be paid in connection with the Transaction is
fair and reasonable. Indeed, each state public utility commission has approved
or will approve the corporate separation plan as it relates to its particular
jurisdiction.

     B.   SECTION 12 & RULE 46

          Section 12(c) governs the proposed dividends for which authorization
     has been sought. Section 12(c) provides that:

     It shall be unlawful for any registered holding company or any
     subsidiary company thereof, by use of the mails or any means or
     instrumentality of interstate commerce, or otherwise, to declare or
     pay any dividend on any security of such company or to acquire,
     retire, or redeem any security of such company, in contravention of
     such rules and regulations or orders as the Commission deems necessary
     or appropriate to protect the financial integrity of companies in
     holding-company systems, to safeguard the working capital of
     public-utility companies, to prevent the payment of dividends out of
     capital or unearned surplus, or to prevent the circumvention of the
     provisions of this chapter or the rules, regulations, or orders
     thereunder.

----------

(20) SEE Wisconsin's Environmental Decade, Inc. v SEC, 882 F.2d 523, 527 (D.C.
Cir. 1989); Northeast Utilities, HCAR No. 25221 (Dec. 21, 1990); Entergy Corp.,
HCAR No. 25136 (Aug. 27, 1990).

                                       37



     AEP expects that the distribution of entities owning utility assets of this
magnitude, in each instance could be a dividend out of "capital or unearned
surplus" within the meaning of Rule 46 under the 1935 Act. Applicants believe
that, in the overall context of the Transaction, neither shareholders,
ratepayers nor the public will be adversely affected.21 The distributions will
be structured as such in order to minimize the tax burden on the Applicants. The
distributions are fundamentally necessary to effect the transfer of their
respective generation or transmission and distribution assets to an affiliate in
the AEP system in accordance with the relevant order of each respective state
utility commission. The distributions will be the final step in the
reorganization of the AEP system, in accordance with, and fulfillment of, the
regulations and legislative policies and objectives that culminated in
deregulation of and competition in electrical generation in each state, as
described herein. The distributions are not intended to harm the interests of
any Operating Company, successor or, ultimately, AEP. The AEP system will
continue to own the assets transferred by such distributions. Subject to any
necessary state approvals, the regulated parts of the AEP system that are not
subject to deregulation and competition will be owned directly by Reg Holdco.
For these reasons, the proposed distributions are entirely consistent with the
policies and principles behind Section 12 of the 1935 Act.

     C.   SECTION 13(B) COMPLIANCE

     Section 13(b) of the 1935 Act provides that:

     It shall be unlawful for any subsidiary company of any registered
     holding company or for any mutual service company, by use of the mails
     or any means or instrumentality of interstate commerce, or otherwise,
     to enter into or take any step in the performance of any service,
     sales, or construction contract by which such company undertakes to
     perform services or construction work for, or sell goods to, any
     associate company thereof except in accordance with such terms and
     conditions and subject to such limitations and prohibitions as the
     Commission by rules and regulations or order shall prescribe as
     necessary or appropriate in the public interest or for the

----------

(21) IBID. The Commission, among other things, authorized the dividending of
interests to Genco.

                                       38



     protection of investors or consumers and to insure that such contracts
     are performed economically and efficiently for the benefit of such
     associate companies at cost, fairly and equitably allocated between
     such companies.

     Any transaction between AEPSC and any newly formed affiliates and any
related service agreements shall be in compliance with section 13(b) of the 1935
Act and Rules 87, 90 and 91 under the 1935 Act.

     D.   RULE 54 COMPLIANCE

     Rule 54 provides that, in determining whether to approve an application
which does not relate to any EWG or FUCO, the Commission shall not consider the
effect of the capitalization or earnings of any such EWG or FUCO which is a
subsidiary of a registered holding company if the requirements of Rule 53(a),
(b) and (c) are satisfied.

     AEP consummated the merger with Central and South West Corporation on June
15, 2000 pursuant to an order issued June 14, 2000 (HCAR No. 27186), which
further authorized AEP to invest up to 100% of its consolidated retained
earnings, with consolidated retained earnings to be calculated on the basis of
the combined consolidated retained earnings of AEP and CSW (as extended pursuant
to HCAR No. 27316, December 26, 2000, the "Rule 53(c) Order").

     AEP currently meets all of the conditions of Rule 53(a) and none of the
conditions set forth in Rule 53(b) exist or will exist as a result of the
transactions proposed herein.

     RULE 53(a)(1) At June 30, 2001, AEP's "aggregate investment", as defined in
Rule 53(a)(1), in EWGs and FUCOs was approximately $1.315 billion, or about
40.6% of AEP's "consolidated retained earnings", also as defined in Rule
53(a)(1), for the four quarters ended June 30, 2001 ($3.242 billion).

     RULE 53(a)(2) Each FUCO in which AEP invests will maintain books and
records and make available the books and records required by Rule 53(a)(2).

     RULE 53(a)(3) No more than 2% of the employees of the electric utility
subsidiaries of AEP will, at any one time, directly or indirectly, render
services to any FUCO.

                                       39



     RULE 53(a)(4) AEP has submitted and will submit a copy of Item 9 and
Exhibits G and H of AEP's Form U5S to each of the public service commissions
having jurisdiction over the retail rates of AEP's electric utility
subsidiaries.

     RULE 53(b) (i) Neither AEP nor any subsidiary of AEP is the subject of any
pending bankruptcy or similar proceeding; (ii) AEP's average consolidated
retained earnings for the four quarters ended June 30, 2001 ($3,242,159,000)
represented a decrease of approximately $302,490,000 (or 8.5%) in the average
consolidated retained earnings from the four quarters ended June 30, 2000
($3,544,649,000); and (iii) for the fiscal year ended December 31, 2000, AEP did
not report operating losses attributable to its direct or indirect investments
in EWGs and FUCOs.

     AEP's interests in EWGs and FUCOs have made a positive contribution to
earnings over the four calendar years ending after the Rule 53(c) Order.
Accordingly, since the date of the Rule 53(c) Order, the capitalization and
earnings attributable to AEP's investments in EWGs and FUCOs has not had an
adverse impact on AEP's financial integrity.

ITEM 4.  REGULATORY APPROVAL

     The FERC must approve the sale of utility assets and other action
contemplated in this Application. The LPSC must approve the business unbundling
plan of SWEPCO.

     On July 7, 2000, the PUCT issued an order approving the corporate
separation plan of CPL, SWEPCO and WTU (Exhibit D-2.) On September 28, 2000, the
PUCO issued an order on each of OPCo and CSP's request to separate its
generation assets from its transmission and generation assets. In that order,
the PUCO approved the Stipulation Agreement requiring the separation of each of
OPCo and CSP's generation assets from its transmission and distribution assets
as determined in accordance with accepted PUCO procedures (Exhibit D-4). On
September 1, 2000, SWEPCO filed an application before the LPSC seeking approval
to transfer its Texas transmission and distribution assets to SWEPCO EDC
(Exhibit D-5).

ITEM 5.  PROCEDURE

     It is requested that the Commission's order granting this Application or
Declaration be issued on or before October 1,

                                       40



2001. There should be no recommended decision by a hearing or other responsible
officer of the Commission and no 30-day waiting period between the issuance of
the Commission's order and its effective date. Applicants consent to the
Division of Corporate Regulation assisting in the preparation of the
Commission's decision and order in this matter, unless the Division opposes the
Transaction covered by this Application or Declaration.

ITEM 6.  EXHIBITS AND FINANCIAL STATEMENTS

     (a)  Exhibits:

          B-1       Form of Proposed AEP Structure (previously filed on Form SE)

          D-1       PUCT Application

          D-2       PUCT Order

          D-3       PUCO Application

          D-4       PUCO Order

          D-5       LPSC Application

          D-6       LPSC Order (to be filed by amendment)

          D-7       FERC Application

          D-8       FERC Order (to be filed by amendment)

          F         Opinion of Counsel (to be filed by amendment)


     (b)  Financial statements:

     Consolidated balance sheets as of June 30, 2001 and consolidated statements
of income for the period ended June 30, 2001 of AEP, CPL, CSP, OPCo, SWEPCO and
WTU. (Incorporated by reference from AEP's Form 10-Q for the period ended June
30, 2001, File No. 1-3525.)

                                       41



ITEM 7.  INFORMATION AS TO ENVIRONMENTAL EFFECTS

     As described in Item 1, the proposed transactions are of a routine and
strictly financial nature in the ordinary course of AEP's business and the
Commission's action in this matter will not constitute any major federal action
significantly affecting the quality of the human environment.

     No other federal agency has prepared or is preparing an environmental
impact statement with regard to the proposed transactions.


                                    SIGNATURE

     Pursuant to the requirements of the Public Utility Holding Company Act of
1935, the undersigned companies have duly caused this statement to be signed on
their behalf by the undersigned thereunto duly authorized.

                                    AMERICAN ELECTRIC POWER COMPANY, INC.
                                    AMERICAN ELECTRIC POWER SERVICE CORPORATION
                                    CENTRAL AND SOUTH WEST CORPORATION
                                    CENTRAL POWER AND LIGHT COMPANY
                                    COLUMBUS SOUTHERN POWER COMPANY
                                    OHIO POWER COMPANY
                                    SOUTHWESTERN ELECTRIC POWER COMPANY
                                    WEST TEXAS UTILITIES COMPANY

                                    /s/ A.A. Pena
                                    -----------------------------
                                            Treasurer


Dated:  October 12, 2001

                                       42