SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 40-F
(Check One)
o |
Registration statement pursuant to Section 12 of the Securities Exchange Act of 1934 | |
|
or | |
ý |
Annual report pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934 |
For fiscal year ended: |
December 31, 2016 No. 1-12384 |
SUNCOR ENERGY INC.
(Exact name of registrant as specified in its charter)
Canada |
1311,1321,2911, 4613,5171,5172 (Primary standard industrial classification code number, if applicable) |
98-0343201 (I.R.S. employer identification number, if applicable) |
150 - 6th Avenue S.W.
Box 2844
Calgary, Alberta, Canada T2P 3E3
(403) 296-8000
(Address and telephone number of registrant's principal executive office)
CT Corporation System
111 Eighth Avenue
New York, New York, U.S.A. 10011
(212) 894-8940
(Name, address and telephone number of agent for service in the United States)
Securities registered pursuant to Section 12(b) of the Act:
Title of each class: |
Name of each exchange on which registered: |
|
Common shares |
New York Stock Exchange |
Securities registered or to be registered pursuant to Section 12(g) of the Act:
None
Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act:
None
For annual reports, indicate by check mark the information filed with this form:
ý |
Annual Information Form | ý | Annual Audited Financial Statements |
Indicate the number of outstanding shares of each of the issuer's classes of capital or common stock as of the close of the period covered by the annual report:
Common Shares |
As of December 31, 2016 there were 1,667,913,629 Common Shares issued and outstanding |
Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Exchange Act during the preceding 12 months (or for such shorter period that the registrant was required to file such reports); and (2) has been subject to such filing requirements in the past 90 days.
Yes |
ý | No | o |
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Yes |
o | No | o |
This annual report on Form 40-F is incorporated by reference into and as an exhibit to, as applicable, each of the following Registration Statements of the Registrant under the Securities Act of 1933: Form S-8 (File No. 333-87604), Form S-8 (File No. 333-112234), Form S-8 (File No. 333-118648), Form S-8 (File No. 333-124415), Form S-8 (File No. 333-149532), Form S-8 (File No. 333-161021) and Form S-8 (File No. 333-161029). The Registrant's Annual Information Form dated March 1, 2017, included in this annual report on Form 40-F, and Audited Consolidated Financial Statements and Management's Discussion and Analysis for the year ended December 31, 2016, included as Exhibit 99-1 and Exhibit 99-2, respectively, to this annual report on Form 40-F, are incorporated by reference into and as an exhibit to, as applicable, the Registrant's Registration Statement on Form F-10 (File No. 333-212212).
ANNUAL INFORMATION FORM DATED MARCH 1, 2017
TABLE OF CONTENTS
1 | Advisories | |
|
||
2 | Glossary of Terms and Abbreviations | |
2 | Common Industry Terms | |
4 | Common Abbreviations | |
4 | Conversion Table | |
|
||
5 | Corporate Structure | |
5 | Name and Incorporation | |
5 | Intercorporate Relationships | |
|
||
7 | General Development of the Business | |
7 | Overview | |
9 | Three-Year History | |
|
||
11 | Narrative Description of Suncor's Businesses | |
11 | Oil Sands | |
16 | Exploration and Production | |
21 | Refining and Marketing | |
25 | Other Suncor Businesses | |
|
||
26 | Suncor Employees | |
|
||
27 | Ethics, Social and Environmental Policies | |
|
||
28 | Statement of Reserves Data and Other Oil and Gas Information | |
30 | Oil and Gas Reserves Tables and Notes | |
35 | Future Net Revenues Tables and Notes | |
41 | Additional Information Relating to Reserves Data | |
|
||
52 | Industry Conditions | |
|
||
58 | Risk Factors | |
|
||
67 | Dividends | |
|
||
68 | Description of Capital Structure | |
|
||
70 | Market for Securities | |
|
||
71 | Directors and Executive Officers | |
|
||
77 | Audit Committee Information | |
|
||
79 | Legal Proceedings and Regulatory Actions | |
|
||
79 | Interest of Management and Others in Material Transactions | |
|
||
79 | Transfer Agent and Registrar | |
|
||
79 | Material Contracts | |
|
||
79 | Interests of Experts | |
|
||
80 | Disclosure Pursuant to the Requirements of the New York Stock Exchange | |
|
||
80 | Additional Information | |
|
||
81 | Advisory Forward-Looking Information and Non-GAAP Financial Measures | |
|
||
Schedules | ||
A-1 | SCHEDULE "A" AUDIT COMMITTEE MANDATE | |
B-1 | SCHEDULE "B" SUNCOR ENERGY INC. POLICY AND PROCEDURES FOR PRE-APPROVAL OF AUDIT AND NON-AUDIT SERVICES | |
C-1 | SCHEDULE "C" FORM 51-101F2 REPORT ON RESERVES DATA BY INDEPENDENT QUALIFIED RESERVES EVALUATOR OR AUDITOR | |
D-1 | SCHEDULE "D" FORM 51-101F2 REPORT ON RESERVES DATA BY INDEPENDENT QUALIFIED RESERVES EVALUATOR OR AUDITOR | |
E-1 | SCHEDULE "E" FORM 51-101F3 REPORT OF MANAGEMENT AND DIRECTORS ON RESERVES DATA AND OTHER INFORMATION |
In this Annual Information Form (AIF), references to "we", "our", "us", "Suncor" or "the company" mean Suncor Energy Inc., its subsidiaries, partnerships and joint arrangements, unless the context otherwise requires. References to the "Board of Directors" or the "Board" mean the Board of Directors of Suncor Energy Inc.
All financial information is reported in Canadian dollars, unless otherwise noted. Production volumes are presented on a working-interest basis, before royalties, unless otherwise noted.
References to the 2016 audited Consolidated Financial Statements mean Suncor's audited Consolidated Financial Statements prepared in accordance with Canadian generally accepted accounting principles (GAAP), which is within the framework of International Financial Reporting Standards (IFRS), the notes and the auditors' report, as at and for each year in the two-year period ended December 31, 2016. References to our MD&A mean Suncor's Management's Discussion and Analysis, dated March 1, 2017.
This AIF contains forward-looking statements based on Suncor's current plans, expectations, estimates, projections and assumptions. This information is subject to a number of risks and uncertainties, including those discussed in this document in the Risk Factors section, many of which are beyond the company's control. Users of this information are cautioned that actual results may differ materially. Refer to the Advisory Forward-Looking Information and Non-GAAP Financial Measures section of this AIF for information regarding risk factors and material assumptions underlying our forward-looking statements.
Information contained in or otherwise accessible through Suncor's website www.suncor.com does not form a part of this AIF and is not incorporated into this AIF by reference.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 1
GLOSSARY OF TERMS AND ABBREVIATIONS
Common Industry Terms
Products
Crude oil is a mixture, consisting mainly of pentanes (lighter hydrocarbons) and heavier hydrocarbons, that exists in the liquid phase in reservoirs and remains liquid at atmospheric pressure and temperature. Crude oil may contain small amounts of sulphur and other non-hydrocarbons, but does not include liquids obtained in the processing of natural gas.
Bitumen is a naturally occurring solid or semi-solid hydrocarbon, consisting mainly of heavier hydrocarbons that are too heavy or thick to flow or be pumped without being diluted or heated, and that is not primarily recoverable at economic rates through a well without the implementation of enhanced recovery methods. After it is extracted, bitumen may be upgraded into crude oil and other petroleum products.
Light Crude Oil is crude oil with a relative density greater than 31.1 degrees API gravity.
Medium Crude Oil is crude oil with a relative density greater than 22.3 degrees API gravity and less than or equal to 31.1 degrees API gravity.
Heavy Crude Oil is crude oil with a relative density greater than 10.0 degrees API gravity and less than or equal to 22.3 degrees API gravity.
Oil sands are naturally occurring stratified deposits of unconsolidated sand/sandstone and other sedimentary rocks saturated with varying amounts of water and bitumen.
Synthetic crude oil (SCO) is a mixture of liquid hydrocarbons derived by upgrading bitumen and may contain sulphur or other elements or compounds. SCO with lower sulphur content is referred to as sweet synthetic crude oil, while SCO with higher sulphur content is referred to as sour synthetic crude oil.
Natural gas is a naturally occurring mixture of hydrocarbon gases and other gases.
Conventional natural gas is natural gas that has been generated elsewhere and has migrated as a result of hydrodynamic forces and is trapped in discrete accumulations by seals that may be formed by localized structural, depositional or erosional geological features.
Natural gas liquids (NGLs) are hydrocarbon components that can be recovered from natural gas as a liquid, including, but not limited to, ethane, propane, butanes, pentanes, and condensates.
Liquefied petroleum gas (LPG) consists predominantly of propane and/or butane and, in Canada, frequently includes ethane.
Oil and gas exploration and development terms
Development costs are costs incurred to obtain access to reserves and to provide facilities for extracting, treating, gathering and storing oil and gas from reserves.
Exploration costs are costs incurred in identifying areas that may warrant examination and in examining specific areas that are considered to have prospects that may contain oil and gas reserves, including costs of drilling exploratory wells and exploratory-type stratigraphic test wells.
Field is a defined geographical area consisting of one or more pools containing hydrocarbons.
Reservoir is a porous and permeable subsurface rock unit that contains a separate accumulation of petroleum that is confined by impermeable rock or water barriers and is characterized by a single pressure system.
Wells
Delineation wells are drilled for the purpose of assessing the stratigraphy, structure and bitumen saturation of an oil sands lease. The wells are also used to define known accumulations for the assignment of reserves.
Development wells are drilled inside the established limits of an oil or gas reservoir, or in close proximity to the edge of the reservoir, to the depth of a stratigraphic horizon known to be productive.
Disposal wells are drilled in areas where excess fluids from operations can be safely injected for safe disposal. These wells are operated within limits approved by the appropriate regulatory bodies.
Dry holes are exploratory or development wells found to be incapable of producing either oil or gas in sufficient quantities to justify the completion as an oil or gas well.
Exploratory wells are drilled in a territory without existing proved reserves, with the intention of discovering commercial reservoirs or deposits of crude oil and/or natural gas.
Infill wells are drilled between existing development wells to target regions of the reservoir containing bypassed hydrocarbons or to accelerate production.
2 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Observation wells are used to monitor changes in a producing field. Parameters being monitored may include fluid saturations, temperature or reservoir pressure.
Service wells are development wells drilled or completed for the purpose of supporting production in an existing field, such as wells drilled for the purpose of injecting gas, steam or water.
Stratigraphic test wells are usually drilled without the intention of being completed for production and are geologically directed to obtain information pertaining to a specific geologic condition, such as core hole drilling or delineation wells on oil sands leases, or to measure the commercial potential (i.e., size and quality) of a discovery, such as appraisal wells for offshore discoveries.
Production terms
Downstream refers to the refining of crude oil and the selling and distribution of refined products in retail and wholesale channels.
Extraction refers to the process of separating bitumen from oil sands.
Feedstock generally refers either to (i) the bitumen required in the production of SCO for the company's oil sands operations, or (ii) crude oil and/or other components required in the production of refined petroleum products for the company's downstream operations.
In situ refers to methods of extracting bitumen from deep deposits of oil sands by means other than surface mining.
Midstream refers to transportation, storage and wholesale marketing of crude or refined petroleum products.
Overburden is the material overlying oil sands that must be removed before mining. Overburden is removed on an ongoing basis to continually expose the ore.
Production sharing contracts (PSC) are a common type of contract, outside North America, signed between a government and a resource extraction company that states how much of the resource produced each party will receive and which parties are responsible for the development of the resource and operation of associated facilities. The resource extraction company does not obtain title to the product; however, the company is subject to the upstream risks and rewards. An exploration and production sharing agreement (EPSA) is a form of PSC, which also states which parties are responsible for exploration activities.
Steam-to-oil ratio (SOR) is a metric used to quantify the efficiency of an in situ oil recovery process, which measures the cubic metres of water (converted to steam) required to produce one cubic metre of oil. A lower ratio indicates more efficient use of steam.
Tailings Reduction Operations (TROTM) is a process involving the conversion of fluid fine tailings into a solid landscape suitable for reclamation. In this process, mature fine tailings are mixed with a polymer flocculent and deposited in thin layers over sand beaches with shallow slopes. The resulting product is a dry material that is capable of being reclaimed in place or moved to another location for final reclamation.
Upgrading is the two-stage process by which bitumen is converted into SCO.
Primary upgrading, also referred to as coking or thermal cracking, heats the bitumen in coke drums to remove excess carbon. The superheated hydrocarbon vapours are sent to fractionators where they condense into naphtha, kerosene and gas oil. Carbon residue, or coke, is removed from the coke drums periodically and later sold as a byproduct.
Secondary upgrading, a purification process also referred to as hydrotreating, adds hydrogen to, and reduces the sulphur and nitrogen of, primary upgrading output to create sweet SCO and diesel.
Upstream refers to the exploration, development and production of crude oil, bitumen or natural gas.
Reserves
Please refer to the Definitions for Reserves Data Tables section of the Statement of Reserves Data and Other Oil and Gas Information in this AIF.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 3
Common Abbreviations
The following is a list of abbreviations that may be used in this AIF:
Measurement | ||
bbl(s) | barrel(s) | |
bbls/d | barrels per day | |
mbbls | thousands of barrels | |
mbbls/d | thousands of barrels per day | |
mmbbls | millions of barrels | |
mmbbls/d | millions of barrels per day | |
boe | barrels of oil equivalent | |
boe/d | barrels of oil equivalent per day | |
mboe | thousands of barrels of oil equivalent | |
mboe/d | thousands of barrels of oil equivalent per day | |
mmboe | millions of barrels of oil equivalent | |
mmboe/d | millions of barrels of oil equivalent per day | |
mcf | thousands of cubic feet of natural gas | |
mcf/d | thousands of cubic feet of natural gas per day | |
mcfe | thousands of cubic feet of natural gas equivalent | |
mmcf | millions of cubic feet of natural gas | |
mmcf/d | millions of cubic feet of natural gas per day | |
mmcfe | millions of cubic feet of natural gas equivalent | |
mmcfe/d | millions of cubic feet of natural gas equivalent per day | |
bcf | billions of cubic feet of natural gas | |
bcfe | billions of cubic feet of natural gas equivalent | |
GJ | gigajoules | |
mmbtu | millions of British thermal units | |
API | American Petroleum Institute | |
CO2 | carbon dioxide | |
CO2e | carbon dioxide equivalent | |
m3 | cubic metres | |
m3/d | cubic metres per day | |
km | kilometres | |
MW | Megawatts | |
Mt | Megatonnes | |
Places and Currencies |
||
U.S. | United States | |
U.K. | United Kingdom | |
B.C. | British Columbia | |
$ or Cdn$ | Canadian dollars | |
US$ | United States dollars | |
£ | Pounds sterling | |
€ | Euros | |
Products, Markets and Processes |
||
WTI | West Texas Intermediate | |
WCS | Western Canadian Select | |
NGL(s) | natural gas liquid(s) | |
LPG | liquefied petroleum gas | |
SCO | synthetic crude oil | |
NYMEX | New York Mercantile Exchange | |
TSX | Toronto Stock Exchange | |
NYSE | New York Stock Exchange | |
SAGD | steam-assisted gravity drainage |
Suncor converts certain natural gas volumes to boe, boe/d, mboe, mboe/d and mmboe on the basis of six mcf to one boe. Any figure presented in boe, boe/d, mboe, mboe/d or mmboe may be misleading, particularly if used in isolation. A conversion ratio of six mcf of natural gas to one bbl of crude oil or NGLs is based on an energy equivalency conversion method primarily applicable at the burner tip and does not necessarily represent value equivalency at the wellhead. Given that the value ratio based on the current price of crude oil as compared to natural gas is significantly different from the energy equivalency of 6:1, utilizing a conversion on a 6:1 basis may be misleading as an indication of value.
Conversion Table(1)(2)
1 m3 liquids = 6.29 barrels | 1 tonne = 0.984 tons (long) | |
1 m3 natural gas = 35.49 cubic feet | 1 tonne = 1.102 tons (short) | |
1 m3 overburden = 1.31 cubic yards | 1 kilometre = 0.62 miles | |
1 hectare = 2.5 acres |
4 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
CORPORATE STRUCTURE
Name and Incorporation
Suncor Energy Inc. (formerly Suncor Inc.) was originally formed by the amalgamation under the Canada Business Corporations Act (the CBCA) on August 22, 1979, of Sun Oil Company Limited, incorporated in 1923, and Great Canadian Oil Sands Limited, incorporated in 1953. On January 1, 1989, the company further amalgamated with a wholly owned subsidiary under the CBCA. We amended our articles in 1995 to move our registered office from Toronto, Ontario, to Calgary, Alberta, and again in April 1997 to adopt the name, "Suncor Energy Inc." In April 1997, May 2000, May 2002, and May 2008, the company amended its articles to divide its issued and outstanding shares on a two-for-one basis.
Pursuant to an arrangement under the CBCA, which was completed effective August 1, 2009, Suncor amalgamated with Petro-Canada to form a single corporation continuing under the name "Suncor Energy Inc." On January 1, 2017, Suncor amalgamated with certain of its wholly owned subsidiaries under the CBCA.
Suncor's registered and head office is located at 150 6th Avenue S.W., Calgary, Alberta, T2P 3E3.
Intercorporate Relationships
Material subsidiaries, each of which was owned 100%, directly or indirectly, by the company as at December 31, 2016, are as follows:
Name |
Jurisdiction Where Organized |
Description | |||
|
|||||
Canadian operations | |||||
|
|||||
Suncor Energy Oil Sands Limited Partnership | Alberta | This partnership holds most of the company's oil sands operations assets. | |||
|
|||||
Suncor Energy Products Inc. | Canada | This subsidiary held interests in the company's energy marketing and renewable energy businesses.(1) | |||
|
|||||
Suncor Energy Products Partnership | Alberta | This partnership holds substantially all of the company's Canadian refining and marketing assets. | |||
|
|||||
Suncor Energy Marketing Inc. | Alberta | Through this subsidiary, production from our upstream Canadian businesses is marketed. This subsidiary also administers Suncor's energy trading and power activities, markets certain third-party products, procures crude oil feedstock and natural gas for our downstream business, and procures and markets NGLs and LPG for our downstream business. | |||
|
|||||
Suncor Energy Ventures Holding Corporation | Alberta | A subsidiary which indirectly owned a 36.74% ownership in the Syncrude joint operation previously owned by Canadian Oil Sands Limited (COS).(2) | |||
|
|||||
Suncor Energy Ventures Partnership | Alberta | A subsidiary which owns a 17% ownership in the Syncrude joint operation. | |||
|
|||||
U.S. operations | |||||
|
|||||
Suncor Energy (U.S.A.) Marketing Inc. | Delaware | A subsidiary that procures and markets third-party crude oil, in addition to procuring crude oil feedstock for the company's refining operations. | |||
|
|||||
Suncor Energy (U.S.A.) Inc. | Delaware | A subsidiary through which our U.S. refining and marketing operations are conducted. | |||
|
|||||
International operations | |||||
|
|||||
Suncor Energy UK Limited | U.K. | A subsidiary through which the majority of our operations in the U.K. are conducted. | |||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 5
The company's remaining subsidiaries each accounted for (i) less than 10% of the company's consolidated assets as at December 31, 2016, and (ii) less than 10% of the company's consolidated operating revenues for the fiscal year ended December 31, 2016. In aggregate, the remaining subsidiaries accounted for less than 20% of each of the company's consolidated assets as at December 31, 2016 and the company's consolidated operating revenues for the fiscal year ended December 31, 2016.
6 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
GENERAL DEVELOPMENT OF THE BUSINESS
Overview
Suncor is an integrated energy company headquartered in Calgary, Alberta, Canada. We are strategically focused on developing one of the world's largest petroleum resource basins Canada's Athabasca oil sands. In addition, we explore for, acquire, develop, produce and market crude oil and natural gas in Canada and internationally; we transport and refine crude oil, and we market petroleum and petrochemical products primarily in Canada. We also conduct energy trading activities focused principally on the marketing and trading of crude oil, natural gas, power and byproducts. We also operate a renewable energy business as part of our overall portfolio of assets.
Suncor has classified its operations into the following segments:
OIL SANDS
Suncor's Oil Sands segment, with assets located in the Athabasca oil sands of northeast Alberta, recovers bitumen from mining and in situ operations and either upgrades this production into SCO for refinery feedstock and diesel fuel, or blends the bitumen with diluent for direct sale to market. The Oil Sands segment is comprised of:
EXPLORATION AND PRODUCTION
Suncor's Exploration and Production (E&P) segment consists of offshore operations off the east coast of Canada and in the North Sea, and onshore assets in North America, Libya and Syria.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 7
REFINING AND MARKETING
Suncor's Refining and Marketing segment consists of two primary operations:
CORPORATE, ENERGY TRADING AND ELIMINATIONS
The grouping Corporate, Energy Trading and Eliminations includes the company's investments in renewable energy projects, results related to energy marketing, supply and trading activities, and other activities not directly attributable to any other operating segment.
8 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Three-Year History
Over the last three years, several events have influenced the general development of Suncor's business.
2014
2015
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 9
2016
10 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
NARRATIVE DESCRIPTION OF SUNCOR'S BUSINESSES
For a discussion of the environmental and other regulatory conditions, and competitive conditions and seasonal impacts affecting our segments, refer to the Industry Conditions and Risk Factors sections of this AIF.
Oil Sands
Oil Sands Operations Assets and Operations
Oil Sands Base Operations
Our integrated Oil Sands Base operations, located in the Athabasca oil sands region of northeast Alberta, involve numerous activities:
After overburden is removed, open-pit mining operations use shovels to excavate oil sands bitumen ore, which is trucked to sizers and breaker units that reduce the size of the ore. Next, a slurry of hot water, sand and bitumen is created and delivered via a pipeline to extraction plants. The raw bitumen is separated from the slurry using a hot water process that creates a bitumen froth. Naphtha is added to the bitumen froth to form a diluted bitumen, which is subsequently sent to a centrifuge plant that removes most of the remaining impurities and minerals. Coarse tailings produced in this process are placed directly into sand placement areas.
After the diluted bitumen is transferred to upgrading facilities, the naphtha is removed and recycled to be used again as diluent in the extraction processes. Bitumen is upgraded through a coking and distillation process. The upgraded product, referred to as sour SCO, is either sold to market or upgraded further into sweet SCO by removing sulphur and nitrogen using a hydrotreating process. In addition to sweet and sour SCO, upgrading processes also produce diesel and other byproducts.
To generate steam for the mining and extraction process, the company uses either a cogeneration unit or coke-fired boilers. Electricity is generated by turbine generators, most of which are part of the Oil Sands Base cogeneration unit, or provided by cogeneration units at Firebag. Process water is used in extraction processes and then recycled.
Suncor regularly conducts planned maintenance events at its facilities. Large planned maintenance events that require units to be taken offline to be completed are often referred to as turnarounds. Turnaround maintenance provides opportunities for both preventive maintenance and capital replacement, which are expected to improve reliability and operational efficiency. Planned maintenance events generally occur on routine cycles, determined by historical operating performance, recommended usage factors or regulatory requirements. A turnaround typically involves shutting down the unit, inspecting it for wear or other damage, repairing or replacing components, and then restarting the unit. Operations may be impacted during these activities.
Mining processes disturb areas of land that must be reclaimed. Land reclamation activities involve soil salvage and replacement, wetlands research, the protection of fish, waterfowl and other wildlife, and re-vegetation.
Oil sands tailings are the remaining sand, water, clay, silt and residual hydrocarbons left after the majority of hydrocarbons are extracted from the ore during the water-based bitumen extraction process. Suncor submitted an updated tailings management plan that is requesting an increase in treatment capacity within the current tailings management approach (TROTM) at the company's Oil Sands Base Plant. This approach aligns with the Government of Alberta's Tailings Management Framework (TMF) and the Alberta Energy Regulator's (AER) Directive 085 Fluid Tailings Management for Oil Sands Mining Projects (the Tailings Directive).
Oil Sands Base Assets
Millennium and North Steepbank
Suncor pioneered the commercial development of the Athabasca oil sands beginning in 1962, achieving first production in 1967; 2017 marks Suncor's 50th anniversary of producing oil from the Athabasca oil sands. Bitumen is currently mined from the Millennium area, which began production in 2001, and the North Steepbank area, which began production in 2011. During 2016, the company mined approximately 129 million tonnes of bitumen ore (2015 168 million tonnes) and processed an average of 238 mbbls/d of mined bitumen in its extraction facilities (2015 307 mbbls/d). Due to the forest fires that occurred in the second quarter of 2016, production was shut in and, therefore, did not reach full production capacity throughout 2016.
Upgrading facilities
Suncor's upgrading facilities consist of two upgraders: Upgrader 1, which has an upgrading capacity of approximately 110 mbbls/d of SCO, and Upgrader 2, which
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 11
has an upgrading capacity of approximately 240 mbbls/d of SCO. Suncor's secondary upgrading facilities consist of three hydrogen plants, three naphtha hydrotreaters, two gas oil hydrotreaters, one diesel hydrotreater and one kero hydrotreater.
During 2016, Suncor averaged 259 mbbls/d of upgraded (SCO and diesel) production net of the company's internal consumption (2015 320 mbbls/d) sourced from bitumen provided by both Oil Sands Base and In Situ operations. Due to the forest fires that occurred in the second quarter of 2016, the upgrader units did not produce to full capacity throughout 2016.
Other Mining Leases
Suncor owns several other oil sands leases, including Voyageur South and Audet, which it believes can be developed using mining techniques. Suncor undertakes exploratory drilling programs on such leases from time to time, as part of its mine replacement projects. Suncor holds a 100% working interest in both Voyageur South and Audet.
In Situ Operations
Suncor's In Situ operations, Firebag and MacKay River, use SAGD technology to produce bitumen from oil sands deposits that are too deep to be mined economically.
SAGD is an enhanced oil recovery technology for producing bitumen. It requires drilling pairs of horizontal wells with one located above the other. To help reduce land disturbance and improve cost efficiency, well pairs are drilled from multi-well pads. Low pressure steam is injected into the upper wellbore to create a high-temperature steam chamber underground. This process reduces the viscosity of the bitumen, allowing heated bitumen and condensed steam to drain into the lower wellbore and flow up to the surface aided by subsurface pumps or circulating gas.
The bitumen and water mixture is pumped to separation units at central processing facilities, where the water is removed from the bitumen, treated and recycled for use in steam generation. To facilitate shipment, In Situ operations blend diluent with the bitumen, or transport it through an insulated pipeline as hot bitumen.
To generate steam for operations, the company uses Once Through Steam Generators (OTSGs) or cogeneration units. OTSGs are fuelled by both purchased natural gas and produced natural gas recovered at central processing facilities. Cogeneration units are energy-efficient systems, which use natural gas combustion to power turbines that generate electricity and steam used in SAGD operations. Excess electricity generation from cogeneration units is used at Oil Sands Base facilities or sold to the Alberta power grid.
Central processing facilities, steam generation units and well pads are all subject to routine inspection and maintenance cycles.
SAGD production volumes are impacted by reservoir quality and the capacity of central processing facilities and steam generation units to process liquids and generate steam. As with conventional oil and gas properties, SAGD wells experience natural production declines after several years. In an effort to maintain bitumen supply, Suncor drills new wells from existing well pads or constructs new well pads to facilitate future well drilling.
In Situ Assets
Firebag
Production from Suncor's Firebag operations commenced in 2004. Suncor's Firebag complex consists of four central processing facilities with a total capacity of 203 mbbls/d. The capacity was increased from 180 mbbls/d to 203 mbbls/d, effective January 1, 2016, as a result of debottlenecking activities. Actual production from Firebag varies based on steaming and ramp-up periods for new wells, planned and unplanned maintenance, reservoir conditions and other factors.
As at December 31, 2016, Firebag had 12 well pads in operation, with 154 SAGD well pairs and 38 infill wells either producing or on initial steam injection. Central processing facilities have been designed to be flexible as to which well pads supply bitumen. Steam generated at the various facilities can be used at multiple well pads. In addition, Firebag includes five cogeneration units that generate steam, which are capable of producing approximately 475 MW of electricity. The Firebag site power load requirements are approximately 85 MW, and in 2016 Firebag exported approximately 215 MW of electricity to the Alberta power grid and Oil Sands Base Plant. Due to the forest fires that occurred in the second quarter of 2016, the cogeneration units did not produce to full capacity throughout 2016. There are also 13 OTSGs at the site for additional steam generation.
During 2016, Firebag production averaged 181 mbbls/d (2015 187 mbbls/d) with a SOR of 2.6 (2015 2.6).
12 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
MacKay River
Production from Suncor's MacKay River operations commenced in 2002. As at December 31, 2016, MacKay River included seven well pads with 108 well pairs either producing or on initial steam injection. The MacKay River central processing facilities have bitumen processing capacity of 38 mbbls/d. A third party owns the on-site cogeneration unit, which Suncor operates under a commercial agreement, that generates steam and electricity. There are also four OTSGs at the site for additional steam generation. Due to the forest fires that occurred in the second quarter of 2016, the central processing facilities did not produce to full capacity throughout 2016.
During 2016, MacKay River production averaged 28 mbbls/d (2015 31 mbbls/d) with a SOR of 3.2 (2015 2.9).
Suncor has regulatory approval to increase bitumen processing capacity by approximately 20 mbbls/d with an additional central processing facility at MacKay River.
Other In Situ Leases
Suncor owns and operates several other oil sands leases which may support future in situ production, such as Meadow Creek, Lewis, OSLO, Chard, and a non-operated interest in Kirby on which it may undertake exploratory or delineation drilling. Suncor holds a 100% working interest in Lewis, a 75% working interest in Meadow Creek, a 77.78% working interest in OSLO, interests varying from 25% to 50% in Chard and a 10% working interest in Kirby. In 2016, Suncor drilled 54 stratigraphic test wells at Lewis; 44 gross stratigraphic test wells and two service wells at Meadow Creek; five gross stratigraphic test wells at OSLO (which is adjacent to Lewis); and no drilling occurred at Kirby in 2016. Suncor does not have plans for winter 2017 drilling at Lewis, OSLO and Meadow Creek.
Starting with Meadow Creek, Suncor is evaluating a greenfield growth plan with a concept to further develop new in situ reservoirs using a replication strategy to build standardized surface facilities, well pads and infrastructure. This plan is expected to reduce facility capital expenditures.
Oil Sands Ventures
Syncrude
Suncor holds a 53.74% interest in the Syncrude joint operation with gross bitumen conversion capacity of 350 mbbls/d (188 mbbls/d net to Suncor) to intermediate sour SCO. The company's interest in Syncrude increased in 2016 from 12% as a result of the acquisition of COS (which held a 36.74% interest in Syncrude), and the purchase of an additional 5% interest in the joint operation from Murphy. Syncrude began producing in 1978 and is operated by Syncrude Canada Ltd. (SCL). In 2006, SCL entered into a management services agreement with Imperial Oil Resources (Imperial Oil) to provide business services and leadership. The project is located near Fort McMurray and includes mining operations at Mildred Lake North and Aurora North. In 2012, the Syncrude co-owners announced a plan to develop two mining areas adjacent to the current mine, subject to final sanctioning and regulatory approvals, which would consequently extend the life of Mildred Lake by a minimum of 10 years. The plan proposes to use existing mining and extraction facilities. Regulatory applications for these areas were submitted in December 2014.
Syncrude mining operations use truck, shovel and pipeline systems, similar to those at Oil Sands Base. Extraction and upgrading technologies at Syncrude are similar to those used at Oil Sands Base, with the exception that Syncrude uses a fluid coking process that involves the continuous thermal cracking of the heaviest hydrocarbons. At Mildred Lake, electricity is provided by a utility plant fuelled by natural gas and off-gas from upgrading operations. At Aurora North, Syncrude operates two 80-MW gas turbine power plants to provide electricity.
Syncrude produces a single sweet synthetic light crude product. Marketing of this product is the responsibility of the individual co-owners.
Land reclamation activities are similar to those at Oil Sands Base; however, certain aspects of the tailings management processes are different. Syncrude's tailings plan uses the following: freshwater capping, a composite tails mixture of fine tails and gypsum, and centrifuge technology that separates water from tailings.
In 2016, Suncor's share of Syncrude production averaged 130 mbbls/d (2015 30 mbbls/d). Due to the forest fires that occurred in the second quarter of 2016, Syncrude did not produce to full capacity throughout 2016. Sustaining capital expenditures in 2017 for Syncrude are expected to focus on planned maintenance.
Fort Hills
Fort Hills is an oil sands mining area comprising leases on the east side of the Athabasca River, north of Oil Sands Base operations. Fort Hills will use a paraffinic froth treatment process to produce a marketable bitumen product which partially decarbonizes the oil and returns approximately 70% of the barrel, which has the highest carbon content, to the mine. Suncor originally acquired a 60% working interest in Fort Hills through the merger with Petro-Canada, and subsequently disposed of 19.2% as part of transactions with Total E&P. In November 2015, Suncor purchased an additional 10% working interest in the Fort Hills project from Total E&P. Designs for the Fort Hills mining project were updated during 2016, resulting in an
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 13
increase in nameplate capacity to 194 mbbls/d (gross) of bitumen (99 mbbls/d net to Suncor).
Suncor holds a 50.8% working interest in Fort Hills and is the operator of the project. The company's share of the project costs is estimated to be $8.1 $8.3 billion, including the impacts of changes in the Canadian dollar since the project was sanctioned. Suncor's share of Fort Hills' remaining project capital is between $1.6 and $1.8 billion. The majority of the spend will occur in 2017 and will be completed within Suncor's existing capital guidance range. Project activities in 2017 will focus on final construction completion of utilities, the first train of secondary extraction and release of these project areas to operations. Activities will also include progress towards the remaining two trains of secondary extraction expected to be turned over in 2018 as originally planned.
As at December 31, 2016, Suncor had incurred $6.5 billion in project costs with completion of the module program. Installation of all major modules and all major equipment has been completed in both of the two remaining major construction areas, utilities and secondary extraction. Construction in these areas has achieved peak activity and continues to focus on productivity and achieving critical milestones for delivery of first oil per the target schedule. All other major project areas, mining, ore processing, site infrastructure, and extraction and tailings are in various stages of final construction completion, commissioning/start-up, and release to operations. Construction was 76% complete at December 31, 2016 and is now fully site-based. First oil continues to remain on track for late 2017.
Other Assets
Joslyn is an oil sands mining area, comprising leases southwest of Fort Hills and on the west side of the Athabasca River, that is operated by Total E&P. Preliminary designs for the Joslyn North mining project plan for 160 mbbls/d of bitumen production (gross). Suncor acquired a 36.75% working interest in this asset as a result of transactions with Total E&P. Although regulatory permits for the Joslyn North mining project have been obtained, in May 2014, Suncor, together with the other co-owners, agreed to scale back certain development activities. As a result of the decline in crude oil prices, in December 2015, the company wrote down the remaining carrying value of its share of the Joslyn mining project.
New Technology
Technology is a fundamental component to Suncor's business. Suncor pioneered commercial oil sands development and continues to advance technology through innovation and collaboration to improve efficiencies, lower costs and increase environmental performance. Development of new technology can take extended periods of time, first to demonstrate technical viability and then to demonstrate economic viability. The necessary validation typically occurs through a series of progressive tests which allow results to be reliably scaled and assessed for implementation.
In 2016, Suncor proved commercial viability of the following technologies:
Suncor is also working on, or has completed, several new technology projects that are proceeding with the next phase of field testing. Examples of Suncor's new technology projects include:
14 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
and water footprints. The second phase of the pilot project began operations in the third quarter of 2015 and is expected to continue through 2018.
Sales of Principal Products
Primary markets for SCO and bitumen production from Suncor's Oil Sands segment, which is sold to and subsequently marketed by Suncor's Energy Trading business, include refining operations in Alberta, Ontario, Quebec, the U.S. Midwest and the U.S. Rocky Mountain regions and markets on the U.S. Gulf Coast. Diesel production from upgrading operations is sold primarily in Western Canada and the United States, marketed by Suncor's Energy Trading business.
For bitumen production from In Situ operations, Suncor's marketing strategy allows it to take advantage of changes in market conditions by either upgrading the bitumen directly at our Oil Sands Base facilities, upgrading diluted bitumen at Suncor's Edmonton refinery, or selling diluted bitumen directly to third parties. Increased bitumen sales may also be required during upgrading facilities outages. In Situ bitumen production processed by Oil Sands Base upgrading facilities in 2016 decreased to 93 mbbls/d or 44% (2015 104 mbbls/d or 48%) of total in situ bitumen production.
2016 |
2015(2) |
||||||||
|
|
||||||||
Sales Volumes and Operating Revenues Principal Products | mbbls/d |
% operating revenues |
mbbls/d |
% operating revenues |
|||||
|
|||||||||
SCO and diesel (including Syncrude) | 392.0 | 88 | 350.6 | 85 | |||||
|
|||||||||
Bitumen | 117.4 | 11 | 107.7 | 14 | |||||
|
|||||||||
Byproducts and other operating revenues(1) | n/a | 1 | n/a | 1 | |||||
|
|||||||||
509.4 | 458.3 | ||||||||
|
In the normal course of business, Suncor enters into long-term sales agreements for its proprietary sour SCO, which contain varying terms with respect to pricing, volume, expiry and termination.
Distribution of Products
Production from Oil Sands operations is gathered into Suncor's Fort McMurray facilities at the Athabasca Terminal, which is operated by Enbridge Inc. (Enbridge). Suncor has arrangements with Enbridge to store SCO, diluted bitumen and diesel at this facility. Product moves from the Athabasca Terminal in the following ways:
From Edmonton and Hardisty, where Suncor has both owned storage capacity and additional capacity under contract, the company has various options for delivering product to customers:
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 15
Royalties
New oil sands projects are subject to the royalty framework issued by the Government of Alberta (the Royalty Framework), and regulated by the Oil Sands Royalty Regulation 2009 (OSRR 2009) and supporting regulations, which were approved in 2008.
Effective January 1, 2009, under the Royalty Framework, royalties for oil sands projects are based on a sliding-scale rate of 25% to 40% of net revenue, subject to a minimum royalty within a range of 1% to 9% of gross revenue. Revenues used in royalty formulas are driven primarily by benchmark prices for WCS, while sliding-scale percentages in royalty formulas depend on prices for WTI from Cdn$55/bbl for the minimum rate to the maximum rate at a WTI price of Cdn$120/bbl. A project remains subject to the minimum royalty (the pre-payout phase) until the project's cumulative gross revenue exceeds its cumulative costs, including an annual investment allowance (the post-payout phase).
Oil Sands Base and Syncrude
Beginning on January 1, 2016, Suncor's Oil Sands Base and Syncrude operations were subject to the generic royalty regime as set out in the Royalty Framework.
For prior years, both Suncor and the co-owners of Syncrude reached separate agreements with the Government of Alberta for the implementation of the Royalty Framework. These agreements expired at the end of 2015.
Under Suncor's Crown Royalty Agreement, for the period from January 1, 2010 to December 31, 2015, royalty rates for Oil Sands Base were based on a sliding scale, depending on the Canadian dollar equivalent for WTI, from 25% to 30% of net revenue. Oil Sands Base royalties are also subject to the minimum royalty rate range of 1.0% to 1.2% of gross revenue. In 2016, Suncor incurred royalties under the Royalty Framework at Oil Sands Base mining operations at a rate of 1.1% of gross revenue (2015 1.2% of gross revenue), a decrease from 2015 primarily due to lower oil prices. In 2016, Oil Sands Base royalties were a recovery of 1% of Oil Sands Base gross revenue (2015 expense of 1%) due to the impact of prior year audit settlements reached in 2016.
In 2015, Syncrude continued paying a bitumen-based royalty under its Crown Agreement on the greater of 1% of gross revenue, or 25% of net revenue. In 2016, under the Royalty Framework, the royalty rate at Syncrude was 25% of net revenue (2015 1% of gross revenue) as the net revenue royalty was determined to be greater than the gross revenue royalty or 1% of gross revenue. In 2016, Suncor incurred royalties on Syncrude operations averaging approximately 3% of Syncrude gross revenue (2015 3%).
In Situ
Royalty rates for Suncor's MacKay River and Firebag are based on the Royalty Framework.
In 2016, Suncor incurred royalties at an average rate of 1% of gross revenue for MacKay River (2015 2% of gross revenue) and royalties at an average rate of 2% of gross revenue for Firebag (2015 2% of gross revenue), which continues in the pre-payout phase.
Exploration and Production
E&P Canada Assets and Operations
East Coast Canada
Based in St. John's, Newfoundland and Labrador, this business includes interests in three producing fields and future developments and extensions. Suncor is also involved in exploration drilling for new opportunities. Suncor is the only company in this region with interests in every field currently in production.
Terra Nova
The Terra Nova oilfield is approximately 350 km southeast of St. John's. Terra Nova was discovered in 1984, and was the second oilfield to be developed offshore Newfoundland and Labrador. Operated by Suncor, the production system uses a Floating Production, Storage and Offloading (FPSO) vessel that is moored on location, and has gross production capacity of 180 mbbls/d (68 mbbls/d net to Suncor) and oil storage capacity of 960 mbbls. Terra Nova was the first harsh environment development in North America to use a FPSO vessel. Actual annual production levels are lower than production capacity, reflecting current reservoir capability, including natural declines, gas and water injection and production limits, and asset and facility reliability. The Terra Nova oilfield is divided into three distinct areas, known as the Graben, the East Flank and the Far East. Production from Terra Nova began in January 2002. The company plans to undertake drilling activities at Terra Nova in the second half of 2017. As at December 31, 2016, there were 30 wells: 17 oil production wells, 10 water injection wells and three gas injection wells.
In 2016, Suncor's share of Terra Nova production averaged 12 mbbls/d compared to 14 mbbls/d in 2015. Annual turnaround maintenance was completed at the Terra Nova facility in June 2016, which lasted approximately six weeks.
Hibernia and the Hibernia Southern Extension Unit (HSEU)
The Hibernia oilfield, encompassing the Hibernia and Ben Nevis Avalon reservoirs, is approximately 315 km southeast of St. John's and was the first field to be developed in the Jeanne d'Arc Basin. Operated by Hibernia Management and Development Company Ltd., the production system is a fixed Gravity Based Structure (GBS) that sits on the ocean
16 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
floor, and has gross production capacity of 230 mbbls/d (46 mbbls/d net to Suncor) and oil storage capacity of 1,300 mbbls. Actual production levels are lower, reflecting current reservoir capability, including natural declines, gas and water injection and production limits, and asset and facility reliability. Hibernia commenced production in November 1997. As at December 31, 2016, there were 70 wells: 39 oil production wells, 26 water injection wells and five gas injection wells.
In 2010, final agreements were signed between the Hibernia co-venturers and the Government of Newfoundland and Labrador that established the fiscal, equity and operational principles for the development of the HSEU. At the end of 2016, there were five oil production wells and eight water injection wells in the HSEU. The production wells were drilled from the GBS platform and are included in the Hibernia well count above. Of the eight water injection wells drilled in 2016, six were drilled using the mobile offshore drill rig West Aquarius at a single drill centre. Water for injection purposes is supplied from the GBS platform via a subsea flowline.
In 2016, Suncor's share of Hibernia production averaged 27 mbbls/d (2015 18 mbbls/d). Turnaround maintenance was completed at Hibernia in October 2015, which lasted approximately five weeks.
White Rose and the White Rose Extensions
White Rose is approximately 350 km southeast of St. John's. Operated by Husky Oil Operations Limited, White Rose uses a FPSO vessel and has gross production capacity of 140 mbbls/d (39 mbbls/d net to Suncor) and oil storage capacity of 940 mbbls. Actual annual production levels are lower than production capacity, reflecting current reservoir capability, including natural declines, gas and water injection and production limits, and asset and facility reliability. Production from White Rose began in November 2005. As at December 31, 2016, there were 37 wells: 18 oil production wells, 15 water injection wells, and four gas injection wells.
In 2007, the White Rose co-venturers signed an agreement with the Government of Newfoundland and Labrador for the development of the White Rose Extensions, which include the North Amethyst, South White Rose Extension, and West White Rose satellite fields. In May 2010, first oil was achieved at North Amethyst, and development drilling will continue in 2017. Development of the South White Rose Extension began in 2013, with first oil being achieved in June 2015. Development drilling will continue in 2017.
Development of the West White Rose field has been divided into two stages. The first stage was approved in 2010 and first oil was achieved in September 2011. In late 2014, sanction of the second stage of the project was deferred by the co-owners in response to the decline in the crude oil price environment. The co-owners are continuing to evaluate the project.
In 2016, Suncor's share of White Rose production averaged 11 mbbls/d (2015 12 mbbls/d). Turnaround maintenance was completed at White Rose in July 2016, which lasted approximately three weeks.
Hebron
Discovered in 1980, the Hebron oilfield is located 340 km southeast of St. John's and is operated by ExxonMobil Canada Properties (Exxon Mobil Canada). On December 31, 2012, the Hebron co-owners announced project sanction. Effective January 1, 2016, Suncor's working interest in the Hebron project was reset from 22.729% to 21.034%. Development of the Hebron project includes the construction of a concrete GBS that supports an integrated topsides deck to be used for production, drilling and accommodations. Development plans include 1,200 mbbls of oil storage capacity and 52 well slots with a gross oil production capacity of 150 mbbls/d (32 mbbls/d net to Suncor). Construction of the Hebron project continued during 2016 with integrated topside modules being successfully towed out to the deepwater construction site and mated with the GBS. Planned project activities in 2017 include sailing the GBS to its final oilfield location and the start of development drilling, with first oil expected in late 2017. Suncor's share of the post-sanction project cost estimate is approximately $2.8 billion (+/ 10%).
Other Assets
Suncor's participation in deepwater exploration drilling in the Shelburne Basin continued in 2016. Suncor holds a 20% non-operating interest in this project, located approximately 250 km offshore Nova Scotia. Two exploration wells have been completed, with costs charged to exploration expense.
Suncor continues to pursue opportunities offshore Newfoundland and Labrador. During 2014, Suncor was a successful joint bidder with ExxonMobil Canada for exploration licences in the Flemish Pass and Carson Basin, located approximately 500 km off the east coast of Newfoundland. The work commitment on these licences in the Flemish Pass and Carson Basin is over the next four to seven years. The company also holds interests in 51 significant discovery licences and nine exploration licences offshore in this area.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 17
The North America Onshore business explores for, develops and produces natural gas, NGLs, crude oil and byproducts in Western Canada. Suncor sold the majority of its natural gas business in 2013, followed by the sale in 2014 of its interests in its Wilson Creek assets in central Alberta. Following these disposals, the retained assets produce approximately 3 mboe/d, primarily natural gas, from the Kobes/Montney assets in northeast B.C., in which Suncor has a 100% working interest.
Suncor also holds undeveloped assets that allow the company to explore long-term opportunities.
E&P International Assets and Operations
North Sea
Buzzard
The Buzzard oilfield is located in the Outer Moray Firth, 95 km northeast of Aberdeen, Scotland. Operated by Nexen Petroleum U.K. Limited (Nexen U.K.), a subsidiary of China National Offshore Oil Corporation Limited, the Buzzard facilities have gross installed production capacity of approximately 220 mbbls/d (66 mbbls/d net to Suncor) of oil and 80 mmcf/d (24 mmcf/d net to Suncor) of natural gas. Actual annual production levels are lower than production capacity, reflecting current reservoir capability, including natural declines, water injection limits, gas and water production limits, and asset and infrastructure reliability. Buzzard commenced production in January 2007 and consists of four bridge-linked platforms supporting wellhead facilities, production facilities, living quarters and utilities, as well as sulphur handling. As at December 31, 2016, there were 48 wells: 35 oil and gas production wells and 13 water injection wells. In 2016, Suncor's share of Buzzard production averaged 46 mboe/d (2015 50 mboe/d). Turnaround maintenance was completed at Buzzard in October 2016, which lasted approximately five weeks.
Golden Eagle Area Development (GEAD)
GEAD, which is operated by Nexen U.K., is approximately 20 km north of the Buzzard oilfield and consists of the unitization of the Peregrine, Hobby, Golden Eagle and Solitaire discoveries. The development incorporates a production, utilities and accommodation platform, linked to a separate wellhead platform, with first oil achieved in October 2014. Peak production was re-rated in 2016 from 70 mboe/d (18 mboe/d net to Suncor) to 76 mboe/d (20 mboe/d net to Suncor). As at December 31, 2016, there were 19 wells: 14 oil and gas production wells and five water injection wells. In 2016, Suncor's share of GEAD production averaged 19 mboe/d (2015 15 mboe/d). The GEAD co-owners also hold adjacent exploration licences and continue to explore the region. Turnaround maintenance was completed at GEAD in August 2016, which lasted approximately two weeks.
Rosebank
During 2016, Suncor entered into an agreement to acquire a 30% participating interest in the Rosebank project from OMV (U.K.) Limited. This project, which was discovered in December 2004 and is operated by Chevron North Sea Limited, is located approximately 130 km northwest of the Shetland Islands, in the U.K. North Sea, in water depths of approximately 1,100 metres. The project is currently in the Front End Engineering and Design phase and has a design capacity of 100 mbbls/d (30 mbbls/d net to Suncor) of crude oil and 80 mmcf/d (24 mmcf/d net to Suncor) of natural gas. Suncor closed the purchase on October 6, 2016 for an initial payment of US$50 million. In the event the co-venturers approve the Rosebank project final investment decision and Suncor elects to participate, Suncor could pay additional consideration up to US$165 million.
Oda (Norway)
The Oda field (PL405 licence), previously known as the Butch discovery, was discovered in 2011 and is located 13 km east of the producing Ula field in the southern part of the Norwegian North Sea. Centrica plc is the operator and Suncor has a 30% working interest. The project was sanctioned in November 2016 and it is proposed that the field be developed with a subsea template that will be tied back to the Ula field. First oil is planned for 2019, with peak production expected to reach 35 mbbls/d (11 mbbls/d net to Suncor). Suncor's share of the post-sanction project cost estimate is approximately $270 million.
Other Assets
Other Suncor exploration and appraisal initiatives in the North Sea include:
Suncor continues to pursue other opportunities in the North Sea and Norwegian Sea. The company holds interests in 23 exploration licences in the U.K. and Norwegian sectors of these areas.
18 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Other International
Libya
In Libya, Suncor is a signatory to seven exploration and production sharing agreements (EPSAs) with the National Oil Company (NOC). Five of the seven EPSAs relate to fields with developed production and exploration prospects; the remaining two are exploration EPSAs related to properties that do not contain reserves, one of which is to be relinquished following an unsuccessful exploration program. Under the EPSAs, Suncor pays 100% of the exploration costs, 50% of the development costs and 12% of the operating costs. The development, operating and eligible exploration costs are recovered through a 12% share of production (Cost Recovery oil). Any Cost Recovery oil remaining after Suncor's costs have been recovered is referred to as excess petroleum, and is shared between Suncor and the NOC based on several factors. The total oil Suncor receives for cost recovery and its share of excess petroleum is referred to as entitlement volumes. The EPSAs expire on December 31, 2032, but include an initial five-year extension through the end of 2037. Libya is a member of the Organization of Petroleum Exporting Countries (OPEC) and is subject to quotas that can affect the company's production in Libya.
Since 2013, production and liftings in Libya have been intermittent due to political unrest, and the remaining value of Suncor's assets in Libya was written down in 2015. Production in Libya remained substantially shut-in through the majority of 2016 due to political unrest, with the timing of a return to normal operations remaining uncertain. Suncor continues to maintain its office in Libya, its rights to the underlying contracts, and meet its commitments under the terms of the EPSAs. The estimated cost of Suncor's remaining exploration work program commitment at December 31, 2016 is US$359 million. Suncor declared force majeure for all exploration commitments in Libya effective December 14, 2014 and this declaration remains in effect.
In 2016, Suncor changed its method of recording production in Libya to reflect entitlement volumes. Suncor's share of production in Libya on this entitlement basis averaged 0.4 mbbls/d in 2016. In previous periods, Suncor reported volumes on a 50% working interest share of total production (2015 2.8 mbbls/d on a working-interest basis).
Syria
In December 2011, amid continuing unrest in Syria, sanctions were imposed and Suncor declared force majeure under its contractual obligations, suspending its operations in the country. Consequently, the company has ceased recording all production and revenue associated with its Syrian assets. Since 2011, Suncor has not been able to monitor the status of any of its assets in the country, including whether certain facilities have suffered damage although the company believes the assets have sustained significant damage. As a result of continued uncertainty about Suncor's future in the country, the remaining value of the Suncor assets was impaired in 2013.
Prior to December 2011, Suncor conducted its Syrian operations pursuant to a production sharing contract (PSC), where the company paid 100% of the development costs and recovered these costs from a 40% share of production after deduction of royalties of 12.5%. This petroleum revenue is referred to as Cost Recovery petroleum. The amount by which Cost Recovery petroleum exceeded recoverable cost is referred to as Excess Cost Recovery petroleum; 50% of this amount is due to the General Petroleum Corporation (GPC) and the remaining 50% was shared between Suncor and the GPC according to a profit-sharing schedule.
Sales of Principal Products
Oil and gas production from East Coast Canada, the North Sea and from North America Onshore is either marketed by Suncor's Energy Trading business acting as a marketing agent, or sold to the company's Energy Trading business, which then markets the products to customers under direct sales arrangements. Suncor does not typically enter into long-term supply arrangements to sell its production from its Exploration and Production segment. Contracts for these direct sales arrangements are all made on a spot basis, and incorporate pricing that is generally determined on a daily or monthly basis in relation to a specified market reference price.
In Libya, crude oil is marketed by the NOC on behalf of Suncor.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 19
Exploration and Production Sales Summary:
2016 |
2015 |
|||||||||
|
|
|||||||||
Sales Volumes | mboe/d |
% operating revenues |
mboe/d |
% operating revenues |
||||||
|
||||||||||
E&P Canada | ||||||||||
|
||||||||||
Crude oil and NGLs | 51.6 | 46 | 43.1 | 40 | ||||||
|
||||||||||
Natural gas | 2.7 | 0 | 3.0 | 1 | ||||||
|
||||||||||
E&P International | ||||||||||
|
||||||||||
Crude oil and NGLs | 63.5 | 53 | 63.0 | 59 | ||||||
|
||||||||||
Natural gas | 1.5 | 1 | 1.5 | 0 | ||||||
|
||||||||||
Total Exploration and Production | ||||||||||
|
||||||||||
Crude oil and NGLs | 115.1 | 99 | 106.1 | 99 | ||||||
|
||||||||||
Natural gas | 4.2 | 1 | 4.5 | 1 | ||||||
|
Distribution of Products
Royalties
East Coast Canada
Terra Nova has reached the net royalty stage, consisting of a two tier profit-sensitive royalty. Tier one is the greater of 10% of gross revenue or 30% of net revenue (gross revenue adjusted for eligible costs). Tier two is an additional 12.5% of net revenue. During 2016, Terra Nova royalties averaged 23% of gross revenue (2015 20% of gross revenue).
Hibernia production from the original oilfields and the AA Block has reached the net royalty stage, consisting of a two tier profit-sensitive royalty and an additional net profits interest (NPI) of 10% of net revenue. Tier one is the greater of 5% of gross revenue or 30% of net revenue. Tier two is an additional 12.5% of net revenue; however, this has not yet been triggered.
The HSEU royalty structure is similar to the Hibernia arrangement, but is subject to an additional tier three royalty that ranges between 2.5% and 7.5% of net revenue, depending on the price of WTI. The HSEU tier three royalty will coincide with the triggering of the tier one royalty; however, the HSEU is currently still in the basic royalty stage and subject to a royalty of 5% of gross revenue. For the portion of the HSEU that is contained within the original Hibernia licence area, the tier three royalty will range between 7.5% and 12.5% of net revenue, depending on the price of WTI.
During 2016, Hibernia (including the HSEU) royalties and NPI combined to average 19% of gross revenue (2015 25% of gross revenue).
The White Rose base project has reached the net royalty stage, consisting of a two tier profit-sensitive royalty. Tier one is the greater of 7.5% of gross revenue or 20% of net revenue. Tier two is an additional 10% of net revenue. The White Rose Extension tier one and two royalty structures are the same as the base project, and there is an additional tier three royalty of 6.5% of net revenue, payable if WTI is greater than US$50/bbl. The White Rose Extension is currently paying tier one and tier three royalties, but has not yet triggered tier two. During 2016, total White Rose
20 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
royalties averaged 10% of gross revenue (2015 11% of gross revenue).
The Hebron royalty consists of an initial sliding-scale basic royalty, followed by a three-tiered royalty which will become payable upon the achievement of specified levels of profitability. The basic royalty will start at 1% and increase to 7.5% of gross revenue depending on certain milestones. The tier one royalty is equal to 20% of net revenue. The tier two royalty is equal to an additional 10% of net revenue. The tier three royalty is equal to 6.5% of net revenue, payable if WTI is greater than US$50/bbl.
E&P International
There are no royalties on oil and gas production from the North Sea; however, in the U.K., oil and gas profits are subject to a 40% income tax rate. During 2016, the U.K. government enacted a decrease in the supplementary charge rate on oil and gas profits in the North Sea that reduced the statutory tax rate on Suncor's earnings in the U.K. from 50% to 40%. In addition, oil and gas profits in Norway are subject to a 78% income tax rate. For operations in Libya, all government interests, except for income taxes, are presented as royalties.
Refining and Marketing
Refining and Supply Assets and Operations
Eastern North America
Montreal Refinery
The Montreal refinery has a crude oil capacity of 137 mbbls/d, processing primarily conventional crude oil, with a flexible configuration that allows processing of light, sour and heavy grades of crude oil, as well as intermediate feedstock. Crude oil is procured at market prices on a spot basis or under contracts that can be terminated on short notice. Crude oil for the refinery can be supplied through several channels, including via Enbridge's Line 9, the Portland-Montreal Pipeline, by marine transportation, and by rail for inland crudes. The Montreal refinery received inland-sourced crude volumes averaging 103.3 mbbls/d in 2016.
Production from the Montreal refinery includes gasoline, distillate, heavy fuel oil, solvents, asphalt and petrochemicals, which are distributed primarily across Quebec and Ontario. The Montreal refinery also continues to produce feedstock sold under a long-term supply contract following the completion of the sale of Suncor's Mississauga lubricants facility in early 2017. Refined products are delivered to distribution terminals in Ontario via the Trans-Northern Pipeline and delivered to customers directly by truck, rail and marine vessel.
Sarnia Refinery
The Sarnia refinery has a crude oil capacity of 85 mbbls/d, processing both SCO from the company's Oil Sands operations and conventional crude oil purchased from third parties on a spot basis or under contracts that can be terminated on short notice. Crude oil is supplied to the Sarnia refinery primarily via the Enbridge mainline and Lakehead pipeline systems. Suncor procures conventional crude oil feedstock primarily from Western Canada and has the ability to supplement supply with purchases from the U.S.
Production yield from the Sarnia refinery includes gasoline, kerosene, and jet and diesel fuels, which are primarily distributed in Ontario. Refined products are delivered to distribution terminals in Ontario via the Sun-Canadian Pipeline, or delivered to customers directly via marine vessel and rail. The Sarnia refinery also has limited access to pipelines delivering refined products into the U.S.
To meet the demands of Suncor's marketing network in Eastern North America, the company also purchases gasoline and distillate from other refiners. Suncor enters into reciprocal exchange arrangements with other refiners in Eastern North America, primarily for gasoline and distillate, as a means of minimizing transportation costs and balancing product availability. Specialty products, such as asphalt and petrochemicals, are also exported to customers in the U.S.
Other Facilities
Suncor holds a 51% interest in ParaChem Chemicals L.P. (ParaChem), which owns and operates a petrochemicals plant located adjacent to the Montreal refinery. Feedstock for the plant includes xylene and toluene produced by the Montreal and Sarnia refineries. The plant primarily produces paraxylene, which is used by customers to manufacture polyester textiles and plastic bottles. Paraxylene production was approximately 351,000 metric tonnes in 2016 (2015 321,000 metric tonnes). ParaChem also produces benzene, hydrogen and heavy aromatics. Benzene production is delivered back to the Montreal refinery to be marketed with production from that facility.
Suncor operates Canada's largest ethanol facility, the St. Clair Ethanol plant in the Sarnia-Lambton region of Ontario, with a nameplate capacity of 396 million litres per year. In 2016, the plant produced 414 million litres of ethanol (2015 418 million litres).
Suncor closed the sale of its lubricants business to HollyFrontier on February 1, 2017 for gross proceeds of $1.125 billion, subject to customary post-closing adjustments. The lubricants plant produced specialty lubricants and waxes marketed in Canada and internationally. In 2016, the plant produced approximately 792 million litres of lubricant base stocks. Feedstock for the
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 21
lubricants facility came from Suncor's Montreal refinery and other purchase contracts.
Western North America
Edmonton Refinery
The Edmonton refinery has a crude oil capacity of 142 mbbls/d and has the capability to run a full slate of feedstock sourced from Suncor's oil sands operations. Crude oil is supplied to the refinery via company-owned and third-party pipelines.
Feedstock is supplied from Suncor's Oil Sands operations, Syncrude operations (including volumes purchased by Suncor from other co-owners' share of production) and other producers from the Wood Buffalo and Cold Lake regions of Alberta. The refinery can process approximately 41 mbbls/d of blended feedstock (comprised of 29 mbbls/d of bitumen and 12 mbbls/d of diluent) and process approximately 44 mbbls/d of sour SCO. The refinery can also process approximately 57 mbbls/d of sweet SCO through its synthetic train.
Production yield from the Edmonton refinery includes primarily gasoline, distillate and other light oils, which are delivered to distribution terminals across Western Canada via the Alberta Products Pipeline, the TransMountain Pipeline and the Enbridge pipeline system, as well as via truck and rail.
Commerce City Refinery
The Commerce City refinery has a crude throughput capacity of 98 mbbls/d. The refinery processes primarily conventional crude oil, and has processed up to 16 mbbls/d of sour SCO and diluted bitumen from Suncor's Oil Sands operations. A majority of crude feedstock is supplied from sources in the U.S., including the Rocky Mountain region, while the remainder is purchased from Canadian sources. Crude oil purchase contracts have terms ranging from month-to-month to multi-year. Approximately 61% of crude oil supplied to the refinery is transported via pipeline, with the remainder transported via truck.
Production yield from the Commerce City refinery includes primarily gasoline, distillate and paving-grade asphalt. The majority of the refined products are sold to commercial and wholesale customers in Colorado and Wyoming, and a retail network in Colorado. Refined products are distributed by truck, rail and pipeline.
Other Facilities
To support the supply and demand balance in the Vancouver area, Suncor imports and exports finished products through its Burrard distribution terminal located on the west coast of B.C. Suncor also enters into reciprocal exchange arrangements with other refiners in Western North America as a means of minimizing transportation costs and balancing product availability.
22 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Refinery Throughputs, Utilizations and Yields
The following tables summarize the crude feedstock, utilizations and production yield mix for Suncor's refineries for the years ended December 31, 2016 and 2015.
Average Daily Crude Throughput |
Montreal |
Sarnia |
Edmonton |
Commerce City |
|||||||||||||
(mbbls/d, except as noted) | 2016 | 2015(1) | 2016 | 2015(1) | 2016 | 2015(1) | 2016 | 2015(1) | |||||||||
|
|||||||||||||||||
Sweet synthetic | 5.8 | 0.3 | 25.0 | 30.1 | 45.1 | 61.0 | | 0.6 | |||||||||
|
|||||||||||||||||
Sour synthetic | | | 26.5 | 31.2 | 44.6 | 33.3 | 9.2 | 10.0 | |||||||||
|
|||||||||||||||||
Diluted bitumen | 25.0 | 16.4 | | | 40.1 | 28.6 | 9.1 | 11.2 | |||||||||
|
|||||||||||||||||
Sweet conventional | 89.1 | 110.2 | 0.3 | 9.0 | 0.5 | | 64.9 | 64.3 | |||||||||
|
|||||||||||||||||
Sour conventional | 7.7 | 0.4 | 23.5 | 10.3 | 1.3 | | 10.4 | 12.0 | |||||||||
|
|||||||||||||||||
Heavy conventional | | 0.1 | | | | | | | |||||||||
|
|||||||||||||||||
Total | 127.6 | 127.4 | 75.3 | 80.6 | 131.6 | 122.9 | 93.6 | 98.1 | |||||||||
|
|||||||||||||||||
Utilization(2) (%) | 93 | 93 | 89 | 95 | 93 | 87 | 95 | 100 | |||||||||
|
|||||||||||||||||
Equity Crude Processed(3) | 10.5 | 14.1 | 36.4 | 46.5 | 108.2 | 95.4 | 9.16 | 11.2 | |||||||||
|
Refined petroleum production yield mix |
Montreal |
Sarnia |
Edmonton |
Commerce City |
|||||||||||||
(%) | 2016 | 2015 | 2016 | 2015 | 2016 | 2015 | 2016 | 2015 | |||||||||
|
|||||||||||||||||
Gasoline | 39 | 42 | 51 | 48 | 46 | 48 | 50 | 48 | |||||||||
|
|||||||||||||||||
Distillates | 34 | 36 | 37 | 38 | 50 | 48 | 34 | 35 | |||||||||
|
|||||||||||||||||
Other | 27 | 22 | 12 | 14 | 4 | 4 | 17 | 17 | |||||||||
|
Distribution Terminals and Pipelines
Suncor owns and operates 13 major refined product terminals across Canada (including terminals adjacent to refineries) and two product terminals in Colorado. Combined with access to facilities under long-term contractual arrangements with other parties, Suncor's North American assets are sufficient to meet the Refining and Marketing segment's current storage and distribution needs.
Suncor has ownership interests in certain pipelines, including the following:
Pipeline | Ownership | Type | Origin | Destinations | |||||
|
|||||||||
Portland-Montreal Pipeline | 23.8% | Crude oil | Portland, Maine | Montreal, Quebec | |||||
|
|||||||||
Trans-Northern Pipeline | 33.3% | Refined product | Montreal, Quebec | Ontario Ottawa, Toronto & Oakville | |||||
|
|||||||||
Sun-Canadian Pipeline | 55.0% | Refined product | Sarnia, Ontario | Ontario Toronto, London & Hamilton | |||||
|
|||||||||
Alberta Products Pipeline | 35.0% | Refined product | Edmonton, Alberta | Calgary, Alberta | |||||
|
|||||||||
Rocky Mountain Crude Pipeline | 100.0% | Crude oil | Guernsey, Wyoming | Denver, Colorado | |||||
|
|||||||||
Centennial Pipeline | 100.0% | Crude oil | Guernsey, Wyoming | Cheyenne, Wyoming | |||||
|
Marketing Assets and Operations
Suncor's retail service station network operates nationally in Canada primarily under the Petro-CanadaTM brand. As at December 31, 2016, this network consisted of 1,493 outlets across Canada. In addition, refined products are marketed through independent dealers and joint operations. Suncor's Canadian retail network had sales of gasoline motor fuels averaging approximately 4.9 million litres per site in 2016 (2015 4.8 million litres) and
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 23
attracted an estimated 17.2% share (2015 17.8%) of the national urban retail market.
Suncor's Colorado retail network consists of 44 owned outlets branded Shell®, Exxon® and Mobil®, and product supply agreements with a larger network of Shell®-branded sites. Marketing activities also generate non-petroleum revenues from convenience store sales and car washes.
Suncor's wholesale operations sell refined products into farm, home heating, paving, small industrial, commercial and truck markets. Through its PETRO-PASSTM network, Suncor is a national marketer to the commercial road transport segment in Canada. Suncor also sells refined products directly to large industrial and commercial customers and independent marketers.
Retail Summary:
As at December 31 |
||||||
Locations | 2016 | 2015 | ||||
|
||||||
Retail Service Stations Canada | ||||||
|
||||||
Petro-CanadaTM-branded | 1 492 | 1 484 | ||||
|
||||||
SunocoTM-branded | 1 | 1 | ||||
|
||||||
1 493 | 1 485 | |||||
|
||||||
Retail Service Stations Colorado | ||||||
|
||||||
Shell®-branded retail service stations | 35 | 38 | ||||
|
||||||
Exxon®-branded retail service stations | 7 | 5 | ||||
|
||||||
Mobil®-branded retail service stations | 2 | 1 | ||||
|
||||||
44 | 44 | |||||
|
||||||
Wholesale Cardlock Sites Canada | ||||||
|
||||||
Petro-CanadaTM-branded cardlock sites (PETRO-PASSTM) | 282 | 280 | ||||
|
2016 |
2015 |
|||||||||
|
|
|||||||||
Sales Volumes | mbbls/d |
% operating revenues |
mbbls/d |
% operating revenues |
||||||
|
||||||||||
Gasoline (includes motor and aviation gasoline) | ||||||||||
|
||||||||||
Eastern North America | 115.2 | 118.9 | ||||||||
|
||||||||||
Western North America | 129.1 | 127.3 | ||||||||
|
||||||||||
244.3 | 47 | 246.2 | 47 | |||||||
|
||||||||||
Distillates (includes diesel and heating oils, and aviation jet fuels) | ||||||||||
|
||||||||||
Eastern North America | 76.3 | 91.1 | ||||||||
|
||||||||||
Western North America | 109.8 | 106.9 | ||||||||
|
||||||||||
186.1 | 36 | 198.0 | 38 | |||||||
|
||||||||||
Other (includes heavy fuel oil, asphalts, lubricants, petrochemicals, other) | ||||||||||
|
||||||||||
Eastern North America | 61.8 | 52.8 | ||||||||
|
||||||||||
Western North America | 29.2 | 26.3 | ||||||||
|
||||||||||
91.0 | 17 | 79.1 | 15 | |||||||
|
||||||||||
521.4 | 523.3 | |||||||||
|
Sales volumes for specific products are moderately affected by seasonal cycles: gasoline sales are typically higher during the summer driving season; heating oil sales are typically higher during the winter season; diesel sales are typically higher during the drilling season at the beginning of the year in Western Canada, and during agricultural planting
24 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
and harvest seasons in early spring and late summer, respectively; asphalt sales are typically higher during the summer construction paving period. Suncor has the flexibility to modify refinery inputs and outputs to match production yields with anticipated product demands.
Sales volumes can also be impacted when refineries undergo maintenance events, which reduce production. Suncor is able to partially mitigate this impact through its integrated facilities: the Edmonton refinery and Oil Sands Base upgrading facilities, and the Sarnia and Montreal refineries. In addition, Suncor may purchase refined products from third-party suppliers.
Other Suncor Businesses
Energy Trading
Suncor's Energy Trading business is organized around five main commodity groups crude oil, natural gas, sulphur, petroleum coke and electricity and has trading offices in Canada, the U.K. and the U.S. Energy Trading provides commodity supply, transportation and storage and optimizes price realizations for Suncor's products. The company's customers include mid-to large-sized commercial and industrial consumers, utility companies and energy producers.
The Energy Trading business supports the company's Oil Sands and E&P production by optimizing price realizations, managing inventory levels and managing the impacts of external market factors, such as pipeline disruptions or outages at refining customers. The Energy Trading business has entered into arrangements for other midstream infrastructure, such as pipeline, storage capacity and rail access, to optimize delivery of existing and future growth production, while generating trading earnings on select strategies and opportunities.
The Energy Trading business supports the company's Refining and Marketing business by optimizing the supply of crude and NGLs feedstock to the four refineries, managing crude inventory levels during refinery turnarounds and periods of unplanned maintenance as well as managing external impacts from pipeline disruptions. The business provides reliable natural gas supply to Suncor's upstream and downstream operations and generates incremental revenue through trading and asset optimization.
Renewable Energy
Suncor's renewable energy investment activities include development, construction and ownership of Suncor-operated and joint venture partner-operated renewable power assets across Canada. This includes a portfolio of five operating wind power facilities located in Alberta, Saskatchewan and Ontario, as well as a portfolio of optioned lands for future wind and solar power project development. The five wind power projects in operation have a gross generating capacity of 187 MW.
The company has commenced a sale process for certain assets within the Renewable Energy business. Total gross generating capacity has decreased by 100 MW due to the sale of the Cedar Point Wind Power Project, which closed on January 24, 2017.
Suncor's wind power projects:
Wind Power Projects |
Ownership Interest (%) |
Gross (MW) | Turbines | Completed | ||||||||
|
||||||||||||
Operated by Suncor | ||||||||||||
|
||||||||||||
Adelaide | Strathroy, Ontario | 75.0 | 40 | 18 | 2014 | |||||||
|
||||||||||||
Non-operated | ||||||||||||
|
||||||||||||
Ripley | Ripley, Ontario | 50.0 | 76 | 38 | 2007 | |||||||
|
||||||||||||
Chin Chute | Taber, Alberta | 33.3 | 30 | 20 | 2006 | |||||||
|
||||||||||||
Magrath | Magrath, Alberta | 33.3 | 30 | 20 | 2004 | |||||||
|
||||||||||||
SunBridge | Gull Lake, Saskatchewan | 50.0 | 11 | 17 | 2002 | |||||||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 25
SUNCOR EMPLOYEES
The following table shows the distribution of employees among Suncor's business units and corporate office.
As of December 31 | 2016 | 2015 | |||
|
|||||
Oil Sands(1) | 6 006 | 6 008 | |||
|
|||||
Exploration and Production | 339 | 360 | |||
|
|||||
Refining and Marketing | 3 401 | 3 437 | |||
|
|||||
Corporate, Energy Trading and Renewable Energy(2) | 3 091 | 3 385 | |||
|
|||||
Total | 12 837 | 13 190 | |||
|
In addition to Suncor's employees, the company also uses independent contractors to supply a range of services.
Approximately 34% of the company's employees were covered by collective agreements at the end of 2016. The majority of the collective agreements, covering 3,717 employees represented by Unifor at various locations, were renewed in 2016. Negotiations are in progress with Unifor at the Montreal refinery and Terra Nova. Collective agreements with the Sunoco Employees' Bargaining Association, representing approximately 206 employees at the Sarnia refinery, and the Teamsters Union, representing 40 employees in B.C. terminals, will expire in 2017.
26 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
ETHICS, SOCIAL AND ENVIRONMENTAL POLICIES
Suncor has adopted several policies focused on ethics, social and environmental matters.
Suncor's standards for the ethical conduct of our business are set forth in a Standards of Business Conduct Code (the Code), which applies to Suncor's directors, officers, employees and contract workers, and requires strict compliance with legal requirements. Topics addressed in the Code include competition, conflict of interest, the protection and proper use of corporate assets, and opportunities, confidentiality, disclosure of material information, trading in shares and securities, communications to the public, improper payments, harassment, fair dealing in trade relations, and accounting, reporting and business controls. The Code is supported by detailed policy guidance and standards and a Code compliance program, under which every Suncor director, officer, employee and contract worker is required to annually complete a Code training course, read a summary of the Code, affirm that he or she understands the requirements of the Code, and provide confirmation of compliance with the Code since his or her last affirmation or confirmation that any instance of non-compliance has been discussed and resolved with the individual's supervisor. Compliance is then reported to Suncor's Governance Committee. A copy of the Code is available on Suncor's website at www.suncor.com.
Suncor has a Human Rights Policy, which affirms Suncor's responsibility to respect human rights and ensures that Suncor is not complicit in human rights abuses. Suncor is subject to the laws of the countries in which it operates and is committed to complying with all such laws while honouring international human rights principles, such as those described in the Universal Declaration of Human Rights. The policy contains guiding principles such as human rights due diligence, respecting the cultures, customs and values of our employees and the communities where we operate, security policies that are consistent with international human rights standards and access to dispute resolution mechanisms. The policy makes clear that the scope of Suncor's human rights due diligence includes its own operations and, where we can influence our third-party business relationships, the operations of others.
Suncor has a Stakeholder Relations Policy, which reflects Suncor's values. The policy provides that Suncor is committed to developing and maintaining positive, meaningful relationships with stakeholders in all of its operating areas and provides Suncor's principles for guiding the development of stakeholder relations (respect, responsibility, transparency, timeliness and mutual benefit). The policy states that successful stakeholder engagement guides informed decision-making, resolving issues with timely, cost-effective and mutually beneficial solutions, building stronger communities and supporting shared learning.
Suncor has a Canadian Aboriginal Relations Policy, which affirms Suncor's desire to work in collaboration with Aboriginal Peoples to develop a thriving energy industry that allows Aboriginal communities to be vibrant, diversified and sustainable. The policy provides a consistent approach to the company's relationships with Aboriginal Peoples and outlines Suncor's responsibilities and commitments, and is intended to guide Suncor's business decisions on a day-to-day basis. Suncor is committed to working closely with Aboriginal Peoples and communities to build and maintain effective, long-term and mutually beneficial relationships. The policy makes it clear that responsible development takes into account Aboriginal interests regarding the opportunities and impacts of energy development on communities and on their traditional and current uses of lands and resources.
Suncor has an Environment, Health and Safety (EH&S) policy, which affirms Suncor's commitment to be a sustainable energy company by working to achieve or exceed levels of performance governed by legislation and by the evolving environmental, social and economic expectations of our stakeholders. The policy reflects Suncor's belief that our EH&S efforts are complementary and interdependent with our economic and social performance. The policy states that Suncor management is responsible for ensuring that employees and contractors under their direction are competent to manage their EH&S responsibilities and are knowledgeable of the hazards and risks associated with their jobs, and that all Suncor employees and contractors are accountable for compliance with relevant acts, codes, regulations, standards and procedures, and for their own personal safety and the safety of their co-workers.
The Environment, Health, Safety and Sustainable Development Committee of the Board of Directors meets quarterly to review Suncor's effectiveness in meeting its EH&S obligations. The committee also reviews the effectiveness with which Suncor establishes appropriate EH&S policies, including environmental performance, given legal, industry and community standards. Management systems are overseen by this committee to implement such policies and ensure compliance.
Suncor's annual President's Operational Excellence Awards support and highlight the goals of the EH&S policy by honouring employees and contractors who demonstrate an exceptional commitment to environment, health and safety performance. The awards ceremony highlights progress on safety initiatives and provides educational opportunities for all employees.
The aforementioned policies are reviewed regularly, and are accessible to employees and contractors on the company's intranet. Additional workshops and training sessions on various matters under the policies are also conducted as warranted throughout the year. Information regarding the policies is provided for employees primarily though feature articles on the company's intranet. The Aboriginal Relations Policy also has Cree and Dene audio translations. Training on that policy is also provided for employees and contract workers whose roles require interaction with Aboriginal communities.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 27
STATEMENT OF RESERVES DATA AND OTHER OIL AND GAS INFORMATION
Date of Statement
The Statement of Reserves Data and Other Oil and Gas Information outlined below is dated March 1, 2017, with an effective date of December 31, 2016. Reserves evaluations have not been updated since the effective date and, thus, do not reflect changes in our reserves since that date. The preparation date of the information is February 24, 2017.
Disclosure of Reserves Data
Suncor is subject to the reporting requirements of Canadian securities regulatory authorities, including the reporting of reserves data in accordance with National Instrument 51-101 Standards of Disclosure for Oil and Gas Activities (NI 51-101).
The reserves data included in this section of the AIF for Suncor's Mining and In Situ operations is based upon evaluations conducted by GLJ Petroleum Consultants Ltd. (GLJ), contained in their reports (the GLJ Reports). The reserves data set forth below for all other reserves, which includes Suncor's interests in its conventional assets offshore Newfoundland and Labrador and its natural gas assets located in Western Canada (collectively, E&P Canada), and conventional assets offshore the U.K. and Norway (North Sea), is based upon evaluations conducted by Sproule Associates Limited or Sproule International Limited (collectively, Sproule), contained in their reports (the Sproule Reports). Each of GLJ and Sproule (collectively, the Evaluators) are independent qualified reserves evaluators as defined in NI 51-101.
The reserves data summarizes Suncor's SCO, bitumen, light crude oil and medium crude oil (combined), heavy crude oil, conventional natural gas (including immaterial amounts of NGLs) reserves and the net present values of future net revenues for these reserves using forecast prices and costs prior to provision for interest and general and administrative expense.
Advisories Future Net Revenues
It should not be assumed that the estimates of future net revenues presented in the tables below represent the fair market value of the reserves. There is no assurance that the forecast prices and cost assumptions will be attained and variances could be material. There is no guarantee that the estimates for SCO, bitumen, light crude oil and medium crude oil, heavy crude oil, conventional natural gas and NGLs reserves provided herein will be recovered. Actual SCO, bitumen, light crude oil and medium crude oil, heavy crude oil, conventional natural gas and NGLs volumes recovered may be greater than or less than the estimates provided herein. Readers should review the Glossary of Terms and Abbreviations and the definitions and information contained in the Notes to Reserves Data Tables, Definitions for Reserves Data Tables and Notes to Future Net Revenues Tables in conjunction with the following notes and tables.
Significant Risk Factors and Uncertainties Affecting Reserves
The evaluation of reserves is a continuous process, one that can be significantly impacted by a variety of internal and external influences. Revisions are often required as a result of newly acquired technical data, technology improvements, or changes in historical performance, pricing, economic conditions, market availability, or regulatory requirements. Additional technical information regarding geology, hydro geology, reservoir properties and reservoir fluid properties is obtained through seismic programs, drilling programs, updated reservoir performance studies and analysis, and production history, and may result in revisions to reserves. Pricing, market availability and economic conditions affect the profitability of reserves development. Royalty regimes and environmental regulations and other regulatory changes cannot be predicted but may have positive or negative effects on reserves. Future technology improvements would be expected to have a favourable impact on the economics of reserves development and exploitation, and therefore may result in an increase to reserves. Political unrest, such as occurring in Syria and Libya, has resulted in unfavourable changes to reserves being reclassified to resources.
While the above factors, and many others, are relevant, certain judgments and assumptions are always required. As new information becomes available, these areas are reviewed and revised accordingly.
The reserves included in this AIF represent estimates only. There are numerous uncertainties inherent in estimating quantities and quality of these reserves, including many factors beyond our control. In general, estimates of reserves and the future net cash flows from these reserves are based upon a number of variable factors and assumptions, such as production forecasts, regulations, pricing, the timing and amount of capital expenditures, future royalties, future operating costs, future abandonment and reclamation costs, and yield rates for upgraded production of synthetic crude oil from bitumen all of which may vary considerably from actual results and may be affected by many of the factors identified under Industry Conditions and Risk Factors herein. The accuracy of any reserves estimate is a matter of interpretation and judgment and is a function of the quality and quantity of available data, which may have been gathered over time. For these reasons, estimates of the reserves and categorization of such reserves based on the certainty of recovery, prepared by different engineers or by the same engineers at different times, may vary.
28 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Reserves estimates are based upon geological assessment, including drilling and laboratory tests. Mining reserves estimates also consider production capacity and upgrading yields, mine plans, operating life and regulatory constraints. In Situ reserves estimates are also based upon the testing of core samples and seismic operations and demonstrated commercial success of in situ processes. Our actual production, revenues, royalties, taxes, and development and operating expenditures with respect to our reserves will vary from such estimates, and such variances could be material. Production performance subsequent to the date of the estimate may justify revision, either upward or downward, if material.
The reserves evaluations are based in part on the assumed success of activities we intend to undertake in future years. The reserves and estimated cash flow to be derived from the reserves contained in the reserves evaluations may be increased or reduced to the extent that such activities do or do not achieve the level of success assumed in the reserves evaluations.
Specific significant risk factors and uncertainties affecting Suncor's reserves include, amongst others:
Commodity pricing affects the profitability of reserves development. For example, higher commodity prices may result in higher reserves by making more projects economically viable or extending their economic life, while lower commodity prices may conversely result in lower reserves (however, this is generally not the case for assets under PSCs, as described in the Notes to Reserves Data Tables in relation to the economic interest method used to determine entitlement reserves). World oil prices have declined significantly in recent years. Low prices could have a material adverse effect on Suncor's reserves. Refer to the Risk Factors Volatility of Commodity Prices section of this AIF.
Suncor operates in jurisdictions that have regulated, or have proposed to regulate industrial GHG emissions, including the laws enacted by the Government of Alberta impacting Suncor's current and future Oil Sands assets, the details of which are set forth in the Industry Conditions Environmental Regulation Climate Change section of this AIF. Such laws could impose significant compliance costs on Suncor, which could potentially impact the economic viability of certain projects recorded as reserves, or could necessitate the development of new technologies in order to comply, the absence of which could impact future development. Refer to the Risk Factors Carbon Risk section of this AIF.
As a result of political instability in Syria, Suncor reclassified all Syria reserves to contingent resources effective December 31, 2012. All Syria volumes remain classified as contingent resources as at December 31, 2016. Suncor has also reclassified all Libya reserves to contingent resources effective December 31, 2016 due to the ongoing political instability and uncertainty in Libya. The criteria for the reclassification of the aforementioned volumes back to reserves include sustained periods of political stability, operational and production stability, and normalization of business relations including financial transactions. Refer to the Risk Factors Foreign Operations section of this AIF.
Refer to the Additional Information Relating to Reserves Data Abandonment and Reclamation Costs section below.
Refer to the Risk Factors section of this AIF for additional information on significant risk factors and uncertainties affecting Suncor's reserves.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 29
Oil and Gas Reserves Tables and Notes
Summary of Oil and Gas Reserves(1)
as at December 31, 2016
(forecast prices and costs)(2)
SCO(3) |
Bitumen |
Light Crude & Medium Crude Oil(4) |
Conventional Natural Gas(5) |
Total |
||||||||||||||||||
(mmbbls) |
(mmbbls) |
(mmbbls) |
(bcfe) |
(mmboe) |
||||||||||||||||||
Gross |
Net |
Gross |
Net |
Gross |
Net |
Gross |
Net |
Gross |
Net |
|||||||||||||
|
||||||||||||||||||||||
Proved Developed Producing | ||||||||||||||||||||||
Mining | 2 317 | 2 073 | | | | | | | 2 317 | 2 073 | ||||||||||||
In Situ | 153 | 147 | 117 | 107 | | | | | 270 | 254 | ||||||||||||
E&P Canada | | | | | 57 | 44 | 26 | 23 | 61 | 47 | ||||||||||||
|
||||||||||||||||||||||
Total Canada | 2 470 | 2 220 | 117 | 107 | 57 | 44 | 26 | 23 | 2 648 | 2 375 | ||||||||||||
|
||||||||||||||||||||||
North Sea | | | | | 69 | 69 | 4 | 4 | 69 | 69 | ||||||||||||
|
||||||||||||||||||||||
Total Proved Developed Producing | 2 470 | 2 220 | 117 | 107 | 125 | 112 | 29 | 26 | 2 717 | 2 444 | ||||||||||||
|
||||||||||||||||||||||
Proved Developed Non-Producing | ||||||||||||||||||||||
Mining | | | | | | | | | | | ||||||||||||
In Situ | 17 | 14 | 14 | 14 | | | | | 32 | 28 | ||||||||||||
E&P Canada | | | | | | | 2 | 1 | | | ||||||||||||
|
||||||||||||||||||||||
Total Canada | 17 | 14 | 14 | 14 | | | 2 | 1 | 32 | 28 | ||||||||||||
|
||||||||||||||||||||||
North Sea | | | | | | | | | | | ||||||||||||
|
||||||||||||||||||||||
Total Proved Developed Non-Producing | 17 | 14 | 14 | 14 | | | 2 | 1 | 32 | 28 | ||||||||||||
|
||||||||||||||||||||||
Proved Undeveloped | ||||||||||||||||||||||
Mining | | | 879 | 812 | | | | | 879 | 812 | ||||||||||||
In Situ | 576 | 493 | 694 | 589 | | | | | 1 269 | 1 081 | ||||||||||||
E&P Canada | | | | | 47 | 44 | | | 47 | 44 | ||||||||||||
|
||||||||||||||||||||||
Total Canada | 576 | 493 | 1 573 | 1 401 | 47 | 44 | | | 2 195 | 1 938 | ||||||||||||
|
||||||||||||||||||||||
North Sea | | | | | | | | | | | ||||||||||||
|
||||||||||||||||||||||
Total Proved Undeveloped | 576 | 493 | 1 573 | 1 401 | 47 | 44 | | | 2 195 | 1 938 | ||||||||||||
|
||||||||||||||||||||||
Proved | ||||||||||||||||||||||
Mining | 2 317 | 2 073 | 879 | 812 | | | | | 3 196 | 2 886 | ||||||||||||
In Situ | 746 | 653 | 825 | 710 | | | | | 1 571 | 1 363 | ||||||||||||
E&P Canada | | | | | 104 | 88 | 27 | 24 | 108 | 92 | ||||||||||||
|
||||||||||||||||||||||
Total Canada | 3 063 | 2 727 | 1 704 | 1 522 | 104 | 88 | 27 | 24 | 4 875 | 4 341 | ||||||||||||
|
||||||||||||||||||||||
North Sea | | | | | 69 | 69 | 4 | 4 | 69 | 69 | ||||||||||||
|
||||||||||||||||||||||
Total Proved | 3 063 | 2 727 | 1 704 | 1 522 | 172 | 156 | 31 | 28 | 4 944 | 4 410 | ||||||||||||
|
||||||||||||||||||||||
Probable | ||||||||||||||||||||||
Mining | 617 | 542 | 577 | 491 | | | | | 1 194 | 1 034 | ||||||||||||
In Situ | 1 169 | 945 | 410 | 311 | | | | | 1 579 | 1 256 | ||||||||||||
E&P Canada | | | | | 206 | 169 | 8 | 7 | 208 | 170 | ||||||||||||
|
||||||||||||||||||||||
Total Canada | 1 786 | 1 487 | 987 | 803 | 206 | 169 | 8 | 7 | 2 981 | 2 460 | ||||||||||||
|
||||||||||||||||||||||
North Sea | | | | | 32 | 32 | 4 | 4 | 33 | 33 | ||||||||||||
|
||||||||||||||||||||||
Total Probable | 1 786 | 1 487 | 987 | 803 | 238 | 201 | 12 | 11 | 3 014 | 2 493 | ||||||||||||
|
||||||||||||||||||||||
Proved Plus Probable | ||||||||||||||||||||||
Mining | 2 934 | 2 615 | 1 455 | 1 304 | | | | | 4 389 | 3 919 | ||||||||||||
In Situ | 1 915 | 1 598 | 1 235 | 1 021 | | | | | 3 150 | 2 620 | ||||||||||||
E&P Canada | | | | | 310 | 257 | 35 | 31 | 316 | 262 | ||||||||||||
|
||||||||||||||||||||||
Total Canada | 4 849 | 4 214 | 2 691 | 2 325 | 310 | 257 | 35 | 31 | 7 855 | 6 801 | ||||||||||||
|
||||||||||||||||||||||
North Sea | | | | | 101 | 101 | 8 | 8 | 102 | 102 | ||||||||||||
|
||||||||||||||||||||||
Total Proved Plus Probable | 4 849 | 4 214 | 2 691 | 2 325 | 411 | 358 | 43 | 39 | 7 957 | 6 903 | ||||||||||||
|
Please see Notes (1) through (5) at the end of the reserves data section for important information about volumes in this table.
30 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Reconciliation of Gross Reserves(1)
as at December 31, 2016
(forecast prices and costs)(2)
SCO(3) |
Bitumen |
Light Crude & Medium Crude Oil(4)(6) |
Conventional Natural Gas(5) |
Total |
|||||||||||||||||||||||||||||
|
|
|
|
|
|||||||||||||||||||||||||||||
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
|||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | bcfe | bcfe | bcfe | mmboe | mmboe | mmboe | |||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Mining | |||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2015 | 1 673 | 494 | 2 167 | 1 052 | 542 | 1 593 | | | | | | | 2 725 | 1 035 | 3 760 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Extensions & Improved Recovery(7) | 5 | 66 | 70 | | | | | | | | | | 5 | 66 | 70 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Technical Revisions(8) | 24 | (268 | ) | (244 | ) | (173 | ) | 35 | (138 | ) | | | | | | | (149 | ) | (233 | ) | (382 | ) | |||||||||||
|
|||||||||||||||||||||||||||||||||
Discoveries(9) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Acquisitions(10) | 731 | 326 | 1 057 | | | | | | | | | | 731 | 326 | 1 057 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Dispositions(11) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Economic Factors(12) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Production(13) | (116 | ) | | (116 | ) | | | | | | | | | | (116 | ) | | (116 | ) | ||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2016 | 2 317 | 617 | 2 934 | 879 | 577 | 1 455 | | | | | | | 3 196 | 1 194 | 4 389 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
In Situ | |||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2015 | 769 | 1 257 | 2 025 | 866 | 305 | 1 170 | | | | | | | 1 634 | 1 561 | 3 196 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Extensions & Improved Recovery(7) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Technical Revisions(8) | 4 | (88 | ) | (84 | ) | 2 | 106 | 107 | | | | | | | 5 | 18 | 23 | ||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Discoveries(9) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Acquisitions(10) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Dispositions(11) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Economic Factors(12) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Production(13) | (26 | ) | | (26 | ) | (42 | ) | | (42 | ) | | | | | | | (69 | ) | | (69 | ) | ||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2016 | 746 | 1 169 | 1 915 | 825 | 410 | 1 235 | | | | | | | 1 571 | 1 579 | 3 150 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
E&P Canada | |||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2015 | | | | | | | 107 | 211 | 318 | 34 | 13 | 47 | 113 | 213 | 326 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Extensions & Improved Recovery(7) | | | | | | | 1 | 7 | 8 | | | | 1 | 7 | 8 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Technical Revisions(8) | | | | | | | 15 | (13 | ) | 2 | | (4 | ) | (3 | ) | 15 | (14 | ) | 1 | ||||||||||||||
|
|||||||||||||||||||||||||||||||||
Discoveries(9) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Acquisitions(10) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Dispositions(11) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Economic Factors(12) | | | | | | | (1 | ) | 1 | | (1 | ) | (1 | ) | (3 | ) | (1 | ) | 1 | | |||||||||||||
|
|||||||||||||||||||||||||||||||||
Production(13) | | | | | | | (18 | ) | | (18 | ) | (6 | ) | | (6 | ) | (19 | ) | | (19 | ) | ||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2016 | | | | | | | 104 | 206 | 310 | 27 | 8 | 35 | 108 | 208 | 316 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Total Canada | |||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2015 | 2 442 | 1 750 | 4 192 | 1 917 | 846 | 2 764 | 107 | 211 | 318 | 34 | 13 | 47 | 4 473 | 2 810 | 7 282 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Extensions & Improved Recovery(7) | 5 | 66 | 70 | | | | 1 | 7 | 8 | | | | 6 | 73 | 78 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Technical Revisions(8) | 28 | (356 | ) | (328 | ) | (171 | ) | 141 | (31 | ) | 15 | (13 | ) | 2 | | (4 | ) | (3 | ) | (129 | ) | (229 | ) | (357 | ) | ||||||||
|
|||||||||||||||||||||||||||||||||
Discoveries(9) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Acquisitions(10) | 731 | 326 | 1 057 | | | | | | | | | | 731 | 326 | 1 057 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Dispositions(11) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Economic Factors(12) | | | | | | | (1 | ) | 1 | | (1 | ) | (1 | ) | (3 | ) | (1 | ) | 1 | | |||||||||||||
|
|||||||||||||||||||||||||||||||||
Production(13) | (143 | ) | | (143 | ) | (42 | ) | | (42 | ) | (18 | ) | | (18 | ) | (6 | ) | | (6 | ) | (204 | ) | | (204 | ) | ||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2016 | 3 063 | 1 786 | 4 849 | 1 704 | 987 | 2 691 | 104 | 206 | 310 | 27 | 8 | 35 | 4 875 | 2 981 | 7 855 | ||||||||||||||||||
|
Please see Notes (1) through (13) at the end of the reserves data section for important information about volumes in this table.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 31
Reconciliation of Gross Reserves(1) (continued)
as at December 31, 2016
(forecast prices and costs)(2)
SCO(3) |
Bitumen |
Light Crude & Medium Crude Oil(4)(6) |
Conventional Natural Gas(5) |
Total |
|||||||||||||||||||||||||||||
|
|
|
|
|
|||||||||||||||||||||||||||||
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
Proved | Probable |
Proved Plus Probable |
|||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | mmbbls | bcfe | bcfe | bcfe | mmboe | mmboe | mmboe | |||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
North Sea | |||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2015 | | | | | | | 67 | 26 | 94 | 4 | 2 | 6 | 68 | 26 | 94 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Extensions & Improved Recovery(7) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Technical Revisions(8) | | | | | | | 24 | (4 | ) | 19 | 4 | (1 | ) | 3 | 24 | (4 | ) | 20 | |||||||||||||||
|
|||||||||||||||||||||||||||||||||
Discoveries(9) | | | | | | | | 10 | 10 | | 3 | 3 | | 11 | 11 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Acquisitions(10) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Dispositions(11) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Economic Factors(12) | | | | | | | | | 1 | | | | | | 1 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Production(13) | | | | | | | (23 | ) | | (23 | ) | (4 | ) | | (4 | ) | (24 | ) | | (24 | ) | ||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2016 | | | | | | | 69 | 32 | 101 | 4 | 4 | 8 | 69 | 33 | 102 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Other International (14) | |||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2015 | | | | | | | 138 | 95 | 233 | | | | 138 | 95 | 233 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Extensions & Improved Recovery(7) | | | | | | | | | | | | | |||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Technical Revisions(8) | | | | | | | (137 | ) | (95 | ) | (232 | ) | | | | (137 | ) | (95 | ) | (232 | ) | ||||||||||||
|
|||||||||||||||||||||||||||||||||
Discoveries(9) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Acquisitions(10) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Dispositions(11) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Economic Factors(12) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Production(13) | | | | | | | (1 | ) | | (1 | ) | | | | (1 | ) | | (1 | ) | ||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2016 | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Total | |||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2015 | 2 442 | 1 750 | 4 192 | 1 917 | 846 | 2 764 | 313 | 332 | 645 | 38 | 15 | 53 | 4 679 | 2 931 | 7 610 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Extensions & Improved Recovery(7) | 5 | 66 | 70 | | | | 1 | 7 | 8 | | | | 6 | 73 | 78 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Technical Revisions(8) | 28 | (356 | ) | (328 | ) | (171 | ) | 141 | (31 | ) | (99 | ) | (112 | ) | (211 | ) | 4 | (5 | ) | | (241 | ) | (328 | ) | (569 | ) | |||||||
|
|||||||||||||||||||||||||||||||||
Discoveries(9) | | | | | | | | 10 | 10 | | 3 | 3 | | 11 | 11 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Acquisitions(10) | 731 | 326 | 1 057 | | | | | | | | | | 731 | 326 | 1 057 | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Dispositions(11) | | | | | | | | | | | | | | | | ||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
Economic Factors(12) | | | | | | | (1 | ) | 1 | 1 | (1 | ) | (1 | ) | (3 | ) | (1 | ) | 1 | | |||||||||||||
|
|||||||||||||||||||||||||||||||||
Production(13) | (143 | ) | | (143 | ) | (42 | ) | | (42 | ) | (43 | ) | | (43 | ) | (10 | ) | | (10 | ) | (229 | ) | | (229 | ) | ||||||||
|
|||||||||||||||||||||||||||||||||
December 31, 2016 | 3 063 | 1 786 | 4 849 | 1 704 | 987 | 2 691 | 172 | 238 | 411 | 31 | 12 | 43 | 4 944 | 3 014 | 7 957 | ||||||||||||||||||
|
Please see Notes (1) through (14) at the end of the reserves data section for important information about volumes in this table.
32 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Notes to Reserves Data Tables
as at December 31, 2016
Definitions for Reserves Data Tables
In the tables set forth above and elsewhere in this AIF, the following definitions and other notes are applicable:
Gross means:
Net means:
Reserves Categories
The reserves estimates presented are based on the definitions and guidelines contained in the Canadian Oil and Gas Evaluation (COGE) Handbook. A summary of those definitions is set forth below.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 33
Reserves are estimated remaining quantities of oil and natural gas and related substances anticipated to be recoverable from known accumulations, as of a given date, based on analyses of drilling, geological, geophysical and engineering data, the use of established technology, and specified economic conditions, which are generally accepted as being reasonable.
Reserves are classified according to the degree of certainty associated with the estimates:
Proved reserves are those reserves that can be estimated with a high degree of certainty to be recoverable. It is likely that the actual remaining quantities recovered will exceed the estimated proved reserves. Proved reserves estimates should target at least a 90% probability that the quantities actually recovered will equal or exceed the estimate.
Probable reserves are those additional reserves that are less certain to be recovered than proved reserves. It is equally likely that the actual remaining quantities recovered will be greater or less than the sum of the estimated proved plus probable reserves. That is, proved plus probable reserves estimates should target at least a 50% probability that the quantities actually recovered will equal or exceed the estimate.
Other criteria that must also be met for the categorization of reserves are provided in the COGE Handbook.
Proved and probable reserves categories may be divided into developed and undeveloped categories:
Developed reserves are those reserves that are expected to be recovered (i) from existing wells and installed facilities or, if facilities have not been installed, that would involve a low expenditure (for example, when compared to the cost of drilling a well) to put the reserves on production, or (ii) through installed extraction equipment and infrastructure that is operational at the time of the reserves estimate, if the extraction is by means not involving a well. The developed category may be subdivided into producing and non-producing.
Undeveloped reserves are those reserves expected to be recovered from known accumulations where a significant expenditure (for example, when compared to the cost of drilling a well) is required to render them capable of production. They must fully meet the requirements of the reserves category (proved or probable) to which they are assigned.
In multi-well pools, it may be appropriate to allocate total pool reserves between the developed and undeveloped categories or to subdivide the developed reserves for the pool between developed producing and developed non-producing. This allocation should be based on the estimator's assessment as to the reserves that will be recovered from specific wells, facilities and completion intervals in the pool and their respective development and production status.
In the economic interest method used for PSCs, Suncor's share of profit revenue plus cost recovery revenue is divided by the associated oil or gas price forecast to determine Suncor's net volume entitlement, or entitlement reserves. The entitlement reserves are then adjusted to include reserves relating to income taxes payable by the national oil company on behalf of Suncor. Under this method, reported reserves will increase as commodity prices decrease (and vice versa).
34 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Future Net Revenues Tables and Notes(1)
Net Present Value of Future Net Revenues Before Income Taxes
as at December 31, 2016
(forecast prices and costs)
(in $ millions, discounted at % per year) |
Unit Value(2) | |||||||||||||
|
|
|||||||||||||
0% | 5% | 10% | 15% | 20% | ($/boe) | |||||||||
|
||||||||||||||
Proved Developed Producing | ||||||||||||||
|
||||||||||||||
Mining | 34 194 | 29 557 | 21 852 | 16 646 | 13 239 | 10.54 | ||||||||
In Situ | 6 415 | 5 946 | 5 478 | 5 052 | 4 676 | 21.57 | ||||||||
E&P Canada | 937 | 1 042 | 1 059 | 1 039 | 1 006 | 22.32 | ||||||||
|
||||||||||||||
Total Canada | 41 546 | 36 545 | 28 389 | 22 738 | 18 921 | 11.95 | ||||||||
|
||||||||||||||
North Sea | 3 131 | 2 933 | 2 729 | 2 539 | 2 367 | 39.49 | ||||||||
|
||||||||||||||
Total Proved Developed Producing | 44 677 | 39 478 | 31 118 | 25 277 | 21 288 | 12.73 | ||||||||
|
||||||||||||||
Proved Developed Non-Producing | ||||||||||||||
|
||||||||||||||
Mining | | | | | | | ||||||||
In Situ | 941 | 786 | 666 | 573 | 498 | 23.79 | ||||||||
E&P Canada | 1 | 1 | 1 | 1 | 1 | 3.61 | ||||||||
|
||||||||||||||
Total Canada | 942 | 787 | 667 | 574 | 499 | 23.61 | ||||||||
|
||||||||||||||
North Sea | | | | | | | ||||||||
|
||||||||||||||
Total Proved Developed Non-Producing | 942 | 787 | 667 | 574 | 499 | 23.61 | ||||||||
|
||||||||||||||
Proved Undeveloped | ||||||||||||||
|
||||||||||||||
Mining | 11 596 | 4 363 | 1 481 | 203 | (419 | ) | 1.82 | |||||||
In Situ | 30 035 | 15 854 | 8 960 | 5 346 | 3 316 | 8.29 | ||||||||
E&P Canada | 1 082 | 784 | 553 | 377 | 244 | 12.51 | ||||||||
|
||||||||||||||
Total Canada | 42 712 | 21 001 | 10 993 | 5 926 | 3 141 | 5.67 | ||||||||
|
||||||||||||||
North Sea | | | | | | | ||||||||
|
||||||||||||||
Total Proved Undeveloped | 42 712 | 21 001 | 10 993 | 5 926 | 3 141 | 5.67 | ||||||||
|
||||||||||||||
Proved | ||||||||||||||
|
||||||||||||||
Mining | 45 790 | 33 920 | 23 332 | 16 850 | 12 820 | 8.09 | ||||||||
In Situ | 37 391 | 22 586 | 15 105 | 10 971 | 8 491 | 11.08 | ||||||||
E&P Canada | 2 020 | 1 828 | 1 613 | 1 417 | 1 250 | 17.55 | ||||||||
|
||||||||||||||
Total Canada | 85 201 | 58 333 | 40 049 | 29 238 | 22 560 | 9.23 | ||||||||
|
||||||||||||||
North Sea | 3 131 | 2 933 | 2 729 | 2 539 | 2 367 | 39.49 | ||||||||
|
||||||||||||||
Total Proved | 88 332 | 61 266 | 42 779 | 31 777 | 24 928 | 9.70 | ||||||||
|
||||||||||||||
Probable | ||||||||||||||
|
||||||||||||||
Mining | 33 060 | 13 549 | 7 163 | 4 451 | 3 080 | 6.93 | ||||||||
In Situ | 67 857 | 19 976 | 8 166 | 4 445 | 2 957 | 6.50 | ||||||||
E&P Canada | 10 365 | 6 593 | 4 452 | 3 182 | 2 377 | 26.17 | ||||||||
|
||||||||||||||
Total Canada | 111 282 | 40 119 | 19 780 | 12 078 | 8 414 | 8.04 | ||||||||
|
||||||||||||||
North Sea | 1 645 | 1 320 | 1 060 | 859 | 706 | 32.23 | ||||||||
|
||||||||||||||
Total Probable | 112 927 | 41 439 | 20 840 | 12 937 | 9 121 | 8.36 | ||||||||
|
||||||||||||||
Proved Plus Probable | ||||||||||||||
|
||||||||||||||
Mining | 78 850 | 47 469 | 30 495 | 21 301 | 15 899 | 7.78 | ||||||||
In Situ | 105 248 | 42 562 | 23 270 | 15 416 | 11 448 | 8.88 | ||||||||
E&P Canada | 12 385 | 8 421 | 6 065 | 4 599 | 3 628 | 23.14 | ||||||||
|
||||||||||||||
Total Canada | 196 483 | 98 452 | 59 830 | 41 316 | 30 975 | 8.80 | ||||||||
|
||||||||||||||
North Sea | 4 776 | 4 253 | 3 789 | 3 398 | 3 074 | 37.15 | ||||||||
|
||||||||||||||
Total Proved Plus Probable | 201 259 | 102 705 | 63 618 | 44 714 | 34 049 | 9.22 | ||||||||
|
Please see the Notes at the end of the Future Net Revenues Tables.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 35
Net Present Value of Future Net Revenues After Income Taxes(1)
as at December 31, 2016
(forecast prices and costs)
(in $ millions, discounted at % per year) |
|||||||||||||
|
|||||||||||||
0% | 5% | 10% | 15% | 20% | |||||||||
|
|||||||||||||
Proved Developed Producing | |||||||||||||
|
|||||||||||||
Mining | 23 852 | 22 946 | 17 348 | 13 408 | 10 802 | ||||||||
In Situ | 4 925 | 4 605 | 4 261 | 3 937 | 3 647 | ||||||||
E&P Canada | 937 | 1 042 | 1 059 | 1 039 | 1 006 | ||||||||
|
|||||||||||||
Total Canada | 29 715 | 28 593 | 22 668 | 18 385 | 15 455 | ||||||||
|
|||||||||||||
North Sea | 1 810 | 1 705 | 1 594 | 1 489 | 1 394 | ||||||||
|
|||||||||||||
Total Proved Developed Producing | 31 524 | 30 298 | 24 262 | 19 874 | 16 850 | ||||||||
|
|||||||||||||
Proved Developed Non-Producing | |||||||||||||
|
|||||||||||||
Mining | | | | | | ||||||||
In Situ | 691 | 574 | 485 | 415 | 360 | ||||||||
E&P Canada | 1 | 1 | 1 | 1 | 1 | ||||||||
|
|||||||||||||
Total Canada | 692 | 575 | 485 | 416 | 361 | ||||||||
|
|||||||||||||
North Sea | | | | | | ||||||||
|
|||||||||||||
Total Proved Developed Non-Producing | 692 | 575 | 485 | 416 | 361 | ||||||||
|
|||||||||||||
Proved Undeveloped | |||||||||||||
|
|||||||||||||
Mining | 9 054 | 3 235 | 946 | (51 | ) | (529 | ) | ||||||
In Situ | 21 513 | 11 142 | 6 143 | 3 550 | 2 110 | ||||||||
E&P Canada | 994 | 725 | 512 | 347 | 222 | ||||||||
|
|||||||||||||
Total Canada | 31 561 | 15 102 | 7 601 | 3 846 | 1 803 | ||||||||
|
|||||||||||||
North Sea | | | | | | ||||||||
|
|||||||||||||
Total Proved Undeveloped | 31 561 | 15 102 | 7 601 | 3 846 | 1 803 | ||||||||
|
|||||||||||||
Proved | |||||||||||||
|
|||||||||||||
Mining | 32 906 | 26 180 | 18 294 | 13 357 | 10 273 | ||||||||
In Situ | 27 129 | 16 321 | 10 888 | 7 902 | 6 118 | ||||||||
E&P Canada | 1 932 | 1 769 | 1 572 | 1 387 | 1 228 | ||||||||
|
|||||||||||||
Total Canada | 61 968 | 44 271 | 30 754 | 22 647 | 17 619 | ||||||||
|
|||||||||||||
North Sea | 1 810 | 1 705 | 1 594 | 1 489 | 1 394 | ||||||||
|
|||||||||||||
Total Proved | 63 778 | 45 975 | 32 348 | 24 136 | 19 014 | ||||||||
|
|||||||||||||
Probable | |||||||||||||
|
|||||||||||||
Mining | 24 639 | 9 844 | 5 081 | 3 106 | 2 125 | ||||||||
In Situ | 49 267 | 14 411 | 5 915 | 3 250 | 2 179 | ||||||||
E&P Canada | 7 589 | 4 885 | 3 286 | 2 334 | 1 733 | ||||||||
|
|||||||||||||
Total Canada | 81 495 | 29 140 | 14 283 | 8 690 | 6 037 | ||||||||
|
|||||||||||||
North Sea | 900 | 721 | 576 | 464 | 379 | ||||||||
|
|||||||||||||
Total Probable | 82 395 | 29 860 | 14 858 | 9 154 | 6 417 | ||||||||
|
|||||||||||||
Proved Plus Probable | |||||||||||||
|
|||||||||||||
Mining | 57 545 | 36 025 | 23 376 | 16 463 | 12 398 | ||||||||
In Situ | 76 396 | 30 732 | 16 803 | 11 152 | 8 297 | ||||||||
E&P Canada | 9 521 | 6 654 | 4 858 | 3 721 | 2 961 | ||||||||
|
|||||||||||||
Total Canada | 143 462 | 73 410 | 45 037 | 31 337 | 23 656 | ||||||||
|
|||||||||||||
North Sea | 2 710 | 2 425 | 2 170 | 1 954 | 1 774 | ||||||||
|
|||||||||||||
Total Proved Plus Probable | 146 172 | 75 836 | 47 207 | 33 290 | 25 430 | ||||||||
|
See the Notes at the end of the Future Net Revenues Tables.
36 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Total Future Net Revenues(1)
as at December 31, 2016
(forecast prices and costs)
(in $ millions, undiscounted) | Revenue | Royalties |
Operating Costs |
Development Costs |
Abandonment and Reclamation Costs |
Future Net Revenues Before Deducting Future Income Tax Expenses |
Future Income Tax Expenses |
Future Net Revenues After Deducting Future Income Tax Expenses |
||||||||||
|
||||||||||||||||||
Proved Developed Producing | ||||||||||||||||||
|
||||||||||||||||||
Mining | 216 733 | 23 469 | 110 077 | 29 306 | 19 687 | 34 194 | 10 341 | 23 852 | ||||||||||
In Situ | 17 633 | 926 | 7 696 | 2 089 | 507 | 6 415 | 1 490 | 4 925 | ||||||||||
E&P Canada | 4 669 | 1 044 | 1 496 | 110 | 1 083 | 937 | | 937 | ||||||||||
|
||||||||||||||||||
Total Canada | 239 036 | 25 440 | 119 269 | 31 504 | 21 277 | 41 546 | 11 831 | 29 715 | ||||||||||
|
||||||||||||||||||
North Sea | 5 469 | | 1 663 | 123 | 551 | 3 131 | 1 322 | 1 810 | ||||||||||
|
||||||||||||||||||
Total Proved Developed Producing | 244 505 | 25 440 | 120 932 | 31 627 | 21 828 | 44 677 | 13 153 | 31 524 | ||||||||||
|
||||||||||||||||||
Proved Developed Non-Producing | ||||||||||||||||||
|
||||||||||||||||||
Mining | | | | | | | | | ||||||||||
In Situ(3) | 2 184 | 291 | 743 | 195 | 14 | 941 | 250 | 691 | ||||||||||
E&P Canada | 6 | | 4 | 1 | 1 | 1 | | 1 | ||||||||||
|
||||||||||||||||||
Total Canada | 2 190 | 291 | 746 | 196 | 14 | 942 | 250 | 692 | ||||||||||
|
||||||||||||||||||
North Sea | | | | | | | | | ||||||||||
|
||||||||||||||||||
Total Proved Developed Non-Producing | 2 190 | 291 | 746 | 196 | 14 | 942 | 250 | 692 | ||||||||||
|
||||||||||||||||||
Proved Undeveloped | ||||||||||||||||||
|
||||||||||||||||||
Mining | 59 298 | 4 736 | 34 089 | 7 711 | 1 166 | 11 596 | 2 542 | 9 054 | ||||||||||
In Situ | 106 443 | 15 472 | 36 286 | 23 423 | 1 228 | 30 035 | 8 522 | 21 513 | ||||||||||
E&P Canada | 3 967 | 223 | 1 246 | 1 000 | 417 | 1 082 | 87 | 994 | ||||||||||
|
||||||||||||||||||
Total Canada | 169 708 | 20 430 | 71 621 | 32 134 | 2 811 | 42 712 | 11 151 | 31 561 | ||||||||||
|
||||||||||||||||||
North Sea | | | | | | | | | ||||||||||
|
||||||||||||||||||
Total Proved Undeveloped | 169 708 | 20 430 | 71 621 | 32 134 | 2 811 | 42 712 | 11 151 | 31 561 | ||||||||||
|
||||||||||||||||||
Proved | ||||||||||||||||||
|
||||||||||||||||||
Mining | 276 031 | 28 205 | 144 166 | 37 017 | 20 853 | 45 790 | 12 883 | 32 906 | ||||||||||
In Situ | 126 260 | 16 690 | 44 724 | 25 707 | 1 749 | 37 391 | 10 262 | 27 129 | ||||||||||
E&P Canada | 8 643 | 1 267 | 2 746 | 1 110 | 1 500 | 2 020 | 87 | 1 932 | ||||||||||
|
||||||||||||||||||
Total Canada | 410 934 | 46 161 | 191 636 | 63 834 | 24 102 | 85 201 | 23 233 | 61 968 | ||||||||||
|
||||||||||||||||||
North Sea | 5 469 | | 1 663 | 123 | 551 | 3 131 | 1 322 | 1 810 | ||||||||||
|
||||||||||||||||||
Total Proved | 416 402 | 46 161 | 193 299 | 63 957 | 24 653 | 88 332 | 24 555 | 63 778 | ||||||||||
|
||||||||||||||||||
Probable | ||||||||||||||||||
|
||||||||||||||||||
Mining | 127 083 | 17 206 | 61 231 | 13 160 | 2 427 | 33 060 | 8 421 | 24 639 | ||||||||||
In Situ | 204 093 | 38 605 | 59 170 | 36 902 | 1 559 | 67 857 | 18 590 | 49 267 | ||||||||||
E&P Canada | 20 729 | 3 731 | 4 686 | 1 363 | 583 | 10 365 | 2 776 | 7 589 | ||||||||||
|
||||||||||||||||||
Total Canada | 351 905 | 59 543 | 125 087 | 51 425 | 4 568 | 111 282 | 29 787 | 81 495 | ||||||||||
|
||||||||||||||||||
North Sea | 2 935 | | 934 | 275 | 81 | 1 645 | 745 | 900 | ||||||||||
|
||||||||||||||||||
Total Probable | 354 839 | 59 543 | 126 021 | 51 700 | 4 649 | 112 927 | 30 532 | 82 395 | ||||||||||
|
||||||||||||||||||
Proved Plus Probable | ||||||||||||||||||
|
||||||||||||||||||
Mining | 403 114 | 45 411 | 205 397 | 50 177 | 23 279 | 78 850 | 21 304 | 57 545 | ||||||||||
In Situ | 330 353 | 55 295 | 103 894 | 62 609 | 3 307 | 105 248 | 28 852 | 76 396 | ||||||||||
E&P Canada | 29 371 | 4 998 | 7 432 | 2 473 | 2 083 | 12 385 | 2 864 | 9 521 | ||||||||||
|
||||||||||||||||||
Total Canada | 762 838 | 105 704 | 316 723 | 115 259 | 28 670 | 196 483 | 53 020 | 143 462 | ||||||||||
|
||||||||||||||||||
North Sea | 8 404 | | 2 598 | 398 | 632 | 4 776 | 2 067 | 2 710 | ||||||||||
|
||||||||||||||||||
Total Proved Plus Probable | 771 242 | 105 704 | 319 320 | 115 657 | 29 302 | 201 259 | 55 087 | 146 172 | ||||||||||
|
See the Notes at the end of the Future Net Revenues Tables.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 37
Future Net Revenues by Product Type(1)
as at December 31, 2016
(forecast prices and costs)
(before income taxes, discounted at 10% per year) | $ millions |
Unit Value $/boe(2) |
||||
|
||||||
Proved Developed Producing | ||||||
|
||||||
SCO | 25 919 | 11.68 | ||||
|
||||||
Bitumen | 1 410 | 13.13 | ||||
|
||||||
Light Crude & Medium Crude Oil(3) | 3 755 | 33.47 | ||||
|
||||||
Heavy Crude Oil | | | ||||
|
||||||
Conventional Natural Gas(4) | 33 | 7.61 | ||||
|
||||||
Total Proved Developed Producing | 31 118 | 12.73 | ||||
|
||||||
Proved | ||||||
|
||||||
SCO | 31 269 | 11.47 | ||||
|
||||||
Bitumen | 7 167 | 4.71 | ||||
|
||||||
Light Crude & Medium Crude Oil(3) | 3 994 | 30.88 | ||||
|
||||||
Heavy Crude Oil | 314 | 11.59 | ||||
|
||||||
Conventional Natural Gas(4) | 34 | 7.39 | ||||
|
||||||
Total Proved | 42 779 | 9.70 | ||||
|
||||||
Proved Plus Probable | ||||||
|
||||||
SCO | 44 905 | 10.66 | ||||
|
||||||
Bitumen | 8 860 | 3.81 | ||||
|
||||||
Light Crude & Medium Crude Oil(3) | 7 507 | 29.30 | ||||
|
||||||
Heavy Crude Oil | 2 301 | 22.71 | ||||
|
||||||
Conventional Natural Gas(4) | 46 | 7.08 | ||||
|
||||||
Total Proved Plus Probable | 63 618 | 9.22 | ||||
|
38 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Notes to Future Net Revenues Tables
In Situ Future Net Revenues
Future net revenues for In Situ properties reflect the flexibility of Suncor's operations, which allows production from these properties to be either upgraded to SCO or sold as non-upgraded bitumen. The proportion of upgraded production is based on estimated available upgrading capacity and can vary depending on pricing of the respective products, maintenance, fluctuations in production from mining and extraction operations, or changes in the company's overall Oil Sands development strategy.
Future net revenues disclosed above include the estimated future sales prices, and associated upgrader operating and sustaining capital costs, assuming that approximately 49-55% of Firebag bitumen production is upgraded to SCO from 2017 to 2034 and 100% thereafter (for total proved plus probable reserves). These assumptions have resulted in a $3.0 billion increase in the net present value of future net revenues (total proved plus probable reserves, before tax, discounted at 10%) attributable to In Situ production relative to the scenario where none of the bitumen is upgraded.
Revenues and the natural gas fuel expense associated with excess power generated from cogeneration facilities at Firebag are included in future net revenues.
Forecast Prices and Costs
Crude oil, natural gas and other important benchmark reference pricing, as well as inflation and exchange rates utilized in the GLJ Reports and the Sproule Reports, were derived using averages of forecasts developed by GLJ, Sproule and McDaniel & Associates Consultants Ltd. dated January 1, 2017. Resultant forecasts are set out below. To the extent there are fixed or presently determinable future prices or costs to which Suncor is legally bound by contractual or other obligations to supply a physical product, including those for an extension period of a contract that is likely to be extended, those prices or costs have been incorporated into the forecast prices as applied to the pertinent properties. The forecast cost and price assumptions include increases in wellhead selling prices, take into account inflation with respect to future operating and capital costs, and assume the continuance of current laws and regulations. The inflation rates utilized in the forecasts were 0.7% in 2017 and 2.0% in 2018 and thereafter.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 39
Prices Impacting Reserves Tables(1)
Forecast |
Brent North Sea(2) |
WTI Cushing Oklahoma |
WCS Hardisty Alberta(3) |
Light Sweet Edmonton Alberta(4) |
Pentanes Plus Edmonton Alberta(5) |
AECO Gas(6) |
B.C. Gas Westcoast Station 2(7) |
National Balancing Point North Sea(8) |
|||||||||
|
|||||||||||||||||
Year | US$/bbl | US$/bbl | Cdn$/bbl | Cdn$/bbl | Cdn$/bbl | Cdn$/mmbtu | Cdn$/mmbtu | Cdn$/mmbtu | |||||||||
|
|||||||||||||||||
2016(9) | 43.75 | 43.45 | 29.55 | 51.90 | 47.45 | 2.15 | 1.76 | 4.70 | |||||||||
|
|||||||||||||||||
2017 | 56.00 | 55.00 | 53.38 | 68.24 | 70.95 | 3.43 | 3.00 | 7.78 | |||||||||
|
|||||||||||||||||
2018 | 61.90 | 60.90 | 58.95 | 73.16 | 75.40 | 3.17 | 2.78 | 7.80 | |||||||||
|
|||||||||||||||||
2019 | 66.47 | 65.47 | 62.70 | 76.25 | 78.72 | 3.26 | 2.94 | 7.71 | |||||||||
|
|||||||||||||||||
2020 | 70.50 | 69.13 | 65.48 | 79.37 | 81.52 | 3.67 | 3.35 | 8.11 | |||||||||
|
|||||||||||||||||
2021 | 74.58 | 73.21 | 68.39 | 82.56 | 84.77 | 3.86 | 3.54 | 8.18 | |||||||||
|
|||||||||||||||||
2022 | 76.56 | 75.19 | 70.49 | 84.85 | 87.17 | 3.97 | 3.65 | 8.35 | |||||||||
|
|||||||||||||||||
2023 | 78.56 | 77.19 | 72.58 | 87.15 | 89.44 | 4.11 | 3.76 | 8.51 | |||||||||
|
|||||||||||||||||
2024 | 80.60 | 79.23 | 74.73 | 89.50 | 91.86 | 4.23 | 3.88 | 8.69 | |||||||||
|
|||||||||||||||||
2025 | 82.68 | 81.28 | 76.88 | 91.89 | 94.67 | 4.31 | 3.96 | 8.86 | |||||||||
|
|||||||||||||||||
2026 | 84.98 | 83.39 | 79.08 | 94.01 | 96.73 | 4.41 | 4.06 | 9.04 | |||||||||
|
|||||||||||||||||
2027 | 86.65 | 85.03 | 80.64 | 95.85 | 98.66 | 4.51 | 4.16 | 9.22 | |||||||||
|
|||||||||||||||||
2028 | 88.37 | 86.73 | 82.25 | 97.78 | 100.62 | 4.60 | 4.24 | 9.40 | |||||||||
|
|||||||||||||||||
2029 | 90.19 | 88.48 | 83.89 | 99.74 | 102.65 | 4.68 | 4.32 | 9.59 | |||||||||
|
|||||||||||||||||
2030 | 91.99 | 90.26 | 85.61 | 101.76 | 104.73 | 4.77 | 4.41 | 9.78 | |||||||||
|
|||||||||||||||||
2031 | 93.82 | 92.06 | 87.29 | 103.78 | 106.81 | 4.87 | 4.51 | 9.97 | |||||||||
|
|||||||||||||||||
2032+ | +2.0%/yr | +2.0%/yr | +2.0%/yr | +2.0%/yr | +2.0%/yr | +2.0%/yr | +2.0%/yr | +2.0%/yr | |||||||||
|
Foreign Exchange Rates Impacting Forecast Prices
Forecast |
US$/Cdn$ Exchange Rate |
Cdn$/€ Exchange Rate |
Cdn$/£ Exchange Rate |
||||
|
|||||||
Year | |||||||
|
|||||||
2017 | 0.760 | 1.382 | 1.711 | ||||
|
|||||||
2018 | 0.790 | 1.329 | 1.677 | ||||
|
|||||||
2019 | 0.817 | 1.286 | 1.622 | ||||
|
|||||||
2020 | 0.833 | 1.260 | 1.590 | ||||
|
|||||||
2021 | 0.850 | 1.235 | 1.559 | ||||
|
|||||||
2022+ | 0.850 | 1.235 | 1.559 | ||||
|
Disclosure of After-Tax Net Present Value of Future Net Revenues
Values presented in the table for Net Present Value of Future Net Revenues After Income Taxes reflect income tax burdens of assets at an individual asset level (for In Situ) or at a business area or legal entity level (for Mining, North Sea and E&P Canada) based on tax pools associated with that business area or legal entity. Suncor's actual corporate legal entity structure for income taxes and income tax planning has not been considered, and, therefore, the total value for income taxes presented in the total future net revenues table may not provide an estimate of the value at the corporate entity level, which may be significantly different. The 2016 audited Consolidated Financial Statements and the MD&A should be consulted for information on income taxes at the corporate entity level.
40 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Additional Information Relating to Reserves Data
Future Development Costs(1)
as at December 31, 2016
(forecast prices and costs)
($ millions) | 2017 | 2018 | 2019 | 2020 | 2021 | Remainder | Total |
Discounted At 10% |
||||||||||
|
||||||||||||||||||
Proved | ||||||||||||||||||
|
||||||||||||||||||
Mining | 2 632 | 2 053 | 1 648 | 1 700 | 1 696 | 27 288 | 37 017 | 17 037 | ||||||||||
|
||||||||||||||||||
In Situ | 603 | 819 | 946 | 983 | 1 097 | 21 259 | 25 707 | 9 489 | ||||||||||
|
||||||||||||||||||
E&P Canada | 446 | 94 | 42 | 107 | 69 | 352 | 1 110 | 825 | ||||||||||
|
||||||||||||||||||
Total Canada | 3 681 | 2 967 | 2 637 | 2 790 | 2 861 | 48 898 | 63 834 | 27 352 | ||||||||||
|
||||||||||||||||||
North Sea | 24 | 10 | 8 | 11 | 11 | 59 | 123 | 87 | ||||||||||
|
||||||||||||||||||
Total Proved | 3 705 | 2 976 | 2 645 | 2 801 | 2 873 | 48 958 | 63 957 | 27 439 | ||||||||||
|
||||||||||||||||||
Proved Plus Probable | ||||||||||||||||||
|
||||||||||||||||||
Mining | 2 704 | 2 179 | 1 855 | 1 882 | 1 890 | 39 668 | 50 177 | 19 810 | ||||||||||
|
||||||||||||||||||
In Situ | 393 | 977 | 904 | 947 | 934 | 58 454 | 62 609 | 10 901 | ||||||||||
|
||||||||||||||||||
E&P Canada | 604 | 289 | 237 | 246 | 122 | 975 | 2 473 | 1 673 | ||||||||||
|
||||||||||||||||||
Total Canada | 3 701 | 3 445 | 2 996 | 3 075 | 2 945 | 99 097 | 115 259 | 32 383 | ||||||||||
|
||||||||||||||||||
North Sea | 74 | 114 | 70 | 12 | 13 | 115 | 398 | 313 | ||||||||||
|
||||||||||||||||||
Total Proved Plus Probable | 3 776 | 3 559 | 3 066 | 3 087 | 2 958 | 99 211 | 115 657 | 32 696 | ||||||||||
|
Development costs include costs associated with both developed and undeveloped reserves. Significant development activities and costs for 2017 are expected to include:
Management currently believes that internally generated cash flows, existing and future credit facilities and, if needed, the divestiture of non-core assets and accessing capital markets will be sufficient to fund future development costs. There can be no guarantee that funds will be available or that Suncor will allocate funding to develop all of the reserves attributed in the GLJ Reports and the Sproule Reports. Failure to develop those reserves would have a negative impact on future cash flow provided by operating activities.
Interest expense or other costs of external funding are not included in the reserves and future net revenues estimates and could reduce future net revenues to some degree depending upon the funding sources utilized. Suncor does not anticipate that interest expense or other funding costs on their own would make development of any property uneconomic.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 41
Abandonment and Reclamation Costs
The company completes an annual review of its consolidated abandonment and reclamation cost estimates. The estimates are based on the anticipated method and extent of restoration, consistent with legal requirements, technological advances and the possible future use of the site.
As at December 31, 2016, Suncor estimated its undiscounted, uninflated abandonment and reclamation costs for its upstream assets to be approximately $11.5 billion (discounted at 10%, approximately $2.9 billion) excluding Refining and Marketing liabilities ($0.2 billion, undiscounted and uninflated). Abandonment and reclamation costs are limited to current disturbances at December 31, 2016 for Suncor's assets, except for Syncrude which is estimated on a life of mine basis, where it is assumed that material from future disturbances will be required to settle the existing obligation at December 31, 2016. Suncor estimates that it will incur $1.3 billion of its identified abandonment and reclamation costs during the next three years (undiscounted: 2017 $0.4 billion, 2018 $0.4 billion, 2019 $0.5 billion), more than 78% of which is associated with Oil Sands mining operations.
The abandonment and reclamation cost estimates included in the net present values of the company's proved and probable reserves include costs related to the reclamation of disturbed land from oil sands mining activities, future mining disturbances, the treatment of legacy oil sands tailings, the decommissioning of oil sands and natural gas processing facilities and well pads, existing and future reserve wells and associated service wells, disturbed lease sites, and future lease site disturbances. Approximately $29.3 billion (inflated and undiscounted) has been deducted as abandonment and reclamation costs in estimating the future net revenues from proved plus probable reserves, including $26.6 billion related to the company's oil sands upgraders, extraction facilities, tailings ponds, subsurface wells and central processing facilities, which includes amounts related to current disturbances.
42 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Gross Proved and Probable Undeveloped Reserves
The tables below outline the gross proved and probable undeveloped reserves and represent undeveloped reserves additions resulting from acquisitions, discoveries, infill drilling, improved recovery and/or extensions in the year when the events first occurred.
Gross Proved Undeveloped Reserves(1)
(forecast prices and costs)
2014 |
2015 |
2016 |
||||||||||||
|
|
|
|
|||||||||||
First Attributed |
Total at December 31 2014 |
First Attributed |
Total at December 31 2015 |
First Attributed |
Total at December 31 2016 |
|||||||||
|
||||||||||||||
SCO (mmbbls) | ||||||||||||||
|
||||||||||||||
Mining | | | | | | | ||||||||
|
||||||||||||||
In Situ | | 532 | | 584 | | 576 | ||||||||
|
||||||||||||||
Total SCO | | 532 | | 584 | | 576 | ||||||||
|
||||||||||||||
Bitumen (mmbbls) | ||||||||||||||
|
||||||||||||||
Mining | | 845 | 207 | 1 052 | | 879 | ||||||||
|
||||||||||||||
In Situ | | 830 | | 741 | | 694 | ||||||||
|
||||||||||||||
Total Bitumen | | 1 674 | 207 | 1 792 | | 1 573 | ||||||||
|
||||||||||||||
Light Crude & Medium Crude Oil (mmbbls) | ||||||||||||||
|
||||||||||||||
E&P Canada | 38 | 52 | | 22 | 1 | 19 | ||||||||
|
||||||||||||||
North Sea | | 16 | | 10 | | | ||||||||
|
||||||||||||||
Other International(2) | | 2 | | 51 | | | ||||||||
|
||||||||||||||
Total Light Crude & Medium Crude Oil | 38 | 70 | | 83 | 1 | 19 | ||||||||
|
||||||||||||||
Heavy Crude Oil (mmbbls) | ||||||||||||||
|
||||||||||||||
E&P Canada | | | | 30 | | 27 | ||||||||
|
||||||||||||||
North Sea | | | | | | | ||||||||
|
||||||||||||||
Other International(2) | | | | | | | ||||||||
|
||||||||||||||
Total Heavy Crude Oil | | | | 30 | | 27 | ||||||||
|
||||||||||||||
Conventional Natural Gas (bcfe)(3) | ||||||||||||||
|
||||||||||||||
E&P Canada | | | | | | | ||||||||
|
||||||||||||||
North Sea | | 1 | | 1 | | | ||||||||
|
||||||||||||||
Other International(2) | | | | | | | ||||||||
|
||||||||||||||
Total Conventional Natural Gas | | 1 | | 1 | | | ||||||||
|
||||||||||||||
Total (mmboe) | 38 | 2 277 | 207 | 2 488 | 1 | 2 195 | ||||||||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 43
Gross Probable Undeveloped Reserves(1)
(forecast prices and costs)
2014 |
2015 |
2016 |
||||||||||||
|
|
|
|
|||||||||||
First Attributed |
Total at December 31 2014 |
First Attributed |
Total at December 31 2015 |
First Attributed |
Total at December 31 2016 |
|||||||||
|
||||||||||||||
SCO (mmbbls) | ||||||||||||||
|
||||||||||||||
Mining | | 265 | | 265 | 285 | 285 | ||||||||
|
||||||||||||||
In Situ | | 1 112 | | 1 207 | | 1 118 | ||||||||
|
||||||||||||||
Total SCO | | 1 378 | | 1 473 | 285 | 1 403 | ||||||||
|
||||||||||||||
Bitumen (mmbbls) | ||||||||||||||
|
||||||||||||||
Mining | | 408 | 107 | 542 | | 577 | ||||||||
|
||||||||||||||
In Situ | | 268 | | 250 | | 347 | ||||||||
|
||||||||||||||
Total Bitumen | | 677 | 107 | 791 | | 924 | ||||||||
|
||||||||||||||
Light Crude & Medium Crude Oil (mmbbls) | ||||||||||||||
|
||||||||||||||
E&P Canada | 10 | 189 | 5 | 88 | 7 | 79 | ||||||||
|
||||||||||||||
North Sea | | 13 | | 4 | 10 | 10 | ||||||||
|
||||||||||||||
Other International(2) | 1 | 3 | | 42 | | | ||||||||
|
||||||||||||||
Total Light Crude & Medium Crude Oil | 11 | 205 | 5 | 133 | 17 | 89 | ||||||||
|
||||||||||||||
Heavy Crude Oil (mmbbls) | ||||||||||||||
|
||||||||||||||
E&P Canada | | | | 82 | | 84 | ||||||||
|
||||||||||||||
North Sea | | | | | | | ||||||||
|
||||||||||||||
Other International(2) | | | | | | | ||||||||
|
||||||||||||||
Total Heavy Crude Oil | | | | 82 | | 84 | ||||||||
|
||||||||||||||
Conventional Natural Gas (bcfe)(3) | ||||||||||||||
|
||||||||||||||
E&P Canada | | 3 | | 2 | | | ||||||||
|
||||||||||||||
North Sea | | 1 | | 1 | 3 | 3 | ||||||||
|
||||||||||||||
Other International(2) | | | | | | | ||||||||
|
||||||||||||||
Total Conventional Natural Gas | | 4 | | 3 | 3 | 3 | ||||||||
|
||||||||||||||
Total (mmboe) | 11 | 2 260 | 112 | 2 479 | 303 | 2 500 | ||||||||
|
44 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Undeveloped In Situ reserves, which constitute approximately 58% of Suncor's gross proved undeveloped reserves and 59% of Suncor's gross probable undeveloped reserves have been assigned to reserves areas which are not classified as developed producing. Where supported by core hole wells, proved undeveloped reserves have been attributed to regions within 1.2 km from currently drilled or near-term planned production wells where AER approval is pending and, in the case of Firebag, also within 2.4 km from producing wells. Suncor has delineated In Situ reserves to a high degree of certainty through seismic data and core hole drilling, consistent with COGE Handbook guidelines. In most cases, proved reserves have been drilled to a density of 16 wells per section, which is in excess of the eight wells per section required for regulatory approval. Further delineation is pursued through annual core hole drilling programs. Management uses integrated plans to forecast future proved and probable undeveloped reserves development activity. Further delineation is pursued through annual core hole drilling programs. These detailed plans align current production, processing and pipeline constraints (which, in the case of processing constraints, do not permit Suncor to develop all of its undeveloped In Situ reserves within two years), capital spending commitments and future development for the next 10 years, and are reviewed and updated annually for internal and external factors affecting planned activity. The timing associated with developing undeveloped In Situ reserves is a function of the forecasts of the declining production from existing In Situ wells, and will take several years to develop, depending on performance. When existing wells decline, Suncor commences development of the reserves and wells surrounding the declining areas. This will entail drilling replacement well pairs and constructing sustaining pads. The economic viability of developing the sustaining pads and associated well pairs is tested to ensure that ongoing development is economic as required for reserves assessment. Sustaining pads are at various stages of development, from pad regulatory approval awaiting final internal approval to pad regulatory application, to more detailed continuing core hole evaluation. Final internal approvals are aligned with declining production from the existing In Situ wells.
Undeveloped Mining reserves constitute approximately 40% of Suncor's gross proved undeveloped reserves and 34% of Suncor's gross probable undeveloped reserves, and relate to the Fort Hills mining project and the Syncrude Mildred Lake Extension-West mining areas, which are well-delineated by core hole drilling. Regulatory approvals are in place for the Fort Hills mining project and application for approval has been submitted for the Syncrude Mildred Lake Extension-West mining area. Suncor is currently completing construction of the Fort Hills mining area, and first oil remains on track for late 2017.
Undeveloped conventional reserves (light crude oil and medium crude oil, heavy crude oil and natural gas) constitute approximately 2% of Suncor's gross proved undeveloped reserves and approximately 7% of Suncor's gross probable undeveloped reserves. Undeveloped conventional reserves primarily relate to the company's offshore assets at E&P Canada, mainly associated with Hebron which is currently under development (first oil expected in late 2017), and under-drilled or undrilled fault blocks related to areas in Hibernia, White Rose and Terra Nova. Due to ongoing political unrest in Libya and the resulting high level of uncertainty regarding resumption or continuation of production, the reserves associated with Libya have been reclassified to contingent resources. In developing undeveloped conventional reserves, Suncor considers existing facility capacity, capital allocation plans, and remaining reserve availability. Accordingly, in some cases, it will take longer than two years to develop all of the currently assigned undeveloped conventional reserves. Suncor plans to develop the majority of the conventional proved undeveloped reserves over the next five years and the majority of the conventional probable undeveloped reserves over the next seven years.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 45
Properties with no Attributed Reserves
The following table is a summary of properties to which no reserves are attributed as at December 31, 2016. For lands in which Suncor holds interests in different formations under the same surface area pursuant to separate leases, the area has been counted for each lease.
Country |
Gross Hectares |
Net Hectares |
|||
|
|||||
Canada | 6 570 563 | 3 695 452 | |||
|
|||||
Libya(1) | 3 117 800 | 1 422 900 | |||
|
|||||
U.S. Alaska | 481 740 | 160 564 | |||
|
|||||
Syria | 345 194 | 345 194 | |||
|
|||||
Norway | 305 429 | 96 562 | |||
|
|||||
U.K. | 110 530 | 33 194 | |||
|
|||||
Australia (overriding royalty interest only) | 113 027 | | |||
|
|||||
Total | 11 044 283 | 5 753 866 | |||
|
Suncor's undeveloped petroleum assets include exploration properties in a preliminary phase of evaluation, to discovery areas where tenure to the property is held indefinitely on the basis of hydrocarbon test results, but where economic development is not currently possible or has not yet been sanctioned. Certain properties may be in a relatively mature phase of evaluation, where a significant amount of development has occurred; however, reserves cannot be attributed due to one or more contingencies, such as project sanction. In many cases where reserves are not attributed to lands containing one or more discovery wells, the key limiting factor is the lack of available production infrastructure. Each year, as part of the company's process to review the economic viability of its properties, some properties are selected for further development activities, while others are temporarily deferred, sold, swapped or relinquished back to the mineral rights owner. Refer to the Risk Factors section of this AIF for additional information on risks and uncertainties.
In 2017, Suncor's rights to 29,966 net hectares in Canada, 64,705 net hectares in Norway and 14,689 net hectares in the U.K. are scheduled to expire. The expiries include approximately 1,237 net hectares in In Situ and 2,310 net hectares in Mining. Substantial portions of expiring lands may have their tenure continued beyond 2017 through the conduct of work programs and/or the payment of prescribed fees to the rights owner.
Oil and Gas Properties and Wells
For descriptions of Suncor's important properties, plants, facilities and installations, refer to the Narrative Description of Suncor's Businesses section within this AIF.
46 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
The following table is a summary of oil and gas wells as at December 31, 2016.
Oil Wells(1) |
Natural Gas Wells(1) |
||||||||||||||||
|
|
||||||||||||||||
Producing |
Non-Producing(2)(3) |
Producing |
Non-Producing(2)(3) |
||||||||||||||
|
|
|
|
||||||||||||||
Gross | Net | Gross | Net | Gross | Net | Gross | Net | ||||||||||
|
|||||||||||||||||
Alberta In Situ(4) | 300.0 | 300.0 | 96.0 | 96.0 | | | | | |||||||||
|
|||||||||||||||||
British Columbia | | | | | 28.0 | 26.5 | 21.0 | 16.9 | |||||||||
|
|||||||||||||||||
Newfoundland and Labrador | 72.0 | 18.5 | 3.0 | 0.8 | | | | | |||||||||
|
|||||||||||||||||
North Sea | 44.0 | 12.7 | 5.0 | 1.5 | | | | | |||||||||
|
|||||||||||||||||
Other International(5) | | | 419.0 | 211.1 | | | 6.0 | 6.0 | |||||||||
|
|||||||||||||||||
Total | 416.0 | 331.2 | 523.0 | 309.4 | 28.0 | 26.5 | 27.0 | 22.9 | |||||||||
|
There are no producing wells associated with Mining properties. Suncor has no proved developed non-producing reserves or probable developed non-producing reserves in its Mining reserves.
For In Situ properties, proved non-producing reserves and probable non-producing reserves are associated with wells that have been drilled within the last three years, which require further capital for completion and tie-in to facilities to bring the wells on-stream. Because this capital is small relative to the cost to drill, complete and tie-in a well pair, the associated reserves are considered developed.
Costs Incurred
The table below summarizes the company's costs incurred related to its oil and gas activities for the year ended December 31, 2016.
($ millions) |
Exploration Costs |
Proved Property Acquisition Costs |
Unproved Property Acquisition Costs |
Development Costs |
Total | ||||||
|
|||||||||||
Canada Mining and In Situ | 45 | 10 806 | 684 | 4 272 | 15 807 | ||||||
|
|||||||||||
Canada E&P Canada | 150 | | | 743 | 893 | ||||||
|
|||||||||||
Total Canada | 195 | 10 806 | 684 | 5 015 | 16 700 | ||||||
|
|||||||||||
North Sea | 49 | | 68 | 88 | 205 | ||||||
|
|||||||||||
Other International | 13 | | | | 13 | ||||||
|
|||||||||||
Total | 257 | 10 806 | 752 | 5 103 | 16 918 | ||||||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 47
Exploration and Development Activities
The table below outlines the gross and net exploratory and development wells the company completed during the year ended December 31, 2016.
Exploratory Wells(1) |
Development Wells |
|||||||||
|
|
|||||||||
Total number of wells completed | Gross | Net | Gross | Net | ||||||
|
||||||||||
Canada Oil Sands | ||||||||||
|
||||||||||
Oil | 2.0 | 2.0 | | | ||||||
|
||||||||||
Service(2) | 2.0 | 2.0 | | | ||||||
|
||||||||||
Stratigraphic Test(3) | 105.0 | 92.4 | | | ||||||
|
||||||||||
Total | 109.0 | 96.4 | | | ||||||
|
||||||||||
Canada E&P Canada | ||||||||||
|
||||||||||
Oil | | | 3 | 0.7 | ||||||
|
||||||||||
Dry Hole | 1 | 0.2 | | | ||||||
|
||||||||||
Natural Gas | | | | | ||||||
|
||||||||||
Service(2) | | | 4 | 0.8 | ||||||
|
||||||||||
Stratigraphic Test | | | | | ||||||
|
||||||||||
Total | 1 | 0.2 | 7 | 1.5 | ||||||
|
||||||||||
North Sea | ||||||||||
|
||||||||||
Oil | 1 | 0.6 | 5 | 1.3 | ||||||
|
||||||||||
Service(2) | | | 1 | 0.3 | ||||||
|
||||||||||
Dry Hole | 1 | 0.3 | ||||||||
|
||||||||||
Stratigraphic Test | | | | | ||||||
|
||||||||||
Total | 1 | 0.6 | 7 | 1.9 | ||||||
|
Significant exploration and development activities in 2016 included:
For significant exploration and development activities expected to occur in 2017 and beyond, see Narrative Description of Suncor's Businesses and Future Development Costs herein.
48 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Production History(1)
2016 | Q1 | Q2 | Q3 | Q4 | Year Ended | ||||||||
|
|||||||||||||
Canada Oil Sands | |||||||||||||
|
|||||||||||||
Total production (mbbls/d) | 565.8 | 213.1 | 617.5 | 620.4 | 504.9 | ||||||||
|
|||||||||||||
Bitumen Production (mbbls/d) | 130.7 | 91.1 | 132.6 | 108.9 | 115.9 | ||||||||
|
|||||||||||||
|
|||||||||||||
($/bbl) | |||||||||||||
|
|||||||||||||
Average price realized(2) | 12.0 | 23.90 | 26.67 | 31.68 | 23.50 | ||||||||
|
|||||||||||||
Royalties | | (0.24 | ) | (0.39 | ) | (0.33 | ) | (0.23 | ) | ||||
|
|||||||||||||
Production costs | (15.38 | ) | (20.34 | ) | (15.53 | ) | (15.51 | ) | (16.63 | ) | |||
|
|||||||||||||
Netback(5) | (3.38 | ) | 3.32 | 10.75 | 15.84 | 6.64 | |||||||
|
|||||||||||||
SCO and diesel (mbbls/d) | 322.3 | 86.4 | 301.1 | 324.5 | 258.9 | ||||||||
|
|||||||||||||
|
|||||||||||||
($/bbl) | |||||||||||||
|
|||||||||||||
Average price realized(2) | 43.27 | 52.58 | 56.69 | 62.28 | 53.53 | ||||||||
|
|||||||||||||
Royalties | (0.57 | ) | (0.33 | ) | (0.42 | ) | 2.74 | 0.50 | |||||
|
|||||||||||||
Production costs | (31.32 | ) | (67.99 | ) | (27.99 | ) | (30.85 | ) | (34.01 | ) | |||
|
|||||||||||||
Netback(5) | 11.38 | (15.74 | ) | 28.28 | 34.17 | 20.02 | |||||||
|
|||||||||||||
Syncrude (mbbls/d) | 112.8 | 35.6 | 183.8 | 187.0 | 130.1 | ||||||||
|
|||||||||||||
|
|||||||||||||
($/bbl) | |||||||||||||
|
|||||||||||||
Average price realized(2) | 44.93 | 59.34 | 58.62 | 64.28 | 56.91 | ||||||||
|
|||||||||||||
Royalties | (0.18 | ) | (0.98 | ) | (0.26 | ) | (4.70 | ) | (1.90 | ) | |||
|
|||||||||||||
Production costs | (28.61 | ) | (104.05 | ) | (25.34 | ) | (29.53 | ) | (32.58 | ) | |||
|
|||||||||||||
Netback(5) | 16.14 | (45.69 | ) | 33.02 | 30.05 | 22.43 | |||||||
|
|||||||||||||
Canada Light Crude & Medium Crude Oil(3) | |||||||||||||
|
|||||||||||||
Total production (mbbls/d) | 50.6 | 41.7 | 50.4 | 57.7 | 50.1 | ||||||||
|
|||||||||||||
|
|||||||||||||
($/bbl) | |||||||||||||
|
|||||||||||||
Average price realized(2) | 46.17 | 62.39 | 61.63 | 68.06 | 59.31 | ||||||||
|
|||||||||||||
Royalties | (5.51 | ) | (11.06 | ) | (10.93 | ) | (15.07 | ) | (10.64 | ) | |||
|
|||||||||||||
Production costs | (15.40 | ) | (16.81 | ) | (15.90 | ) | (11.24 | ) | (14.58 | ) | |||
|
|||||||||||||
Netback(5) | 25.26 | 34.52 | 34.80 | 41.75 | 34.09 | ||||||||
|
|||||||||||||
North Sea Light Crude & Medium Crude Oil(4) | |||||||||||||
|
|||||||||||||
Total production (mboe/d) | 72.0 | 73.2 | 57.0 | 56.5 | 64.6 | ||||||||
|
|||||||||||||
|
|||||||||||||
($/boe) | |||||||||||||
|
|||||||||||||
Average price realized(2) | 43.02 | 55.43 | 56.96 | 62.63 | 53.91 | ||||||||
|
|||||||||||||
Royalties | | | | | | ||||||||
|
|||||||||||||
Production costs | (7.72 | ) | (6.68 | ) | (6.98 | ) | (8.62 | ) | (7.46 | ) | |||
|
|||||||||||||
Netback(5) | 35.30 | 48.75 | 49.98 | 54.01 | 46.45 | ||||||||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 49
The following table provides the production volumes(1) on a working-interest basis, before royalties for each of Suncor's significant fields for the year ended December 31, 2016.
SCO | Bitumen |
Light & Medium Oil |
|||||
|
|||||||
mbbls/d | mbbls/d | mbbls/d | |||||
|
|||||||
Mining Suncor | 186.0 | | | ||||
|
|||||||
Mining Syncrude | 130.0 | | | ||||
|
|||||||
Firebag | 72.2 | 88.4 | | ||||
|
|||||||
MacKay River | | 27.6 | | ||||
|
|||||||
Buzzard | | | 46.0 | ||||
|
|||||||
GEAD | | | 18.6 | ||||
|
|||||||
Hibernia | | | 26.8 | ||||
|
|||||||
White Rose | | | 10.9 | ||||
|
|||||||
Terra Nova | | | 12.4 | ||||
|
|||||||
Total | 388.2 | 116.0 | 114.7 | ||||
|
Production Estimates
The table below outlines the production estimates for 2017 that are included in the estimates of gross proved reserves and gross probable reserves as at December 31, 2016. Total Proved plus Probable production estimates include 249.6 mbbls/d of SCO from Suncor's mining operations (excluding Syncrude), approximately 35% of total estimated production for 2017, 151.4 mbbls/d of SCO from Syncrude, approximately 21% of total estimated production for 2017, and 172.6 mbbls/d of SCO and bitumen from Firebag, approximately 24% of total estimated production for 2017.
SCO |
Bitumen |
Light & Medium Crude Oil |
Conventional Natural Gas |
Total |
||||||||||||||||||
(mbbls/d) |
(mbbls/d) |
(mbbls/d) |
(mmcfe/d) |
(mmboe/d)(1) |
||||||||||||||||||
Gross |
Net |
Gross |
Net |
Gross |
Net |
Gross |
Net |
Gross |
Net |
|||||||||||||
|
||||||||||||||||||||||
Canada | ||||||||||||||||||||||
|
||||||||||||||||||||||
Proved | 446 | 433 | 125 | 120 | 43 | 33 | 12 | 11 | 616 | 588 | ||||||||||||
|
||||||||||||||||||||||
Probable | 31 | 30 | 11 | 9 | 4 | 5 | 1 | 1 | 47 | 44 | ||||||||||||
|
||||||||||||||||||||||
Proved Plus Probable | 477 | 463 | 136 | 129 | 47 | 38 | 13 | 12 | 663 | 632 | ||||||||||||
|
||||||||||||||||||||||
North Sea | ||||||||||||||||||||||
|
||||||||||||||||||||||
Proved | | | | | 49 | 49 | 6 | 6 | 50 | 50 | ||||||||||||
|
||||||||||||||||||||||
Probable | | | | | 5 | 5 | 1 | 1 | 5 | 5 | ||||||||||||
|
||||||||||||||||||||||
Proved Plus Probable | | | | | 54 | 54 | 7 | 7 | 56 | 56 | ||||||||||||
|
||||||||||||||||||||||
Total(1) | ||||||||||||||||||||||
|
||||||||||||||||||||||
Proved | 446 | 433 | 125 | 120 | 93 | 82 | 18 | 17 | 666 | 638 | ||||||||||||
|
||||||||||||||||||||||
Probable | 31 | 30 | 11 | 9 | 9 | 10 | 2 | 2 | 52 | 49 | ||||||||||||
|
||||||||||||||||||||||
Proved Plus Probable | 477 | 463 | 136 | 129 | 102 | 92 | 20 | 19 | 718 | 688 | ||||||||||||
|
50 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Work Commitments
The practice of governments requiring companies to pledge to carry out work commitments in exchange for the right to carry out exploration for and development of hydrocarbons is common, particularly in unexplored or lightly explored regions of the world. The following table shows the estimated values of work commitments Suncor has made in regard to the lands it holds as at December 31, 2016. These commitments run through 2022 and beyond, and are primarily for conducting seismic programs and drilling exploration wells.
Country/Area ($ millions) |
2017 | 2018 | 2019+ | Total | |||||
|
|||||||||
Canada | | 40 | 46 | 86 | |||||
|
|||||||||
North Sea | | | | | |||||
|
|||||||||
Other International | | 81 | 401 | 482 | |||||
|
Forward Contracts
Suncor may use financial derivatives to manage its exposure to fluctuations in commodity prices; however, Suncor did not consider any financial derivative transactions to be material in 2016. A description of Suncor's use of such instruments is provided in the 2016 audited Consolidated Financial Statements and related MD&A for the year ended December 31, 2016.
Tax Horizon
In 2016, Suncor was subject to cash tax in the local jurisdictions related to earnings from its North Sea production, but was not cash taxable in Canada on the majority of its Canadian earnings. Based on projected future net earnings, Suncor is expected to be cash taxable on the majority of its Canadian earnings in 2017.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 51
The oil and natural gas industry is subject to extensive controls and regulations governing its operations (including land tenure, exploration, environmental, development, production, refining, transportation and marketing). These regulations are imposed by legislation enacted by various levels of government, and, with respect to export and taxation of oil and natural gas, by agreements among the governments of Canada, Ontario, Quebec, Alberta, British Columbia, and Newfoundland and Labrador, as well as the governments of the United States and other foreign jurisdictions in which we operate, all of which should be carefully considered by investors in the oil and gas industry. Current legislation is a matter of public record. All governments have the ability to change legislation, and the company is unable to predict what additional legislation or amendments may be enacted. Suncor may engage in the discussion on proposed changes to ensure Suncor's interests are recognized. The following discussion outlines some of the principal aspects of legislation, regulations and agreements governing Suncor's operations.
Pricing, Marketing and Exporting Crude Oil
The producers of oil are entitled to negotiate sales and purchase agreements directly with oil purchasers. Most agreements are linked to global oil prices. In Canada, oil exporters are also entitled to enter into export contracts. If the term of an export contract exceeds one year for light and medium crude oil or exceeds two years for heavy crude oil (to a maximum of 25 years), the exporter is required to obtain an export licence from the National Energy Board (NEB). If the term of an export contract does not exceed one year for light and medium crude oil or does not exceed two years for heavy crude oil, the exporter is required to obtain an order approving such export from the NEB. The NEB is currently drafting amending regulations to update the current regulations governing the issuance of export licences. The updating process is necessary to meet the criteria set out in the federal Jobs, Growth and Long-Term Prosperity Act, which received Royal Assent on June 29, 2012. In the transitory period, the NEB has issued, and is currently following, an Interim Memorandum of Guidance concerning Oil and Gas Export Applications and Gas Import Applications under Part VI of the National Energy Board Act.
Under the North American Free Trade Agreement (NAFTA), Canada continues to remain free to determine whether exports of energy resources to the United States or Mexico will be allowed, provided that any export restrictions do not (i) reduce the proportion of energy resources exported relative to the total supply of goods of the party maintaining the restriction as compared to the proportion prevailing in the most recent 36-month period; (ii) impose an export price higher than the domestic price (subject to an exception with respect to certain measures which only restrict the volume of exports); and (iii) disrupt normal channels of supply. All three countries are prohibited from imposing minimum or maximum export or import price requirements.
NAFTA requires energy regulators to ensure the orderly and equitable implementation of any regulatory changes and to ensure that the application of those changes will cause minimal disruption to contractual arrangements and avoid undue interference with pricing, marketing and distribution arrangements, all of which are important for Canadian oil and natural gas exports.
While the current U.S. administration has indicated its intention to renegotiate or withdraw from NAFTA, there have been no formal steps taken in this regard to date. As such, at this time, we are unable to predict whether such renegotiation or withdrawal will take place and, if so, what impact it may have.
Internationally, prices for crude oil and natural gas fluctuate in response to changes in the supply of and demand for crude oil and natural gas, market uncertainty and a variety of other factors beyond Suncor's control. These factors include, but are not limited to, the actions of OPEC, world economic conditions, government regulation, political developments, the foreign supply of oil, the price of foreign imports, the availability of alternate fuel sources, and weather conditions.
Royalties, Incentives and Income Taxes
Canada
The royalty regime is a significant factor in the profitability of SCO, bitumen, crude oil, NGLs and natural gas production. Royalties on production from lands other than Crown lands are determined by negotiations between the mineral freehold owner and the lessee, although production from such lands may be subject to certain provincial taxes. Crown royalties are determined by governmental regulation or by agreement with government in certain circumstances, which are subject to change as a result of numerous factors, including political considerations, and are generally calculated as a percentage of revenues received from the value of the gross production. The royalty rate generally depends in part on prescribed reference prices, well productivity, geographical location, field discovery date, method of recovery, depth of well, and the type or quality of the petroleum product produced. Other royalties and royalty-like interests are, from time to time, carved out of the owner's working interest through non-public transactions. These are often referred to as overriding royalties, gross overriding royalties, net profits interests or net carried interests.
52 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
For a discussion of the royalties in Alberta and Newfoundland and Labrador, refer to the Narrative Description of Suncor's Businesses section of this AIF.
The Canadian federal corporate income tax rate levied on taxable income for 2016 was 15% for active business income, including resource income. The average provincial income tax rate for Suncor in 2016 was 12%. The rate will decrease to 11.97% for 2017 as a result of a Quebec rate change enacted in the fourth quarter of 2016 which will decrease the Quebec rate from 11.9% to 11.5% over four years beginning effective January 1, 2017.
Other Jurisdictions
Operations in the U.S. are subject to the U.S. federal tax rate of 35% and a blended state rate of 2%.
Operations in the U.K. are subject to a tax rate of 40% (decreased from 50% in 2016), made up of the corporate income tax rate and the supplemental charge. In Norway, Suncor earns refundable tax credits related to eligible exploration spending at a rate of 78%.
Amounts presented in Suncor's 2016 audited Consolidated Financial Statements as royalties for production from the company's Libya operations are determined pursuant to EPSAs. The amounts calculated reflect the difference between Suncor's working interest in the particular project and the net revenue attributable to Suncor under the terms of the respective EPSAs. All government interests in these operations, except for income taxes, are presented as royalties.
Land Tenure
In Canada, crude oil and natural gas located in the western provinces are owned predominantly by the respective provincial governments. Provincial governments grant rights to explore for and produce oil and natural gas pursuant to leases, licences and permits for varying terms, and on conditions set forth in provincial legislation, including requirements to perform specific work or make payments. Oil and natural gas located in such provinces can also be privately owned, and rights to explore for and produce such oil and natural gas are granted by lease on such terms and conditions as negotiated. In frontier areas of Canada, the mineral rights are primarily owned by the Canadian federal government, which, either directly or through shared jurisdiction agreements with the relevant provincial authorities, grants tenure in the form of exploration, significant discovery and production licences.
In many other international jurisdictions, crude oil and natural gas are most commonly owned by national governments that grant rights in the form of exploration licences and permits, production licences, PSCs and other similar forms of tenure. In all cases, Suncor's right to explore, develop and produce crude oil and natural gas is subject to ongoing compliance with the regulatory requirements established by the relevant country.
Environmental Regulation
The company is subject to environmental regulation under a variety of Canadian, U.S., U.K. and other foreign, federal, provincial, territorial, state and municipal laws and regulations. These regulatory regimes are laws of general application. Among other things, they provide for restrictions and prohibitions on the spill, release or emission of various substances produced in association with production that apply to Suncor and other companies in the energy industry. The regulatory regimes require Suncor to obtain operating licences and permits in order to operate, and impose certain standards and controls on activities relating to mining, oil and gas exploration, development and production, and the refining, distribution and marketing of petroleum products and petrochemicals. Environmental assessments and regulatory approvals are generally required before initiating most new major projects or undertaking significant changes to existing operations. In addition, this legislation requires that the company abandon and reclaim mine, well and facility sites to the satisfaction of regulatory authorities and, in some cases, this burden may remain with the company even after disposition of an asset to a third party. Compliance with such legislation can require significant expenditures, and a breach of these requirements may result in suspension or revocation of necessary licences and authorizations, civil liability for pollution damage, and the imposition of material fines and penalties. In addition to these specific, known requirements, Suncor expects future changes to environmental legislation, including anticipated legislation for air pollution and GHG emissions that will impose further requirements on companies operating in the energy industry.
A number of statutes, regulations and frameworks are under development or have been issued by various provincial regulators that oversee oil sands development. These statutes, regulations and frameworks relate to such issues as tailings management, water use, air emissions and land use. While the financial implications of statutes, regulations and frameworks under development are not yet known, the company is committed to working with the appropriate regulatory bodies as they develop new policies, and to fully complying with all existing and new statutes, regulations and frameworks as they apply to the company's operations.
In general, there remains uncertainty around the outcomes and impacts of climate change and environmental laws and regulations, whether currently in force or enacted in the future. It is not currently possible to predict the nature of any future requirements or the impact on the company and its business, financial condition, results of operations and
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 53
cash flow. We continue to actively work to mitigate our environmental impact, including taking action to reduce GHG emissions, investing in renewable forms of energy such as wind power and biofuels, continuing land reclamation activities, installing new emissions abatement equipment, investing in research and development, and working to advance other environmental technologies.
Recent environmental regulation and initiatives have had an impact on many areas important to Suncor's operations, some of which are summarized in the following subsections.
Climate Change
Suncor operates in many jurisdictions that have regulated, or have proposed to regulate, industrial GHG emissions. Suncor is committed to fully complying with existing regulations and will continue to constructively engage the appropriate governmental bodies in meaningful dialogue to harmonize regulations focused on achieving actual reduction goals and sustainable resource development across jurisdictions within North America.
As part of its ongoing business planning, Suncor assesses future costs associated with CO2 emissions in its operations and the evaluation of future projects, based on the company's outlook for the carbon price under current and pending GHG regulations, using a price range of $30 to $65/tonne of CO2e as a base case, applied against a range of policy design options. The company expects that environmental regulation will continue to evolve with a carbon price signal that balances economic, environmental and energy security objectives. Suncor will continue to review the impact of future carbon-constrained scenarios on its business strategy.
Some of the recent environmental regulations and initiatives related to climate change and GHG emissions are described below.
International Climate Change Agreements and Treaties
The common goal of the nearly 200 countries that have signed the Paris Agreement on climate change which came into force on November 4, 2016, is to hold global warming to "well below 2 degrees celsius" and to pursue efforts to limit the temperature increase to 1.5 degrees celsius above preindustrial levels. The Government of Canada set a goal to reduce GHG emissions economy-wide by 30% below 2005 levels by 2030.
Canadian Federal GHG Regulations
In furtherance of its commitments under the Paris Agreement, the federal government, along with the provincial and territorial leaders (excluding Manitoba and Saskatchewan), announced the Pan-Canadian Framework on Clean Growth and Climate Change (PCF) in 2016.
Under the PCF, the federal government will require all jurisdictions to have a carbon price, starting at $10 per tonne in 2018 and rising by $10 per year to $50 per tonne in 2022. Jurisdictions can implement: (i) an explicit price-based system (such as the carbon tax adopted by British Columbia or the carbon levy and performance-based emissions system adopted in Alberta), or (ii) a cap-and-trade system (which has been adopted in Ontario and Quebec). Within these programs, provinces have discretion to manage competitiveness of their trade-exposed industries. The carbon pricing initiatives adopted in British Columbia, Alberta, Ontario and Quebec and their impact on Suncor are described in the Canadian Provincial GHG Regulations section below.
To complement carbon pricing, a clean fuel standard with the objective of achieving annual reductions of 30 Mt of GHG emissions by 2030 is being developed by the federal government. The standard would require reductions in the carbon footprint of the fuels supplied in Canada, based on life cycle analysis. The approach would not differentiate between crude oil types produced in or imported into Canada. This standard is expected to apply to a broad suite of fuels used in transportation, industry, homes and buildings; however, as the standard is currently under development, we are unable to predict the impact it will have.
Canadian Provincial GHG Regulations
In 2007, the Government of Alberta enacted the Specified Gas Emitters Regulation (SGER), which applies to facilities in Alberta with CO2e emissions in excess of 100,000 tonnes per year. Suncor's Oil Sands Base plant, MacKay River plant, Firebag operations and the Edmonton refinery are currently subject to the SGER.
For the 2015 compliance year, Suncor earned a compliance credit of $10.9 million due to reliability and energy efficiency improvement across our operations with increased production. For the 2016 compliance year, Suncor estimates that it will earn a compliance credit of $1.6 million due to the planned turnaround at Upgrader 2, which increases emissions with reduced production, plus the reduced production from the Fort McMurray forest fires experienced in 2016. A 2017 forecast is unavailable pending government consultation with industry around policy design. Effective as of January 1, 2017, Alberta enacted the Climate Leadership Act (Climate Act). The Climate Act implements an economy-wide carbon levy on greenhouse gas emissions resulting from the combustion of fuels for heating and transportation on consumers and larger facilities and operations not otherwise subject to a
54 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Carbon Competitiveness Regulation (CCR), which will replace the current SGER in 2018.
Under the CCR, facilities emitting over 100,000 tonnes per annum pay the economy-wide carbon levy, but in order to address competitiveness concerns of trade-exposed sectors like the oil sands, the CCR will provide facilities with output-based allocation credits up to a pre-determined performance benchmark. Further, the Alberta Oil Sands Emissions Limit Act (the OSELA) sets a limit of 100 Mt per year in the oil sands sector, excluding emissions from cogeneration and new upgrading capacity, allowing for continued growth and development while accelerating emissions reduction technology and operational optimization. The mechanics of implementation and enforcement of the OSELA are currently under review and it is not yet possible to predict the impact on Suncor.
The Province of British Columbia enacted a carbon tax in 2008, which is capped at $30/tonne of CO2e through 2018. The carbon tax is applied on consumption. The purchaser or user of fuels pays the carbon tax, which is collected by Suncor and forwarded on to the government.
Quebec's and Ontario's cap-and-trade systems are linked to the Western Climate Initiative (WCI), an organization set up to help member states and provinces execute their cap-and-trade systems. Allowances and offsets are fungible across the WCI. In Quebec, emitters are required to either reduce their emissions or purchase eligible compliance mechanisms to cover their emissions above a specified cap. The cap and the allocation of free allowances are established by the Province. Suncor's Montreal refinery became subject to Quebec's cap-and-trade system for both its refinery GHG emissions and for emissions from transportation fuels effective January 1, 2015. For the 2015 compliance year, the cost of compliance for the Montreal refinery was $1 million. Similarly, the estimated compliance cost attributed to the Montreal refinery's stationary emissions for 2016 is $1 million. The majority of the compliance costs covering the emissions from transportation fuels are passed through to the customer. Beginning in 2017, Ontario facilities generating more than 25,000 tonnes of GHG emissions per year will be required to participate in the cap-and-trade program, which impacts Suncor's Sarnia refinery. Compliance will be similar to Quebec where Suncor's Sarnia refinery will be subject to both refinery GHG emissions and emissions from the use of transportation fuels.
U.S. GHG Regulations
The U.S. Environmental Protection Agency (U.S. EPA) has established a rule mandating that all large facilities (emitting greater than 25,000 tonnes of CO2e per year, which includes Suncor's refinery in Commerce City, Colorado) must report their GHG emissions. The new U.S. administration has expressed intent to review the mandate of the U.S. EPA. Additionally, the administration is reviewing the U.S.'s continued participation in the Paris Agreement. Suncor is monitoring these developments. The outcome of these reviews could lead to changes to GHG emissions regulations; however, the impact on Suncor, including its Commerce City, Colorado refinery, is unknown at this time.
International Regulations
The European Union Emissions Trading Scheme (EU ETS) applies to Suncor's non-operated offshore assets in the U.K. and Norway sectors of the North Sea. The EU ETS requires that member countries set emissions limits for installations in their country covered by the scheme and assigns such installations an emissions cap. Installations may meet their cap by reducing emissions or by buying allowances from other participants. Phase III of EU ETS includes a transition from free allocation to auctioning allowances.
Land Use
In 2012, the Government of Alberta approved the Lower Athabasca Regional Plan (LARP). The LARP addresses land-use restrictions in the Lower Athabasca region of Alberta, which includes leases in Suncor's Oil Sands operations. The LARP, developed as part of the Land-Use Framework under the Alberta Land Stewardship Act, identifies new conservation areas, as well as management frameworks to ensure the continued regional quality of air, surface water and groundwater. The new conservation areas do not overlap with any of Suncor's leases. The management frameworks formalize a number of regulatory tools that are already used by the government to manage environmental aspects of oil sands development, including the use of environmental cumulative effects management on a regional scale, and may require Suncor to have greater participation in the overall evaluation of environmental issues and emissions in the Lower Athabasca region. The frameworks include the following:
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 55
Health Canada and U.S. EPA guidelines. Regulatory actions will occur when triggers or limits are reached or exceeded.
Suncor is committed to reclaiming and remediating lands affected by our operations. In the past few years, we have improved our tailings management efforts and became the first company to reclaim an oil sands tailings pond and convert a second to a fluid tailings treatment area. Under the TMF, Suncor is required to update the tailings management plans for our Oil Sands Base mine operations and Fort Hills facilities.
The updated tailings management plan submitted for Suncor's Oil Sands Base mine operations is, and the plan for the Fort Hills project will be aligned with the company's principles on mine, tailings and reclamation: (i) establish outcomes that consider and incorporate the interests of Aboriginal communities and other stakeholders; (ii) establish stable closure landscapes integrated into the regional ecosystem; (iii) facilitate progressive reclamation by integrating mine, tailings and reclamation planning to ensure land is reclaimed permanently as early as practicable; (iv) manage life cycle costs and net environmental impacts; and (v) recognize the importance of flexibility and choices in order to incorporate innovations throughout the mine life.
Reclamation
The Government of Alberta's MFSP holds oil sands miners responsible for all aspects of the remediation and surface reclamation work at their mine sites, and for the custody of the site until a reclamation certificate has been issued by the government. The MFSP requires a base amount of security for each project, which Suncor has provided in the form of letters of credit, and which would provide the funds necessary to safely secure and reclaim the site. Suncor is in compliance with the MFSP. Additional security may be required under other conditions, such as failure to meet current reclamation plans, or when the estimated remaining production life of the mine reaches certain levels; however, Suncor has not been required to provide any additional security to date. The MFSP has been designed by the Government of Alberta to include a periodic review of the program to ensure it is functioning properly and provide early warning of any potential risks. The MFSP is expected to be revised in 2017 in relation to the TMF to include a tailings management action, integrated water management and tailings reclamation.
Joint Canada-Alberta Implementation Plan for Oil Sands Monitoring
In 2012, Canada and Alberta adopted the Joint Canada-Alberta Implementation Plan for Oil Sands Monitoring (Monitoring Plan). The intent of the Monitoring Plan is to provide scientifically rigorous, comprehensive, integrated and transparent environmental monitoring, including an improved understanding of the cumulative environmental impact of oil sands development. The total costs to the industry of enhanced monitoring under the Monitoring
56 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Plan have been estimated at approximately $50 million per year. The costs to Suncor under the Monitoring Plan are estimated at approximately $10 million per year.
Industry Collaboration Initiatives
Environmentally focused collaboration between companies and stakeholders is an important focus for the oil sands industry. Suncor is a founding member of Canada's Oil Sands Innovation Alliance (COSIA) and is committed to collaborative action to accelerate improvements in environmental performance, including tailings, water, land and GHG emissions. COSIA works with other collaborative networks to share knowledge and expertise about new technologies and innovation related to environmental performance.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 57
Suncor is committed to a proactive program of enterprise risk management intended to enable decision-making through consistent identification and assessment of risks inherent to its assets, activities and operations. Some of these risks are common to operations in the oil and gas industry as a whole, while some are unique to Suncor.
Volatility of Commodity Prices
Our financial performance is closely linked to prices for crude oil in our upstream business and prices for refined petroleum products in our downstream business, and, to a lesser extent, to natural gas prices in our upstream business, where natural gas is both an input and output of production processes. The prices for all of these commodities can be influenced by global and regional supply and demand factors, which are factors that are beyond our control and can result in a high degree of price volatility.
Crude oil prices are also affected by, among other things, global economic health and global economic growth (particularly in emerging markets), pipeline constraints, regional and international supply and demand imbalances, political developments, compliance or non-compliance with quotas agreed upon by OPEC members and other countries, decisions by OPEC not to impose quotas on its members, access to markets for crude oil, and weather. These factors impact the various types of crude oil and refined products differently and can impact differentials between light and heavy grades of crude oil (including blended bitumen), and between conventional and synthetic crude oil.
Refined petroleum product prices and refining margins are also affected by, among other things, crude oil prices, the availability of crude oil and other feedstock, levels of refined product inventories, regional refinery availability, marketplace competitiveness, and other local market factors. Natural gas prices in North America are affected primarily by supply and demand, and by prices for alternative energy sources. Decreases in product margins or increases in natural gas prices could have a material adverse effect on Suncor's financial condition and reserves.
In addition, oil and natural gas producers in North America, and particularly in Canada, may receive discounted prices for their production relative to certain international prices, due to constraints on the ability to transport and sell such products to international markets. A failure to resolve such constraints may result in continued discounted or reduced commodity prices realized by oil and natural gas producers such as Suncor. Suncor's production from Oil Sands includes significant quantities of bitumen and SCO that trade at a discount to light and medium crude oil. Bitumen and SCO are typically more expensive to produce and process. In addition, the market prices for these products may differ from the established market indices for light and medium grades of crude oil. As a result, the price received for bitumen and SCO may differ from the benchmark they are priced against. Future quality differentials are uncertain and a significant increase could have a material adverse effect on Suncor's financial condition and reserves.
Since the latter half of 2014, world oil prices have declined significantly. While world oil prices have moderately recovered from the low prices that have been experienced since the latter half of 2014, due in part to recently agreed upon quotas by OPEC and certain non-OPEC countries, there can be no assurances that this price recovery will continue or can be sustained. Failure by OPEC and these non-OPEC countries to meet or maintain their agreed upon quotas, in addition to the other factors discussed above, could cause world oil prices to decrease and such decrease could be significant and also lead to greater price volatility. A prolonged period of low and/or volatile commodity prices, particularly for crude oil, could have a material adverse effect on Suncor's business, financial condition, cash flows, reserves, and may also lead to the impairment of assets, or the cancellation or deferral of Suncor's growth projects.
Major Operational Incidents (Safety, Environmental and Reliability)
Each of Suncor's primary operating businesses Oil Sands, E&P, and Refining and Marketing requires significant levels of investment in the design, operation and maintenance of facilities, and carries the additional economic risk associated with operating reliably or enduring a protracted operational outage.
The company's businesses also carry the risks associated with environmental and safety performance, which is closely scrutinized by governments, the public and the media, and could result in a suspension of or inability to obtain regulatory approvals and permits, or, in the case of a major environmental or safety incident, fines, civil suits or criminal charges against the company.
Generally, Suncor's operations are subject to operational hazards and risks such as, amongst others, fires (including forest fires), explosions, blow-outs, power outages, severe winter climate conditions and other extreme weather conditions, railcar incidents or derailments, the migration of harmful substances such as oil spills, gaseous leaks or a release of tailings into water systems, pollution and other environmental risks, and accidents, any of which can interrupt operations or cause personal injury or death, or damage to property, equipment, the environment, and information technology systems and related data and control systems.
The reliable operation of production and processing facilities at planned levels and Suncor's ability to produce
58 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
higher value products can also be impacted by failure to follow operating procedures or operate within established operating parameters, equipment failure through inadequate maintenance, unanticipated erosion or corrosion of facilities, manufacturing and engineering flaws, and labour shortage or interruption. The company is also subject to operational risks such as sabotage, terrorism, trespass, theft and malicious software or network attacks.
In addition to the foregoing factors that affect Suncor's business generally, each business unit is susceptible to additional risks due to the nature of its business, including, amongst others, the following:
Although the company maintains a risk management program, which includes an insurance component, such insurance may not provide adequate coverage in all circumstances, nor are all such risks insurable. It is possible that our insurance coverage will not be sufficient to address the costs arising out of the allocation of liabilities and risk of loss arising from Suncor operations.
The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, results of operations, reserves and cash flow. Refer also to Statement of Reserves Data and Other Oil and Gas Information Significant Risk Factors and Uncertainties Affecting Reserves.
Government/Regulatory Policy and Compliance
Suncor operates under federal, provincial, state and municipal legislation in numerous countries. The company is also subject to regulation and intervention by governments in oil and gas industry matters, such as land tenure, royalties, taxes (including income taxes), government fees, production rates, environmental protection controls, safety performance, the reduction of GHG and other emissions, the export of crude oil, natural gas and other products, the company's interactions with foreign governments, the awarding or acquisition of exploration and production rights, oil sands leases or other interests, the imposition of specific drilling obligations, control over the development and abandonment of fields and mine sites (including restrictions on production) and possibly expropriation or cancellation of contract rights.
Before proceeding with most major projects, including significant changes to existing operations, Suncor must obtain various federal, provincial, state and municipal permits and regulatory approvals. Suncor must also obtain licences to operate certain assets. These processes can involve, among other things, Aboriginal and stakeholder consultation, environmental impact assessments and public hearings, and may be subject to conditions, including security deposit obligations and other commitments. Suncor can also be indirectly impacted by a third party's inability to obtain regulatory approval for a shared infrastructure project or a third-party infrastructure project on which a portion of Suncor's business depends. Compliance can also be affected by the loss of skilled staff, inadequate internal processes and compliance auditing.
As part of ongoing operations, the company is also required to comply with a large number of EH&S regulations under a variety of Canadian, U.S., U.K. and other foreign, federal, provincial, territorial, state and municipal laws and regulations. Failure to comply with these regulations may result in the imposition of fines and penalties, production constraints, reputational damage, denial of operating and growth permit applications,
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 59
censure, liability for cleanup costs and damages, and the loss of important licences and permits.
Failure to obtain, comply with or maintain regulatory permits and approvals, or failure to obtain them on a timely basis or on satisfactory terms, could result in delays, abandonment or restructuring of projects and increased costs, all of which could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Changes in government policy (including trade policies affecting energy resource exports) or regulation, or the interpretation thereof, or opposition to Suncor's projects or third-party pipeline and infrastructure projects that delays or prevents necessary permits or regulatory approvals could impact Suncor's operations and existing and planned projects. More recently, obtaining such approvals or permits has become more difficult due to increased public opposition and consultation, including Aboriginal consultation requirements. The result of these developments could also lead to additional compliance costs and staffing and resource levels, and also increase exposure to other risks to Suncor's business, including environmental or safety non-compliance and permit approvals, all of which could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow. Refer to the Industry Conditions section of this AIF.
Carbon Risk
Public support for climate change action and receptivity to new technologies has grown in recent years. Governments in Canada and around the world have responded to these shifting societal attitudes by adopting ambitious emissions reduction targets and supporting legislation, including measures relating to carbon pricing, clean energy and fuel standards, and alternative energy incentives and mandates. There has also been increased activism and public opposition to fossil fuels and oil sands in particular. Refer to the Industry Conditions Environmental Regulation Climate Change section of this AIF.
Existing and future laws and regulations may impose significant liabilities on a failure to comply with their requirements. Concerns over climate change and fossil fuel extraction could lead governments to enact additional or more stringent laws and regulations applicable to Suncor and other companies in the energy industry.
Environmental regulation, including regulation relating to climate change, could impact the demand for, formulation or quality of our products, or could require increased capital expenditures, operating expenses and distribution costs, which may or may not be recoverable in the marketplace. In addition, such regulatory changes could necessitate that Suncor develop new technologies. Such technology development could require a significant investment of capital and time and any delay in or failure to develop such technologies could prevent Suncor from obtaining regulatory approvals for projects or being able to successfully compete with other companies. Increasing environmental regulation in the jurisdictions in which Suncor operates may also make it difficult for Suncor to compete with companies operating in other jurisdictions with fewer or less costly regulations. The complexity and breadth of changes in environmental regulation make it extremely difficult to predict the potential impact to Suncor.
Suncor continues to actively monitor the international and domestic efforts to address climate change. While it currently appears that GHG regulations and targets will continue to become more stringent, and while Suncor will continue efforts to reduce the intensity of its GHG emissions, the absolute GHG emissions of our company are expected to rise as we pursue a growth strategy. Increases in GHG emissions may impact the profitability of our projects, as Suncor will be subject to incremental levies and taxes. There is also a risk that Suncor could face litigation initiated by third parties relating to climate change. In addition, the mechanics of implementation and enforcement of the OSELA are currently under review and it is not yet possible to predict the impact on Suncor. However, such impact could be material.
These developments and further such developments in the future could adversely impact the demand for Suncor's products, the ability of Suncor to maintain and grow its production and reserves, and Suncor's reputation and could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Environmental Compliance
Tailings Management
There are risks associated with Suncor's tailings management plans, including with respect to joint arrangements in which Suncor has an interest. Each mine is required under the Tailings Directive to update its mine fluid tailings management plans. If those plans are not approved in the timelines anticipated or at all, the operators' ability to implement additional fluid tailings treatment facilities could be adversely impacted, which could result in reductions in production and lower volumes of treated tailings. If the mine exceeds certain compliance levels specified in the TMF, the applicable company could be subject to enforcement actions, including being required to curtail production, and financial consequences, including being subject to a compliance levy or being required to post additional security under the MFSP. The full impact of the TMF, including the financial consequences of exceeding compliance levels, is not yet fully known, as certain associated policies and regulations are still under
60 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
development. Such policies and regulations could also restrict the technologies that the company may employ for tailings management, which could adversely impact the company's business plans. There could also be risks if the company's tailings management operations fail to operate as anticipated. The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Alberta's Land-Use Framework (LARP)
The implementation of, and compliance with, the terms of the LARP may adversely impact our current properties and projects in northern Alberta due to, among other things, environmental limits and thresholds. The impact of the LARP on Suncor's operations may be outside of the control of the company, as Suncor's operations could be impacted as a result of restrictions imposed due to the cumulative impact of development by the other operators in the area and not solely in relation to Suncor's direct impact. The changes in Suncor's business or operations required as a result of the LARP could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Alberta Environment Water Licences
We currently rely on water obtained under licences from Alberta Environment to provide domestic and utility water at our Oil Sands operations. Water licences, like all regulatory approvals, contain conditions to be met in order to maintain compliance with the licence. There can be no assurance that the licences to withdraw water will not be rescinded or that additional conditions will not be added. It is also possible that regional water management approaches may require water sharing agreements between stakeholders. In addition, the expansion of the company's projects may rely on securing licences for additional water withdrawal, and there can be no assurance that these licences will be granted or that they will be granted on terms favourable to Suncor.
There is also a risk that future laws or changes to existing laws or regulations relating to water access could cause capital expenditures and operating expenses relating to water licence compliance to increase.
The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Market Access
Suncor anticipates higher production of bitumen in future years, due mainly to production growth from Fort Hills. The markets for bitumen blends or heavy crude are more limited than those for light crude, making them more susceptible to supply and demand changes and imbalances (whether as a result of the availability, proximity, and capacity of pipeline facilities, railcars, or otherwise). Heavy crude oil generally receives lower market prices than light crude, due principally to the lower quality and value of the refined product yield and the higher cost to transport the more viscous product on pipelines, and this price differential can be amplified due to supply and demand imbalances. A shortage of condensate to transport bitumen may cause Suncor's cost to increase due to the need to purchase alternative diluent supplies, thereby increasing the cost to transport bitumen to market and increasing Suncor's operating costs, as well as affecting Suncor's bitumen blend marketing strategy.
Market access for oil sands production may be constrained by insufficient pipeline takeaway capacity, including as a result of the lack of new pipelines due to an inability to secure required approvals and negative public perception. There is a risk that constrained market access for oil sands production, growing inland production and refinery outages will potentially create widening differentials that could impact the profitability of product sales, which could have a material adverse effect on our business, financial condition, reserves, results of operations and cash flow.
Information Security
The efficient operation of Suncor's business is dependent on computer hardware and software systems. In the ordinary course of Suncor's business, Suncor collects and stores sensitive data, including intellectual property, proprietary business information and identifiable personal information of our employees and retail customers. Our operations are also dependent upon a large and complex information framework. We rely on industry accepted security measures and technology to protect Suncor's information systems and securely maintain confidential and proprietary information stored on our information systems, and have adopted a continuous process to identify, assess and manage threats to the company's information systems. Suncor's information security risk oversight is conducted by the Governance Committee. However, these measures and technology may not be adequate due to the increasing volume and sophistication of cyber threats. Suncor's information technology and infrastructure, including process control systems, may be vulnerable to attacks by hackers and cyberterrorists motivated by, among others, geopolitical, financial or activist reasons, or breached due to employee error, malfeasance or other disruptions. Any such attack or breach could compromise Suncor's networks and the information Suncor stores could be accessed, publicly disclosed, lost, stolen or compromised. Any such attack, breach, access, disclosure or loss of information could result in legal claims or proceedings, liability under laws that protect the privacy of personal information, regulatory penalties, disruptions to Suncor's operations,
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 61
decreased performance and production, increased costs, and damage to Suncor's reputation, which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow. Although the company maintains a risk management program, which includes an insurance component that may provide coverage for certain impacts of attacks to or breaches of Suncor's information technology and infrastructure, including process control systems, such insurance does not address all such impacts and may not provide adequate coverage in all circumstances, nor are all such risks insurable. It is possible that our insurance coverage will not be sufficient to address the costs and impacts of any such attack or breach.
Project Execution
There are certain risks associated with the execution of our major projects and the commissioning and integration of new facilities within our existing asset base.
Project execution risk consists of three related primary risks:
Project execution can also be impacted by:
The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Change Capacity
In order to achieve Suncor's business objectives, the company must operate efficiently, reliably and safely, and, at the same time, deliver growth and sustaining projects safely, on budget and on schedule. The ability to achieve these two sets of objectives is critically important for Suncor to deliver value to shareholders and stakeholders. These ambitious business objectives compete for resources, and may negatively impact the company should there be inadequate consideration of the cumulative impacts of prior and parallel initiatives on people, processes and systems. There is also a risk that these objectives may exceed Suncor's capacity to adopt and implement change. The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Joint Arrangement Risk
Suncor has entered into joint arrangements and other contractual arrangements with third parties with respect to certain of its projects, including arrangements where other entities operate assets in which Suncor has ownership or other interests. These joint arrangements include, amongst others, those with respect to Syncrude, Fort Hills, and operations in Suncor's E&P Canada and E&P International businesses. The success and timing of Suncor's activities on assets and projects operated by others, or developed jointly with others, depend upon a number of factors that are outside of Suncor's control, including the timing and amount of capital expenditures, the timing and amount of operational and maintenance expenditures, the operator's expertise, financial resources and risk management practices, the approval of other participants, and the selection of technology.
These co-owners may have objectives and interests that do not coincide with and may conflict with Suncor's interests. Major capital decisions affecting joint arrangements may
62 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
require agreement among the co-owners, while certain operational decisions may be made solely at the discretion of the operator of the applicable assets. While joint venture counterparties may generally seek consensus with respect to major decisions concerning the direction and operation of the assets and the development of projects, no assurance can be provided that the future demands or expectations of the parties relating to such assets and projects will be met satisfactorily or in a timely manner. Failure to satisfactorily meet demands or expectations by all of the parties may affect our participation in the operation of such assets or in the development of such projects, our ability to obtain or maintain necessary licences or approvals, or the timing for undertaking various activities. In addition, disputes may arise pertaining to the timing and/or capital commitments with respect to projects that are being jointly developed, which could materially adversely affect the development of such projects and Suncor's business and operations.
The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Financial Risks
Energy Trading and Risk Management Activities and the Exposure to Counterparties
The nature of Suncor's energy trading and risk management activities, which may make use of derivative financial instruments to hedge its commodity price and other market risks, creates exposure to significant financial risks, which include, but are not limited to, the following:
The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Exchange Rate Fluctuations
Our audited Consolidated Financial Statements are presented in Canadian dollars. The majority of Suncor's revenues from the sale of oil and natural gas are based on prices that are determined by, or referenced to, U.S. dollar benchmark prices, while the majority of Suncor's expenditures are realized in Canadian dollars. The company also holds substantial amounts of U.S. dollar debt. Suncor's results, therefore, can be affected significantly by the exchange rates between the Canadian dollar and the U.S. dollar. The company also undertakes operations administered through international subsidiaries and, so, to a lesser extent, Suncor's results can be affected by the exchange rates between the Canadian dollar and the euro, the British pound and the Norwegian krone. These exchange rates may vary substantially and may give rise to favourable or unfavourable foreign currency exposure. A decrease in the value of the Canadian dollar relative to the U.S. dollar will increase the revenues received from the sale of commodities. An increase in the value of the Canadian dollar relative to the U.S. dollar will decrease revenue received from the sale of commodities. A decrease in the value of the Canadian dollar relative to the U.S. dollar from the previous balance sheet date increases the amount of Canadian dollars required to settle U.S. dollar denominated obligations. As at December 31, 2016, the Canadian dollar strengthened slightly in relation to the U.S. dollar to 0.74 from 0.72 at the start of 2016. Exchange rate fluctuations could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Interest Rate Risk
We are exposed to fluctuations in short-term Canadian and U.S. interest rates as Suncor maintains a portion of its debt capacity in revolving and floating rate bank facilities and commercial paper, and invests surplus cash in short-term debt instruments. We are also exposed to interest rate risk when debt instruments are maturing and require refinancing, or when new debt capital needs to be raised. We are also exposed to changes in interest rates on derivative instruments used to manage the debt portfolio, including hedges of prospective new debt issuances. Unfavourable changes in interest rates could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Issuance of Debt and Debt Covenants
Suncor expects that future capital expenditures will be financed out of cash balances and cash equivalents, cash flow provided by operating activities, available committed credit facilities, issuing commercial paper and, if needed, divesting of non-core assets and accessing capital markets. This ability is dependent on, among other factors,
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 63
commodity prices, the overall state of the capital markets and investor appetite for investments in the energy industry generally and our securities in particular. To the extent that external sources of capital become limited or unavailable or available on unfavourable terms, our ability to make capital investments and maintain existing properties may be constrained.
If we finance capital expenditures in whole or in part with debt, that may increase our debt levels above industry standards for oil and gas companies of similar size. Depending on future development plans, we may require additional debt financing that may not be available or, if available, may not be available on favourable terms, including higher interest rates and fees. Neither the articles of Suncor (the Articles) nor its bylaws limit the amount of indebtedness that we may incur; however, we are subject to covenants in our existing bank facilities and seek to avoid an unfavourable cost of debt. The level of our indebtedness, from time to time, could impair our ability to obtain additional financing on a timely basis to take advantage of business opportunities that may arise and could negatively affect our credit ratings.
We are required to comply with financial and operating covenants under existing credit facilities and debt securities. We routinely review the covenants based on actual and forecast results and have the ability to make changes to our development plans, capital structure and/or dividend policy to comply with covenants under the credit facilities. If Suncor does not comply with the covenants under its credit facilities and debt securities, there is a risk that repayment could be accelerated and/or the company's access to capital could be restricted or only be available on unfavourable terms.
Rating agencies regularly evaluate the company and our subsidiaries. Their ratings of our long-term and short-term debt are based on a number of factors, including our financial strength, as well as factors not entirely within our control, including conditions affecting the oil and gas industry generally, and the wider state of the economy. Credit ratings may be important to customers or counterparties when we compete in certain markets and when we seek to engage in certain transactions, including transactions involving over-the-counter derivatives. There is a risk that one or more of our credit ratings could be downgraded, which could potentially limit our access to private and public credit markets and increase the company's cost of borrowing.
The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Third-Party Service Providers
Suncor is reliant on the operational integrity of a large number of third-party service providers, including input and output commodity transport (pipelines, rail, trucking, marine) and utilities associated with various Suncor facilities, including electricity. A disruption in service by one of these third parties can also have a dramatic impact on Suncor's operations. Pipeline constraints that affect takeaway capacity or supply of inputs, such as hydrogen and power for example, could impact our ability to produce at capacity levels. Disruptions in pipeline service could adversely affect commodity prices, Suncor's price realizations, refining operations and sales volumes, or limit our ability to produce and deliver production. These interruptions may be caused by the inability of the pipeline to operate or by the oversupply of feedstock into the system that exceeds pipeline capacity. Short-term operational constraints on pipeline systems arising from pipeline interruption and/or increased supply of crude oil have occurred in the past and could occur in the future. There is a risk that third-party outages could impact Suncor's production or price realizations, which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Royalties and Taxes
Suncor is subject to royalties and taxes imposed by governments in numerous jurisdictions.
Royalties can be impacted by changes in crude oil and natural gas pricing, production volumes, and capital and operating costs, by changes to existing legislation or PSCs, and by results of regulatory audits of prior year filings and other such events. The final determination of these events may have a material impact on the company's royalties expense.
An increase in Suncor's royalties expense, income taxes, property taxes, carbon taxes, tariffs, duties, border taxes, and other taxes and government-imposed compliance costs, could have a material adverse effect on Suncor's business, financial condition, reserves, results of operations and cash flow.
Foreign Operations
The company has operations in a number of countries with different political, economic and social systems. As a result, the company's operations and related assets are subject to a number of risks and other uncertainties arising from foreign government sovereignty over the company's international operations, which may include, among other things:
64 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
If a dispute arises in the company's foreign operations, the company may be subject to the exclusive jurisdiction of foreign courts or may not be able to subject foreign persons to the jurisdiction of a court in Canada or the U.S. In addition, as a result of activities in these areas and a continuing evolution of an international framework for corporate responsibility and accountability for international crimes, there is a risk the company could also be exposed to potential claims for alleged breaches of international or local law.
The impact that future potential terrorist attacks, regional hostilities or political violence may have on the oil and gas industry, and on our operations in particular, is not known at this time. This uncertainty may affect operations in unpredictable ways, including disruptions of fuel supplies and markets, particularly crude oil, and the possibility that infrastructure facilities, including pipelines, production facilities, processing plants and refineries, could be direct targets of, or collateral damage of, an act of terror, political violence or war. Suncor may be required to incur significant costs in the future to safeguard our assets against terrorist activities or to remediate potential damage to our facilities. There can be no assurance that Suncor will be successful in protecting itself against these risks and the related financial consequences.
Despite Suncor's training and policies around bribery and other forms of corruption, there is a risk that Suncor, or some of its employees or contractors, could be charged with bribery or corruption. Any of these violations could result in onerous penalties. Even allegations of such behaviour could impair Suncor's ability to work with governments or non-government organizations and could result in the formal exclusion of Suncor from a country or area, sanctions, fines, project cancellations or delays, the inability to raise or borrow capital, reputational impacts and increased investor concern.
The occurrence of any of the foregoing could have a material adverse effect on Suncor's business, financial condition, results of operations, reserves and cash flow.
Technology Risk
There are risks associated with growth and other capital projects that rely largely or partly on new technologies and the incorporation of such technologies into new or existing operations, including that the results of the application of new technologies may differ from simulated or test environments. The success of projects incorporating new technologies cannot be assured. Advantages accrue to companies that can develop and adopt emerging technologies in advance of competitors. The inability to develop, implement and monitor new technologies may impact the company's ability to develop its new or existing operations in a profitable manner, which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Skills, Resource Shortage and Reliance on Key Personnel
The successful operation of Suncor's businesses and our ability to expand operations will depend upon the availability of, and competition for, skilled labour and materials supply. There is a risk that we may have difficulty sourcing the required labour for current and future operations. The risk could manifest itself primarily through an inability to recruit new staff without a dilution of talent, to train, develop and retain high-quality and experienced staff without unacceptably high attrition, and to satisfy an employee's work/life balance and desire for competitive compensation. The labour market in Alberta has been historically tight, and while the current economic situation has partially moderated this effect, it remains a risk to be managed. The increasing age of our existing workforce adds further pressure. Materials may also be in short supply due to smaller labour forces in many manufacturing operations. Our ability to operate safely and effectively and complete all our projects on time and on budget has the potential to be significantly impacted by these risks and this impact could be material.
Our success also depends in large measure on certain key personnel. The loss of the services of such key personnel could have a material adverse effect on the company. The contributions of the existing management team to the immediate and near-term operations of the company are likely to continue to be of central importance for the foreseeable future.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 65
Labour Relations
Hourly employees at our Oil Sands facilities, all of our refineries, certain of our terminal and distribution operations, and our Terra Nova FPSO are represented by labour unions or employee associations. Approximately 34% of the company's employees were covered by collective agreements at the end of 2016. Negotiations for a new collective agreement are in progress with Unifor at Suncor's Montreal refinery and at Terra Nova. Any work interruptions involving our employees (including as a result of the failure to successfully negotiate new collective agreements with Unifor), contract trades utilized in our projects or operations, or any jointly owned facilities operated by another entity, present a significant risk to the company and could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Competition
The global petroleum industry is highly competitive in many aspects, including the exploration for and the development of new sources of supply, the acquisition of crude oil and natural gas interests, and the refining, distribution and marketing of refined petroleum products. We compete in virtually every aspect of our business with other energy companies. The petroleum industry also competes with other industries in supplying energy, fuel and related products to consumers.
For Suncor's Oil Sands segment, a number of other companies have entered, or may enter, the oil sands business and begin producing bitumen and SCO, or expand their existing operations. It is difficult to assess the number, level of production and ultimate timing of all potential new projects or when existing production levels may increase. During recent years, a global focus on the oil sands through increasing industry consolidation that has created competitors with financial capacity has significantly increased the supply of bitumen, SCO and heavy crude oil in the marketplace. Although current commodity pricing has slowed certain larger projects in the short term, the impact of this level of activity on regional infrastructure, including pipelines, has placed stress on the availability and cost of all resources required to build and run new and existing oil sands operations.
For Suncor's Refining and Marketing business, management expects that fluctuations in demand for refined products, margin volatility and overall marketplace competitiveness will continue. In addition, to the extent that our downstream business unit participates in new product markets, it could be exposed to margin risk and volatility from either cost and/or selling price fluctuations.
There is a risk that increased competition could cause costs to increase, put further strain on existing infrastructure and cause margins for refined and unrefined products to be volatile, which could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
Land Claims and Aboriginal Consultation
Aboriginal Peoples have claimed Aboriginal title and rights to portions of Western Canada. In addition, Aboriginal Peoples have filed claims against industry participants relating in part to land claims, which may affect our business.
The requirement to consult with Aboriginal Peoples in respect of oil and gas projects and related infrastructure has also increased in recent years. In addition, the Canadian federal government and the provincial government in Alberta have made a commitment to renew their relationships with Aboriginal Peoples of Canada. The federal government has stated it now fully supports the United Nations Declaration on the Rights of Indigenous Peoples (the Declaration) without qualification and that Canada intends "nothing less than to adopt and implement the Declaration in accordance with the Canadian Constitution." The Alberta government is also currently exploring how best to implement the principles and objectives of the Declaration in a way that is consistent with the Constitution and Alberta law. At this time, it is unclear how the Declaration will be adopted into Canadian law and the impact of the Declaration on the Crown's duty to consult with Aboriginal Peoples.
We are unable to assess the effect, if any, that any such land claims or consultation requirements with Aboriginal Peoples may have on our business, however, the impact may be material.
Litigation Risk
There is a risk that Suncor may be subject to litigation, and claims under such litigation may be material. Various types of claims may be raised in these proceedings, including, but not limited to, environmental damage, breach of contract, product liability, antitrust, bribery and other forms of corruption, tax, patent infringement and employment matters. Litigation is subject to uncertainty and it is possible that there could be material adverse developments in pending or future cases. Unfavourable outcomes or settlements of litigation could encourage the commencement of additional litigation. Suncor may also be subject to adverse publicity and reputational impacts associated with such matters, regardless of whether Suncor is ultimately found liable. There is a risk that the outcome of such litigation may be materially adverse and/or we may be required to incur significant expenses or devote significant resources in defense against such litigation, the success of which cannot be guaranteed.
66 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Dividends
Our payment of future dividends on our common shares will be dependent on, among other things, legislative requirements, our financial condition, results of operations, cash flow, the need for funds to finance ongoing operations, debt covenants and other business considerations as the company's Board considers relevant. There can be no assurance that Suncor will continue to pay dividends in the future.
Control Environment
Based on their inherent limitations, disclosure controls and procedures and internal controls over financial reporting may not prevent or detect misstatements, and even those controls determined to be effective can provide only reasonable assurance with respect to financial statement preparation and presentation. Failure to adequately prevent, detect and correct misstatements could have a material adverse effect on Suncor's business, financial condition, results of operations and cash flow.
DIVIDENDS
The Board of Directors has established a practice of paying dividends on a quarterly basis. Suncor reviews its ability to pay dividends from time to time with regard to legislative requirements, the company's financial position, financing requirements for growth, cash flow and other factors. In July 2014, the Board of Directors approved a per share increase of $0.05 to Suncor's quarterly dividend to $0.28 per common share. The Board approved an increase in the quarterly dividend to $0.29 per share from $0.28 per share in the third quarter of 2015. In 2016, the Board of Directors approved a quarterly dividend of $0.29 per common share. Dividends are paid subject to applicable law, if, as and when declared by the Board.
Year ended December 31 | 2016 | 2015 | 2014 | ||||
|
|||||||
Cash dividends per common share ($) | 1.16 | 1.14 | 1.02 | ||||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 67
DESCRIPTION OF CAPITAL STRUCTURE
The company's authorized share capital is comprised of an unlimited number of common shares, an unlimited number of preferred shares issuable in series designated as senior preferred shares, and an unlimited number of preferred shares issuable in series designated as junior preferred shares.
As at December 31, 2016, there were 1,667,913,629 common shares issued and outstanding. To the knowledge of the Board of Directors and executive officers of Suncor, no person beneficially owns, or exercises control or direction over, securities carrying 10% or more of the voting rights attached to any class of voting securities of the company. The holders of common shares are entitled to attend all meetings of shareholders and vote at any such meeting on the basis of one vote for each common share held. Common shareholders are entitled to receive any dividend declared by the Board on the common shares and to participate in a distribution of the company's assets among its shareholders for the purpose of winding up its affairs. The holders of the common shares shall be entitled to share equally, share for share, in all distributions of such assets.
Petro-Canada Public Participation Act
The Petro-Canada Public Participation Act requires that the Articles of Suncor include certain restrictions on the ownership and voting of voting shares of the company. The common shares of Suncor are voting shares. No person, together with associates of that person, may subscribe for, have transferred to that person, hold, beneficially own or control otherwise than by way of security only, or vote in the aggregate, voting shares of Suncor to which are attached more than 20% of the votes attached to all outstanding voting shares of Suncor. Additional restrictions include provisions for suspension of voting rights, forfeiture of dividends, prohibitions against share transfer, compulsory sale of shares, and redemption and suspension of other shareholder rights. The Board may at any time require holders of, or subscribers for, voting shares, and certain other persons, to furnish statutory declarations as to ownership of voting shares and certain other matters relevant to the enforcement of the restrictions. Suncor is prohibited from accepting any subscription for, and issuing or registering a transfer of, any voting shares if a contravention of the individual ownership restrictions results.
Suncor's Articles, as required by the Petro-Canada Public Participation Act, also include provisions requiring Suncor to maintain its head office in Calgary, Alberta; prohibiting Suncor from selling, transferring or otherwise disposing of all or substantially all of its assets in one transaction, or several related transactions, to any one person or group of associated persons, or to non-residents, other than by way of security only in connection with the financing of Suncor; and requiring Suncor to ensure (and to adopt, from time to time, policies describing the manner in which Suncor will fulfil the requirement to ensure) that any member of the public can, in either official language of Canada (English or French), communicate with and obtain available services from Suncor's head office and any other facilities where Suncor determines there is significant demand for communication with, and services from, that facility in that language.
Credit Ratings
The following information regarding the company's credit ratings is provided as it relates to the company's cost of funds and liquidity. In particular, the company's ability to access unsecured funding markets and to engage in certain collateralized business activities on a cost-effective basis is primarily dependent upon maintaining competitive credit ratings. A lowering of the company's credit rating may also have potentially adverse consequences for the company's funding capacity for growth projects or access to the capital markets, may affect the company's ability, and the cost, to enter into normal course derivative or hedging transactions and may require the company to post additional collateral under certain contracts.
The following table shows the ratings issued by the rating agencies noted therein as of February 28, 2017. The credit ratings are not recommendations to purchase, hold or sell the debt securities inasmuch as such ratings do not comment as to the market price or suitability for a particular investor. Any rating may not remain in effect for any given period of time or may be revised or withdrawn entirely by a rating agency in the future if, in its judgment, circumstances so warrant.
Senior Unsecured |
Outlook |
Canadian Commercial Paper Program |
U.S. Commercial Paper Program |
||||||
|
|||||||||
Standard & Poor's (S&P) | A- | Negative | A-1 (low) | A-2 | |||||
|
|||||||||
Dominion Bond Rating Service (DBRS) | A (low) | Stable | R-1 (low) | Not rated | |||||
|
|||||||||
Moody's Investors Service (Moody's) | Baa1 | Stable | Not rated | P-2 | |||||
|
68 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
S&P credit ratings on long-term debt are on a rating scale that ranges from AAA to D, representing the range of such securities rated from highest to lowest quality. A rating of A by S&P is the third highest of 10 categories. An obligation rated A is somewhat more susceptible to the adverse effects of changes in circumstances and economic conditions than obligations in higher rated categories (AA or AAA); however, the obligor's capacity to meet its financial commitment on the obligation is still strong. The addition of a plus (+) or minus (-) designation after the rating indicates the relative standing within a particular rating category. S&P credit ratings on commercial paper are on a short-term debt rating scale that ranges from A-1 to D, representing the range of such securities rated from highest to lowest quality. A Canadian rating by S&P of A-1 (low) is the third highest of eight categories and a U.S. rating of A-2 is the second highest of six categories, indicating a slightly higher susceptibility to the adverse effects of changes in circumstances and economic conditions than obligations in higher categories; the obligor's capacity to meet its financial commitment on the obligation is satisfactory.
DBRS credit ratings on long-term debt are on a rating scale that ranges from AAA to D, representing the range of such securities rated from highest to lowest. A rating of A by DBRS is the third highest of 10 categories and is assigned to debt securities considered to be of good credit quality, with the capacity for the payment of financial obligations being substantial, but of a lesser credit quality than an AA rating. Entities in the A category may be vulnerable to future events, but qualifying negative factors are considered manageable. All rating categories other than AAA and D also contain designations for (high) and (low). The assignment of a (high) or (low) designation within a rating category indicates relative standing within that category. The absence of either a (high) or (low) designation indicates the rating is in the middle of the category. DBRS's credit ratings on commercial paper are on a short-term debt rating scale that ranges from R-1 (high) to D, representing the range of such securities rated from highest to lowest quality. A rating of R-1 (low) by DBRS is the third highest of 10 categories and is assigned to debt securities considered to be of good credit quality. The capacity for the payment of short-term financial obligations as they fall due is substantial, with overall strength not as favourable as higher rating categories. Entities in this category may be vulnerable to future events, but qualifying negative factors are considered manageable. The R-1 and R-2 commercial paper categories are denoted by (high), (middle) and (low) designations.
Moody's credit ratings are on a long-term debt rating scale that ranges from Aaa to C, which represents the range from highest to lowest quality of such securities rated. A rating of Baa by Moody's is the fourth highest of nine categories. Obligations rated Baa are judged to be medium grade and subject to moderate credit risk and, as such, may possess certain speculative characteristics. For rating categories Aa through Caa, Moody's appends numerical modifiers 1, 2 or 3 to each generic rating classification. The modifier 1 indicates that the obligation ranks in the higher end of its generic rating category; the modifier 2 indicates a mid-range ranking; and the modifier 3 indicates a ranking in the lower end of that generic rating category. A rating of P-2 by Moody's for commercial paper is the second highest of four rating categories and indicates a strong ability to repay short-term debt obligations.
Suncor has paid each of S&P, DBRS and Moody's their customary fees in connection with the provision of the above ratings. Suncor has not made any payments to S&P, DBRS or Moody's in the past two years for services unrelated to the provision of such ratings.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 69
Our common shares are listed on the TSX in Canada and on the NYSE in the U.S. The price ranges and the volumes traded on the TSX for the year ended December 31, 2016 are as follows:
TSX
Price Range (Cdn$) |
Trading Volume |
||||||
|
|||||||
High | Low | (000s) | |||||
|
|||||||
2016 | |||||||
|
|||||||
January | 35.90 | 27.32 | 87 386 | ||||
|
|||||||
February | 34.13 | 28.40 | 89 088 | ||||
|
|||||||
March | 36.84 | 32.49 | 79 975 | ||||
|
|||||||
April | 37.47 | 34.96 | 60 510 | ||||
|
|||||||
May | 36.70 | 32.69 | 76 092 | ||||
|
|||||||
June | 36.52 | 33.49 | 111 953 | ||||
|
|||||||
July | 37.27 | 34.51 | 55 683 | ||||
|
|||||||
August | 36.84 | 33.76 | 55 386 | ||||
|
|||||||
September | 36.83 | 34.01 | 58 001 | ||||
|
|||||||
October | 42.14 | 36.03 | 69 867 | ||||
|
|||||||
November | 43.54 | 39.03 | 65 844 | ||||
|
|||||||
December | 44.67 | 42.28 | 57 683 | ||||
|
For information in respect of options to purchase common shares of Suncor and common shares issued upon the exercise of options, see the Share-Based Compensation note to the 2016 audited Consolidated Financial Statements, which is incorporated by reference into this AIF and available on SEDAR at www.sedar.com.
On September 13, 2016, Suncor issued an aggregate of $700 million 3.00% medium term notes, series 5 due in 2026 and an aggregate of $300 million 4.34% medium term notes, series 5 due in 2046.
70 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
DIRECTORS AND EXECUTIVE OFFICERS
Directors
The following individuals are directors of Suncor on the date hereof. The term of each director is from the date of the meeting at which he or she is elected or appointed until the next annual meeting of shareholders or until a successor is elected or appointed.
Suncor Directors Name and Jurisdiction of Residence |
Period Served and Independence |
Biography | |||
|
|||||
Patricia M. Bedient(2)(3) Washington, USA |
Director since 2016 Independent |
Patricia Bedient retired as executive vice president of Weyerhaeuser Company (Weyerhaeuser), one of the world's largest integrated forest products companies, effective July 1, 2016. From 2007 until February 2016, she also served as chief financial officer. Prior thereto she held a variety of leadership roles in finance and strategic planning at Weyerhaeuser after joining the company in 2003. Before joining Weyerhaeuser, she spent 27 years with Arthur Andersen LLP and ultimately served as the managing partner for its Seattle office and partner in charge of the firm's forest products practice. Ms. Bedient serves on the board of directors of Alaska Air Group and Park Hotels and Resorts Inc. and also serves on the Overlake Hospital Medical Center board of trustees, the Oregon State University board of trustees, and the University of Washington Foster School of Business advisory board. She achieved national recognition in 2012 when Wall Street Journal named her one of the Top 25 CFOs in the United States. She is a member of the American Institute of CPAs and the Washington Society of CPAs. Ms. Bedient received her bachelor's degree in business administration, with concentrations in finance and accounting, from Oregon State University in 1975. | |||
|
|||||
Mel E. Benson(1)(2) Alberta, Canada |
Director since 2000 Independent | Mel Benson is president of Mel E. Benson Management Services Inc., an international consulting firm working in various countries with a focus on First Nations/corporate negotiations. Mr. Benson retired from Exxon International and Imperial Oil Canada in 2000 after a long career as an operations manager and senior member of project management. While based in Houston, Texas, Mr. Benson worked on international projects based in Africa and the former Soviet Union. Mr. Benson is a member of Beaver Lake Cree Nation, located in northeast Alberta. In 2015, Mr. Benson was inducted into the Aboriginal Business Hall of Fame and received the lifetime achievement award. | |||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 71
Jacynthe Côté(2)(3) Québec, Canada |
Director since 2015 Independent |
Jacynthe Côté was president and chief executive officer of Rio Tinto Alcan, a metals and mining company, from February 2009 until June 2014 and she continued to serve in an advisory role until her retirement on September 1, 2014. Prior to 2009, she served as president and chief executive officer of Rio Tinto Alcan's Primary Metal business group, following Rio Tinto's acquisition of Alcan Inc. in October 2007. Ms. Côté joined Alcan Inc. in 1988 and she served in a variety of progressively senior leadership roles during her career, including positions in human resources, environment, health and safety, business planning and development, and production/managerial positions in Quebec and England. Ms. Côté is a director of Finning International Inc., the Royal Bank of Canada and TransContinental Inc. She also serves as a member of the advisory board of the Montreal Neurological Institute and of the board of directors of École des Hautes Études Commereciales Montréal. Ms. Côté has a bachelor's degree in chemistry from Laval University. | |||
|
|||||
Dominic D'Alessandro(3)(4) Ontario, Canada |
Director since 2009 Independent |
Dominic D'Alessandro was president and chief executive officer of Manulife Financial Corporation from 1994 to 2009 and is currently a director of CGI Group Inc. For his many business accomplishments, Mr. D'Alessandro was recognized as Canada's Most Respected CEO in 2004 and CEO of the Year in 2002, and was inducted into the Insurance Hall of Fame in 2008. Mr. D'Alessandro is an Officer of the Order of Canada and has been appointed as a Commendatore of the Order of the Star of Italy. In 2009, he received the Woodrow Wilson Award for Corporate Citizenship and in 2005 was granted the Horatio Alger Award for community leadership. Mr. D'Alessandro is a FCA, and holds a Bachelor of Science from Concordia University in Montreal. He has also been awarded honorary doctorates from York University, the University of Ottawa, Ryerson University and Concordia University. | |||
|
72 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
John D. Gass(1)(4) Florida, USA |
Director since 2014 Independent |
John Gass is former vice president, Chevron Corporation, a major integrated oil and gas company, and former president, Chevron Gas and Midstream, positions he held from 2003 until his retirement in 2012. He has extensive international experience, having served in a diverse series of operational positions in the oil and gas industry with increasing responsibility throughout his career. Mr. Gass serves as a director of Southwestern Energy Co. and Weatherford International plc. He is also on the board of visitors for the Vanderbilt School of Engineering and is a member of the advisory board for the Vanderbilt Eye Institute. Mr. Gass graduated from Vanderbilt University in Nashville, Tennessee, with a bachelor's degree in civil engineering. He also holds a master's degree in civil engineering from Tulane University in New Orleans, Louisiana. A resident of Florida, he is a member of the American Society of Civil Engineers and the Society of Petroleum Engineers. | |||
|
|||||
John R. Huff(1)(2) Texas, USA |
Director since 1998 Independent |
John Huff has served as chairman of the board of directors of Oceaneering International, Inc. (Oceaneering) since 1990 and served as its chief executive officer from 1986 to 2006. Prior to joining Oceaneering, he served as chairman, president and chief executive officer of Western Oceanic, Inc. from 1972 to 1986. Mr. Huff is also a director of Hi-Crush Partners LP and serves on the boards of trustees of Baylor College of Medicine and the Georgia Tech Foundation. Mr. Huff is a member of the National Academy of Engineering, a past member of the National Petroleum Council and a past director of the National Ocean Industries Association and the International Association of Drilling Contractors, and served on the U.S. Department of Transportation's National Offshore Safety Advisory Committee. Mr. Huff attended Rice University and received a bachelor's degree in civil engineering from the Georgia Institute of Technology, as well as attended the Harvard Business School's Program for Management Development. Mr. Huff is a registered professional engineer in the state of Texas and a member of The Explorers Club. | |||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 73
Maureen McCaw(3)(4) Alberta, Canada |
Director since 2004 (Petro-Canada 2004 to July 31, 2009) Independent |
Maureen McCaw was most recently executive vice-president of Leger Marketing (Alberta) and formerly president of Criterion Research, a company she founded in 1986. Ms. McCaw is chair of the Edmonton International Airport and CBC Pension Fund Plan board of trustees and is a director of the Canadian Broadcasting Corporation. She also serves on a number of other boards and advisory committees, including the Institute of Corporate Directors, the Nature Conservancy of Canada and MacEwan University, Faculty of Business, as well as being past chair of the Edmonton Chamber of Commerce. Ms. McCaw completed Columbia Business School's executive program in financial accounting and has an ICD.d. | |||
|
|||||
Michael W. O'Brien(3)(4) Alberta, Canada |
Director since 2002 Independent |
Michael O'Brien served as executive vice president, corporate development, and chief financial officer of Suncor Energy Inc. before retiring in 2002. Mr. O'Brien is a director and chair of the Audit Committee of Shaw Communications Inc. In addition, he is past chair of the board of trustees for the Nature Conservancy Canada, past chair of the Canadian Petroleum Products Institute and past chair of Canada's Voluntary Challenge for Global Climate Change. He has previously served on the boards of Terasen Inc., Primewest Energy Inc. and CRA International. | |||
|
|||||
James W. Simpson Alberta, Canada |
Director since 2004 (Petro-Canada 2004 to July 31, 2009) Independent |
James Simpson is past president of Chevron Canada Resources (oil and gas). He serves as lead director for Canadian Utilities Limited and is on its Corporate Governance, Nomination, Compensation and Succession Committee, as well as being the chairman for its Audit & Risk Committee. Mr. Simpson holds a Bachelor of Science and Master of Science, and graduated from the Program for Senior Executives at M.I.T.'s Sloan School of Business. He is also past chairman of the Canadian Association of Petroleum Producers and past vice chairman of the Canadian Association of the World Petroleum Congresses. | |||
|
|||||
Eira M. Thomas(1)(2) British Columbia, Canada |
Director since 2006 Independent |
Eira Thomas is a Canadian geologist with over 20 years of experience, including her previous roles as chief executive officer and a director of Kaminak Gold Corporation, a mineral exploration company, vice president of Aber Resources, now Dominion Diamond Corp., and as founder and CEO of Stornoway Diamond Corp. Currently, Ms. Thomas is a director of Lucara Diamond Corp. | |||
|
74 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Steven W. Williams Alberta, Canada |
Director since December 2011 Non-independent, management |
Steve Williams is president and chief executive officer of Suncor. Steve's career with Suncor began in May 2002 when he was appointed executive vice president, corporate development and chief financial officer. He has also served as executive vice president, oil sands and chief operating officer. Steve has more than 39 years of international energy industry experience, including 18 years at Esso/Exxon. Steve holds a Bachelor of Science degree (Hons.) in chemical engineering from Exeter University and is a fellow of the Institution of Chemical Engineers. He is a graduate of the business economics program at Oxford University as well as the advanced management program at Harvard Business School. Steve has been named to the board of directors of the new Alcoa Corporation. He is a board member of the Business Council of Canada, a member of the Institute of Directors and a member of the McKinsey & Company Canada Advisory Council. He is one of 12 founding CEOs of COSIA and is a member of the advisory board of Canada's Ecofiscal Commission. Steve also serves as vice-chair of the Alberta Premier's Advisory Committee on the Economy. He is active in the community in the support of not-for-profit organizations including serving as co-chair of Indspire's "Building Brighter Futures" campaign. Steve attended the COP21 sessions as an official member of the Government of Canada delegation. In November 2015, he was chosen as the Canadian CEO of the Year by the Globe and Mail, Report on Business Magazine and, in July 2016, was named one of Alberta's 50 most influential people (Alberta Venture Magazine). In January 2017, he was named CEO of the Year by Alberta Oil Magazine. | |||
|
|||||
Michael M. Wilson(1)(4) Alberta, Canada |
Director since 2014 Independent |
Michael Wilson is former president and chief executive officer of Agrium Inc., a retail supplier of agricultural products and services and a wholesale producer and marketer of agricultural nutrients, which is headquartered in Calgary, a position he held from 2003 until his retirement in 2013. He previously served as executive vice president and chief operating officer. Mr. Wilson has significant experience in the petrochemical industry, serving as president of Methanex Corporation, and holding various positions with increasing responsibility in North America and Asia with Dow Chemical Company. Mr. Wilson has a bachelor's degree in chemical engineering from the University of Waterloo and currently serves on the boards of Air Canada, Celestica Inc. and Finning International Inc. He is also the vice chair of the Calgary Prostate Cancer Centre. | |||
|
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 75
Executive Officers
The following individuals are the executive officers of Suncor:
Name | Jurisdiction of Residence | Office | |||
|
|||||
Steve Williams | Alberta, Canada | President and Chief Executive Officer | |||
|
|||||
Mark Little | Alberta, Canada | President, Upstream | |||
|
|||||
Eric Axford | Alberta, Canada | Executive Vice President, Business Services | |||
|
|||||
Alister Cowan | Alberta, Canada | Executive Vice President and Chief Financial Officer | |||
|
|||||
Mike MacSween | Alberta, Canada | Executive Vice President, Major Projects | |||
|
|||||
Steve Reynish | Alberta, Canada | Executive Vice President, Strategy & Corporate Development | |||
|
|||||
Kris Smith | Ontario, Canada | Executive Vice President, Downstream | |||
|
|||||
Paul Gardner | Alberta, Canada | Senior Vice President, Human Resources | |||
|
|||||
Janice Odegaard | Alberta, Canada | Senior Vice President, General Counsel and Corporate Secretary | |||
|
All executive officers have held positions with Suncor over the past five years with the exception of Mr. Cowan who, immediately prior to joining Suncor in 2014, was Chief Financial Officer of Husky Energy Inc.
As at February 24, 2017, the directors and executive officers of Suncor as a group beneficially owned, or controlled or directed, directly or indirectly, common shares of Suncor representing 0.05% of the outstanding common shares of Suncor.
Cease Trade Orders, Bankruptcies, Penalties or Sanctions
As at the date hereof, no director or executive officer of Suncor is or has been within the last 10 years a director, chief executive officer or chief financial officer of a company (including Suncor) that:
As at the date hereof, no director or executive officer of Suncor, or any of their respective personal holding companies, nor any shareholder holding a sufficient number of securities to affect materially the control of Suncor:
No director or executive officer of Suncor has been subject to:
76 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
AUDIT COMMITTEE INFORMATION
The Audit Committee Mandate is attached as Schedule "A" to this AIF.
Composition of the Audit Committee
The Audit Committee is comprised of Mr. O'Brien (Chair), Ms. Bedient, Ms. Côté, Mr. D'Alessandro and Ms. McCaw. All members are independent and financially literate. The education and expertise of each member that has led to the determination of financial literacy is described in the Directors and Executive Officers section of this AIF.
For the purpose of making appointments to the company's Audit Committee, and in addition to the independence requirements, all directors nominated to the Audit Committee must meet the test of financial literacy as determined in the judgment of the Board of Directors. Also, at least one director so nominated must meet the test of financial expert as determined in the judgment of the Board of Directors. The designated financial experts on the Audit Committee are Mr. O'Brien, Ms. Bedient and Mr. D'Alessandro.
Financial Literacy
Financial literacy can be generally defined as the ability to read and understand a balance sheet, an income statement and a cash flow statement. In assessing a potential appointee's level of financial literacy, the Board of Directors evaluates the totality of the individual's education and experience, including:
Audit Committee Financial Expert
An "Audit Committee Financial Expert" means a person who, in the judgment of the Board of Directors, has the following attributes:
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 77
A person shall have acquired the attributes referred to in items (a) through (e) above through:
Audit Committee Pre-Approval Policies for Non-Audit Services
Our Audit Committee has considered whether the provision of services other than audit services is compatible with maintaining our auditors' independence and has a policy governing the provision of these services. A copy of our policy relating to Audit Committee approval of fees paid to our auditors, in compliance with the Sarbanes-Oxley Act of 2002 and applicable Canadian law, is attached as Schedule "B" to this AIF.
Fees Paid to Auditors
Fees paid or payable to PricewaterhouseCoopers LLP, the company's auditors are as follows:
($ thousands) | 2016 | 2015 | |||
|
|||||
Audit Fees | 5 758 | 5 886 | |||
|
|||||
Audit-Related Fees | 415 | 483 | |||
|
|||||
Tax Fees | 15 | 15 | |||
|
|||||
All Other fees | 25 | 25 | |||
|
|||||
Total | 6 213 | 6 409 | |||
|
Audit Fees were paid, or are payable, for professional services rendered by the auditors for the audit of Suncor's annual financial statements, or services provided in connection with statutory and regulatory filings or engagements. Audit-Related Fees were paid for professional services rendered by the auditors for the review of quarterly financial statements and for the preparation of reports on specified procedures as they relate to audits of joint arrangements and attest services not required by statute or regulation. Tax Fees for corporate tax filings and tax planning were paid in a foreign jurisdiction where Suncor has limited activity. All Other Fees were subscriptions to auditor-provided and supported tools. All services described beside the captions "Audit Fees", "Audit-Related Fees", "Tax Fees" and "All Other Fees" were approved by the Audit Committee in compliance with paragraph (c)(7)(i) of Rule 2-01 of Regulation S-X under the U.S. Securities and Exchange Act of 1934, as amended (the Exchange Act). None of the fees described above were approved by the Audit Committee pursuant to paragraph (c)(7)(i)(C) of Regulation S-X under the Exchange Act.
78 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
LEGAL PROCEEDINGS AND REGULATORY ACTIONS
There are no legal proceedings in respect of which we are or were a party, or in respect of which any of our property is or was the subject during the year ended December 31, 2016, nor are there any such proceedings known by us to be contemplated, that involve a claim for damages exceeding 10% of our current assets. In addition, there have not been any (a) penalties or sanctions imposed against the company by a court relating to securities legislation or by a securities regulatory authority during the year ended December 31, 2016, (b) any other penalties or sanctions imposed by a court or regulatory body against the company that would likely be considered important to a reasonable investor in making an investment decision, or (c) settlement agreements entered into by the company before a court relating to securities legislation or with a securities regulatory authority during the year ended December 31, 2016.
INTEREST OF MANAGEMENT AND OTHERS IN MATERIAL TRANSACTIONS
No director or executive officer, or any associate or affiliate of these persons has, or has had, any material interest, direct or indirect, in any transaction or any proposed transaction that has materially affected or is reasonably expected to materially affect Suncor within the three most recently completed financial years or during the current financial year.
TRANSFER AGENT AND REGISTRAR
The transfer agent and registrar for our common shares is Computershare Trust Company of Canada at its principal offices in Calgary, Alberta, Montreal, Quebec, Toronto, Ontario and Vancouver, British Columbia and Computershare Trust Company Inc. in Denver, Colorado.
MATERIAL CONTRACTS
During the year ended December 31, 2016, we did not enter into any contracts, nor are there any contracts still in effect, that are material to our business, other than contracts entered into in the ordinary course of business, which are not required to be filed by Section 12.2 of National Instrument 51-102 Continuous Disclosure Obligations.
INTERESTS OF EXPERTS
Reserves contained in this AIF are based in part upon reports prepared by GLJ and Sproule, Suncor's independent qualified reserves evaluators. As at the date hereof, none of the partners, employees or consultants of GLJ or Sproule, respectively, as a group, through registered or beneficial interests, direct or indirect, held or are entitled to receive more than 1% of any class of our outstanding securities, including the securities of our associates and affiliates.
The company's independent auditors are PricewaterhouseCoopers LLP, Chartered Professional Accountants, who have issued an independent auditor's report dated February 28, 2017 in respect of the company's Consolidated Financial Statements, which comprise the Consolidated Balance Sheets as at December 31, 2016 and December 31, 2015 and the Consolidated Statements of Comprehensive Income (Loss), Changes in Equity and Cash Flows for the years ended December 31, 2016 and December 31, 2015, and the related notes, and the report on internal control over financial reporting as at December 31, 2016. PricewaterhouseCoopers LLP has advised that they are independent with respect to the company within the meaning of the Rules of Professional Conduct of the Chartered Professional Accountants of Alberta and the rules of the United States Securities and Exchange Commission (SEC).
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 79
DISCLOSURE PURSUANT TO THE REQUIREMENTS OF THE NEW YORK STOCK EXCHANGE
As a Canadian issuer listed on the NYSE, we are not required to comply with most of the NYSE's rules and instead may comply with Canadian requirements. As a foreign private issuer, we are only required to comply with four of the NYSE's rules. These rules provide that (i) Suncor must have an audit committee that satisfies the requirements of Rule 10A-3 under the Exchange Act; (ii) the Chief Executive Officer of Suncor must promptly notify the NYSE in writing after an executive officer becomes aware of any material non-compliance with the applicable NYSE rules; (iii) Suncor must provide a brief description of any significant differences between our corporate governance practices and those followed by U.S. companies listed under the NYSE; and (iv) Suncor must provide annual, and as required, written affirmations of compliance with applicable NYSE Corporate Governance Standards.
The company has disclosed in its 2017 management proxy circular, which is available on our website at www.suncor.com, significant areas which the company does not comply with the NYSE Corporate Governance Standards. In certain instances, it is not required to obtain shareholder approval for material amendments to equity compensation plans under TSX requirements, while the NYSE requires shareholder approval of all equity compensation plans. Suncor, while in compliance with the independence requirements of applicable securities laws in Canada (specifically National Instrument 52-110 Audit Committees) and the U.S. (specifically Rule 10A-3 of the Exchange Act), has not adopted, and is not required to adopt, the director independence standards contained in Section 303A.02 of the NYSE's Listed Company Manual, including with respect to its audit committee and compensation committee. The Board has not adopted, nor is it required to adopt, procedures to implement Section 303A.05(c)(iv) of the NYSE's Listed Company Manual in respect of compensation committee advisor independence. Except as described herein, the company is in compliance with the NYSE Corporate Governance Standards in all other significant respects.
ADDITIONAL INFORMATION
Additional information, including directors' and officers' remuneration and indebtedness, principal holders of our securities, and securities authorized for issuance under equity compensation plans, where applicable, is contained in our most recent management proxy circular for our most recent annual meeting of our shareholders that involved the election of directors. Additional financial information is provided in our 2016 audited Consolidated Financial Statements for our most recently completed financial year and in the MD&A.
Further information about Suncor, filed with Canadian securities commissions and the SEC, including periodic quarterly and annual reports and the 40-F, is available online on SEDAR at www.sedar.com and on EDGAR at www.sec.gov. In addition, our Standards of Business Conduct Code is available online at www.suncor.com. Information contained in or otherwise accessible through our website does not form part of this AIF, and is not incorporated into the AIF by reference.
80 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
ADVISORY FORWARD-LOOKING INFORMATION
AND NON-GAAP FINANCIAL MEASURES
This AIF contains certain forward-looking statements and forward-looking information (collectively, forward-looking statements) within the meaning of applicable Canadian and U.S. securities laws and other information based on Suncor's current expectations, estimates, projections and assumptions that were made by the company in light of information available at the time the statement was made and consider Suncor's experience and its perception of historical trends, including expectations and assumptions concerning: the accuracy of reserves and resources estimates; commodity prices and interest and foreign exchange rates; the performance of assets and equipment; capital efficiencies and cost-savings; applicable laws and government policies, including royalty rates and tax laws; future production rates; the sufficiency of budgeted capital expenditures in carrying out planned activities; the availability and cost of labour and services; the satisfaction by third parties of their obligations to Suncor; and the receipt, in a timely manner, of regulatory and third-party approvals. In addition, all other statements and other information that address expectations or projections about the future, and other statements and information about Suncor's strategy for growth, expected and future expenditures or investment decisions, commodity prices, costs, schedules, production volumes, operating and financial results, future financing and capital activities, and the expected impact of future commitments are forward-looking statements. Some of the forward-looking statements may be identified by words like "expects", "anticipates", "will", "estimates", "plans", "scheduled", "intends", "believes", "projects", "indicates", "could", "focus", "vision", "goal", "outlook", "proposed", "target", "objective", "continue", "should", "may", "potential", "future", "opportunity", "would" and similar expressions.
Forward-looking statements in this AIF include references to:
Suncor's expectations about growth and other projects, the performance, costs and development of its assets, production volumes, and capital expenditures, including:
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 81
Also:
Forward-looking statements are not guarantees of future performance and involve a number of risks and uncertainties, some that are similar to other oil and gas companies and some that are unique to Suncor. Suncor's actual results may differ materially from those expressed or implied by its forward-looking statements, so readers are cautioned not to place undue reliance on them.
The financial and operating performance of the company's reportable operating segments, specifically Oil Sands, Exploration and Production, and Refining and Marketing, may be affected by a number of factors.
Factors that affect our Oil Sands segment include, but are not limited to, volatility in the prices for crude oil and other production, and the related impacts of fluctuating light/heavy and sweet/sour crude oil differentials; changes in the demand for refinery feedstock and diesel fuel, including the possibility that refiners that process our proprietary production will be closed, experience equipment failure or other accidents; our ability to operate our Oil Sands facilities reliably in order to meet production targets; the output of newly commissioned facilities, the performance of which may be difficult to predict during initial operations; the possibility that completed maintenance activities may not improve operational performance or the output of related facilities; our dependence on pipeline capacity and other logistical constraints, which may affect our ability to distribute our products to market; our ability to finance Oil Sands growth and sustaining capital expenditures; the availability of bitumen feedstock for upgrading operations, which can be negatively affected by poor ore grade quality, unplanned mine equipment and extraction plant maintenance, tailings storage, and in situ reservoir and equipment performance, or the unavailability of third-party bitumen; inflationary pressures on operating costs, including labour, natural gas and other energy sources used in oil sands processes; our ability to complete projects, including planned maintenance events, both on time and on budget, which could be impacted by competition from other projects (including other oil sands projects) for goods and services and demands on infrastructure in Alberta's Wood Buffalo region and the surrounding area (including housing, roads and schools); risks and uncertainties associated with obtaining regulatory and stakeholder approval for exploration and development activities; changes to royalty and tax legislation and related agreements that could impact our business; the potential for disruptions to operations and construction projects as a result of our relationships with labour unions that represent employees at our facilities; and changes to environmental regulations or legislation.
Factors that affect our Exploration and Production segment include, but are not limited to, volatility in crude oil and natural gas prices; operational risks and uncertainties associated with oil and gas activities, including unexpected formations or pressures, premature declines of reservoirs, fires, blow-outs, equipment failures and other accidents, uncontrollable flows of crude oil, natural gas or well fluids, and pollution and other environmental risks; the possibility that completed maintenance activities may not improve operational performance or the output of related facilities; adverse weather conditions, which could disrupt output from producing assets or impact drilling programs, resulting in increased costs and/or delays in bringing on new production; political, economic and socio-economic risks associated with Suncor's foreign operations, including the unpredictability of operating in Libya due to ongoing political unrest and that operations in Syria continue to be impacted by sanctions or political unrest; risks and uncertainties associated with obtaining regulatory and
82 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
stakeholder approval for exploration and development activities; the potential for disruptions to operations and construction projects as a result of our relationships with labour unions that represent employees at our facilities; and market demand for mineral rights and producing properties, potentially leading to losses on disposition or increased property acquisition costs.
Factors that affect our Refining and Marketing segment include, but are not limited to, fluctuations in demand and supply for refined products that impact the company's margins; market competition, including potential new market entrants; our ability to reliably operate refining and marketing facilities in order to meet production or sales targets; the possibility that completed maintenance activities may not improve operational performance or the output of related facilities; risks and uncertainties affecting construction or planned maintenance schedules, including the availability of labour and other impacts of competing projects drawing on the same resources during the same time period; and the potential for disruptions to operations and construction projects as a result of our relationships with labour unions or employee associations that represent employees at our refineries and distribution facilities.
Additional risks, uncertainties and other factors that could influence the financial and operating performance of all of Suncor's operating segments and activities include, but are not limited to, changes in general economic, market and business conditions, such as commodity prices, interest rates and currency exchange rates; fluctuations in supply and demand for Suncor's products; the successful and timely implementation of capital projects, including growth projects and regulatory projects; competitive actions of other companies, including increased competition from other oil and gas companies or from companies that provide alternative sources of energy; labour and material shortages; actions by government authorities, including the imposition or reassessment of, or changes to, taxes, fees, royalties, duties and other government-imposed compliance costs; changes in environmental and other regulations and policies; the ability and willingness of parties with whom we have material relationships to perform their obligations to us; outages to third-party infrastructure that could cause disruptions to production; the occurrence of unexpected events such as fires (including forest fires), equipment failures and other similar events affecting Suncor or other parties whose operations or assets directly or indirectly affect Suncor; the potential for security breaches of Suncor's information technology and infrastructure by computer hackers or cyberterrorists, and the unavailability or failure of such systems to perform as anticipated as a result of such breaches; our ability to find new oil and gas reserves that can be developed economically; the accuracy of Suncor's reserves, resources and future production estimates; market instability affecting Suncor's ability to borrow in the capital debt markets at acceptable rates; maintaining an optimal debt to cash flow ratio; the success of the company's risk management activities using derivatives and other financial instruments; the cost of compliance with current and future environmental laws, including climate change laws; risks and uncertainties associated with closing a transaction for the purchase or sale of a business, asset or oil and gas property, including estimates of the final consideration to be paid or received, the ability of counterparties to comply with their obligations in a timely manner and the receipt of any required regulatory or other third-party approvals outside of Suncor's control; risks associated with land claims and Aboriginal consultation requirements; risks relating to litigation; and the accuracy of cost estimates, some of which are provided at the conceptual or other preliminary stage of projects and prior to commencement or conception of the detailed engineering that is needed to reduce the margin of error and increase the level of accuracy. The foregoing important factors are not exhaustive.
Many of these risk factors and other assumptions related to Suncor's forward-looking statements are discussed in further detail throughout this AIF, including under the heading Risk Factors, and the company's management's discussion and analysis dated March 1, 2017 and Form 40-F on file with Canadian securities commissions at www.sedar.com and the United States Securities and Exchange Commission at www.sec.gov. Readers are also referred to the risk factors and assumptions described in other documents that Suncor files from time to time with securities regulatory authorities. Copies of these documents are available without charge from the company.
The forward-looking statements contained in this AIF are made as of the date of this AIF. Except as required by applicable securities laws, we assume no obligation to update publicly or otherwise revise any forward-looking statements or the foregoing risks and assumptions affecting such forward-looking statements, whether as a result of new information, future events or otherwise.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 83
Non-GAAP Financial Measures Netback
Netback is a non-GAAP financial measure. Netbacks are reconciled to GAAP measures in the Operating Metrics Reconciliation section of the Supplemental Financial and Operating Information within Suncor's Annual Report for the year ended December 31, 2016 and dated March 1, 2017.
Oil Sands Netbacks
Oil Sands operating netbacks are a non-GAAP measure, presented on a crude product and sales barrel basis, and are derived from the Oil Sands segmented statement of net earnings (loss), after adjusting for items not directly attributable to the revenues and costs associated with production and delivery. Management uses Oil Sands operating netbacks to measure crude product profitability on a sales barrel basis.
Exploration and Production (E&P) Netbacks
E&P netbacks are a non-GAAP measure, presented on an asset location and sales barrel basis, and are derived from the E&P segmented statement of net earnings (loss), after adjusting for items not directly attributable to the costs associated with production and delivery. Management uses E&P operating netbacks to measure asset profitability by location on a sales barrel basis.
84 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
SCHEDULE "A"
AUDIT COMMITTEE MANDATE
The Audit Committee
The by-laws of Suncor Energy Inc. provide that the Board of Directors may establish Board committees to whom certain duties may be delegated by the Board. The Board has established, among others, the Audit Committee, and has approved this mandate, which sets out the objectives, functions and responsibilities of the Audit Committee.
Objectives
The Audit Committee assists the Board of Directors by:
The Committee does not have decision-making authority, except in the very limited circumstances described herein or where and to the extent that such authority is expressly delegated by the Board of Directors. The Committee conveys its findings and recommendations to the Board of Directors for consideration and, where required, decision by the Board of Directors.
Constitution
The Terms of Reference of Suncor's Board of Directors set out requirements for the composition of Board Committees and the qualifications for committee membership, and specify that the Chair and membership of the committees are determined annually by the Board. As required by Suncor's by-laws, unless otherwise determined by resolution of the Board of Directors, a majority of the members of a committee constitute a quorum for meetings of committees, and in all other respects, each committee determines its own rules of procedure.
Functions and Responsibilities
The Audit Committee has the following functions and responsibilities:
Internal Controls
External and Internal Auditors
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 A-1
Financial Reporting and other Public Disclosure
Oil and Gas Reserves
Risk Management
Pension Plan
A-2 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Security
Other Matters
Reporting to the Board
Approved by resolution of the Board of Directors on November 14, 2016
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 A-3
SCHEDULE "B" SUNCOR ENERGY INC. POLICY
AND PROCEDURES
FOR PRE-APPROVAL OF AUDIT AND NON-AUDIT SERVICES
Pursuant to the Sarbanes-Oxley Act of 2002 and Multilateral Instrument 52-110, the Securities and Exchange Commission and the Ontario Securities Commission respectively has adopted final rules relating to audit committees and auditor independence. These rules require the Audit Committee of Suncor Energy Inc. ("Suncor") to be responsible for the appointment, compensation, retention and oversight of the work of its independent auditor. The Audit Committee must also pre-approve any audit and non-audit services performed by the independent auditor or such services must be entered into pursuant to pre-approval policies and procedures established by the Audit Committee pursuant to this policy.
I. Statement of Policy
The Audit Committee has adopted this Policy and Procedures for Pre-Approval of Audit and Non-Audit Services (the "Policy"), which sets forth the procedures and the conditions pursuant to which services proposed to be performed by the independent auditor will be pre-approved. The procedures outlined in this Policy are applicable to all Audit, Audit-Related, Tax Services and All Other Services provided by the independent auditor.
II. Responsibility
Responsibility for the implementation of this Policy rests with the Audit Committee. The Audit Committee delegates its responsibility for administration of this policy to management. The Audit Committee shall not delegate its responsibilities to pre-approve services performed by the independent auditor to management.
III. Definitions
For the purpose of these policies and procedures and any pre-approvals:
"Audit-related services" include:
Non-financial operational audits are not "audit-related" services.
B-1 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
IV. General Policy
The following general policy applies to all services provided by the independent auditor.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 B-2
V. Responsibilities of External Auditors
To support the independence process, the independent auditors will:
In addition, the external auditors will:
VI. Disclosures
Suncor will, as required by applicable law, annually disclose its pre-approval policies and procedures, and will provide the required disclosure concerning the amounts of audit fees, audit-related fees, tax fees and all other fees paid to its outside auditors in its filings with the SEC.
Approved and Accepted April 28, 2004
B-3 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
Appendix A Prohibited Non-Audit Services
An external auditor is not independent if, at any point during the audit and professional engagement period, the auditor provides the following non-audit services to an audit client.
Bookkeeping or other services related to the accounting records or financial statements of the audit client. Any service, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements, including:
Financial information systems design and implementation. Any service, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements, including:
Appraisal or valuation services, fairness opinions or contribution-in-kind reports. Any appraisal service, valuation service or any service involving a fairness opinion or contribution-in-kind report for Suncor, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements.
Actuarial services. Any actuarially-oriented advisory service involving the determination of amounts recorded in the financial statements and related accounts for Suncor other than assisting Suncor in understanding the methods, models, assumptions, and inputs used in computing an amount, unless it is reasonable to conclude that the results of these services will not be subject to audit procedures during an audit of Suncor's financial statements.
Internal audit outsourcing services. Any internal audit service that has been outsourced by Suncor that relates to Suncor's internal accounting controls, financial systems or financial statements, unless it is reasonable to conclude that the result of these services will not be subject to audit procedures during an audit of Suncor's financial statements.
Management functions. Acting, temporarily or permanently, as a director, officer, or employee of Suncor, or performing any decision-making, supervisory, or ongoing monitoring function for Suncor.
Human resources. Any of the following:
Broker-dealer, investment adviser or investment banking services. Acting as a broker-dealer (registered or unregistered), promoter, or underwriter, on behalf of Suncor, making investment decisions on behalf of Suncor or otherwise having discretionary authority over Suncor's investments, executing a transaction to buy or sell Suncor's investment, or having custody of Suncor's assets, such as taking temporary possession of securities purchased by Suncor.
Legal services. Providing any service to Suncor that, under circumstances in which the service is provided, could be provided only by someone licenced, admitted, or otherwise qualified to practice law in the jurisdiction in which the service is prohibited.
Expert services unrelated to the audit. Providing an expert opinion or other expert service for Suncor, or Suncor's legal representative, for the purpose of advocating Suncor's interest in litigation or in a regulatory or administrative proceeding or investigation. In any litigation or regulatory or administrative proceeding or investigation, an accountant's independence shall not be deemed to be impaired if the accountant provides factual accounts, including testimony, of work performed or explains the positions taken or conclusions reached during the performance of any service provided by the accountant for Suncor.
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 B-4
Appendix B Pre-Approval Request Form
NATURE OF WORK | ESTIMATED FEES (Cdn$) |
|
Total | ||
Date | Signature |
B-5 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
SCHEDULE
"C" FORM 51-101F2 REPORT ON RESERVES DATA BY
INDEPENDENT QUALIFIED RESERVES EVALUATOR OR AUDITOR
To the board of directors of Suncor Energy Inc. (the "Company"):
Independent Qualified | Effective Date of |
Location of Reserves (Country or Foreign |
Net Present Value of Future Net Revenue (before income taxes, 10% discount rate, $ millions) |
||||||||||
Reserves Evaluator | Evaluation Report | Geographic Area) | Audited | Evaluated | Reviewed | Total | |||||||
|
|||||||||||||
GLJ Petroleum Consultants Ltd. | December 31, 2016 | Oil Sands In Situ, Canada |
| 23 270 | | 23 270 | |||||||
|
|||||||||||||
GLJ Petroleum Consultants Ltd. | December 31, 2016 | Oil Sands Mining, Canada |
| 30 495 | | 30 495 | |||||||
|
|||||||||||||
| 53 765 | | 53 765 | ||||||||||
|
EXECUTED
as to our report referred to above:
GLJ Petroleum Consultants Ltd., Calgary, Alberta, Canada, March 1, 2017
"Caralyn P. Bennett"
Caralyn
P. Bennett, P.Eng.
Executive Vice President, Chief Strategy Officer
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 C-1
SCHEDULE
"D" FORM 51-101F2 REPORT ON RESERVES DATA BY
INDEPENDENT QUALIFIED RESERVES EVALUATOR OR AUDITOR
To the board of directors of Suncor Energy Inc. (the "Company"):
Independent Qualified | Effective Date of |
Location of Reserves (Country or Foreign |
Net Present Value of Future Net Revenue (before income taxes, 10% discount rate, $ millions) |
||||||||||
Reserves Evaluator | Evaluation Report | Geographic Area) | Audited | Evaluated | Reviewed | Total | |||||||
|
|||||||||||||
Sproule Associates Limited | December 31, 2016 | East Coast Canada, Newfoundland Offshore, Canada |
| 6 037 | | 6 037 | |||||||
|
|||||||||||||
Sproule Associates Limited | December 31, 2016 | North America Onshore, Western Canada |
| 28 | | 28 | |||||||
|
|||||||||||||
Sproule International Limited | December 31, 2016 | North Sea, United Kingdom | | 3 540 | | 3 540 | |||||||
|
|||||||||||||
Sproule International Limited | December 31, 2016 | North Sea, Norway | | 249 | | 249 | |||||||
|
|||||||||||||
| 9 854 | | 9 854 | ||||||||||
|
EXECUTED as to our report referred to above:
Sproule Associates Limited and Sproule International Limited, Calgary, Alberta, Canada, March 1, 2017
"Cameron P. Six"
Cameron
P. Six, P.Eng.
Chief Operating Officer and Director
D-1 SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016
SCHEDULE "E" FORM 51-101F3 REPORT OF MANAGEMENT AND DIRECTORS ON RESERVES DATA AND OTHER INFORMATION
Management of Suncor Energy Inc. (the "Company") are responsible for the preparation and disclosure of information with respect to the Company's oil and gas activities in accordance with securities regulatory requirements. This information includes reserves data.
Independent qualified reserves evaluators have evaluated the Company's reserves data. The reports of the independent qualified reserves evaluators will be filed with securities regulatory authorities concurrently with this report.
The Audit Committee of the board of directors of the Company has:
The Audit Committee of the board of directors has reviewed the Company's procedures for assembling and reporting other information associated with oil and gas activities and has reviewed that information with management. The board of directors has, on the recommendation of the Audit Committee, approved:
Because the reserves data are based on judgments regarding future events, actual results will vary and the variations may be material.
"Steven W. Williams"
STEVEN
W. WILLIAMS
President and Chief Executive Officer
"Mark S. Little"
MARK
S. LITTLE
President, Upstream
"James W. Simpson"
JAMES
W. SIMPSON
Chair of the Board of Directors
"Michael W. O'Brien"
MICHAEL
W. O'BRIEN
Chair of the Audit Committee
March 1, 2017
SUNCOR ENERGY INC. ANNUAL INFORMATION FORM 2016 E-1
Suncor Energy Inc.
150 - 6 Avenue S.W., Calgary, Alberta, Canada T2P 3E3
T: 403 296 8000
suncor.com
UNDERTAKING AND CONSENT TO SERVICE OF PROCESS
A. Undertaking
Suncor Energy Inc. (the "Registrant") undertakes to make available, in person or by telephone, representatives to respond to inquiries made by the staff of the Securities and Exchange Commission ("SEC"), and to furnish promptly, when requested to do so by the SEC staff, information relating to the securities in relation to which the obligation to file an annual report on Form 40-F arises, or transactions in said securities.
B. Consent to Service of Process
The Registrant has filed previously with the SEC a Form F-X in connection with the Common Shares.
DISCLOSURE CONTROLS AND PROCEDURES AND INTERNAL CONTROL OVER FINANCIAL REPORTING
See pages 77 and 78 of Exhibit 99-1 and page 66 of Exhibit 99-2.
ATTESTATION REPORT OF THE REGISTERED PUBLIC ACCOUNTING FIRM
See page 79 of Exhibit 99-1.
AUDIT COMMITTEE FINANCIAL EXPERT
See pages 77 and 78 of Annual Information Form.
See page 27 of Annual Information Form.
FEES PAID TO PRINCIPAL ACCOUNTANT
See page 78 of Annual Information Form.
AUDIT COMMITTEE PRE-APPROVAL POLICIES
See Schedule "B" of Annual Information Form.
APPROVAL OF NON-AUDIT SERVICES
See Schedule "B" of Annual Information Form.
OFF-BALANCE SHEET ARRANGEMENTS
See page 51 of Exhibit 99-2.
TABULAR DISCLOSURE OF CONTRACTUAL OBLIGATIONS
See page 51 of Exhibit 99-2.
IDENTIFICATION OF THE AUDIT COMMITTEE
See page 77 of Annual Information Form.
Pursuant to the requirements of the Exchange Act, the registrant certifies that it meets all of the requirements for filing on Form 40-F and has duly caused this annual report to be signed on its behalf by the undersigned, thereto duly authorized.
|
SUNCOR ENERGY INC. | |||
DATE: March 1, 2017 |
||||
|
PER: |
/s/ ALISTER COWAN |
Exhibit No.
|
Description | ||
---|---|---|---|
99-1 |
Audited Consolidated Financial Statements of Suncor Energy Inc. for the fiscal year ended December 31, 2016 | ||
99-2 |
Management's Discussion and Analysis for the fiscal year ended December 31, 2016, dated March 1, 2017 |
||
99-3 |
Consent of PricewaterhouseCoopers LLP |
||
99-4 |
Consent of GLJ Petroleum Consultants Ltd. |
||
99-5 |
Consent of Sproule Associates Limited and Sproule International Limited |
||
99-6 |
Certificate of the Chief Executive Officer Pursuant to Exchange Act Rules 13a-14(a) or 15d-14(a) |
||
99-7 |
Certificate of the Chief Financial Officer Pursuant to Exchange Act Rules 13a-14(a) or 15d-14(a) |
||
99-8 |
Certificate of the Chief Executive Officer Pursuant to 18 U.S.C. Section 1350, as Enacted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 |
||
99-9 |
Certificate of the Chief Financial Officer Pursuant to 18 U.S.C. Section 1350, as Enacted Pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 |
||
99-10 |
Supplementary Oil and Gas Disclosure |